Summary
Overview
Work History
Education
Skills
Additional Information
Software
Interests
Hobbies
Personal Details
Declaration
Timeline
Generic
Deepak  Thakur

Deepak Thakur

Bridge Design Engineer
Gurgram

Summary

I believe in the principle that "if there is nothing to be struggled,there is nothing to be achieved". and thus strongly believe in putting in my best efforts, giving my loyalty and hardwork so as to get the best results for continuous organizational as well as personal development with patience and perseverance.

Overview

4
4
years of professional experience
6
6
years of post-secondary education
2
2
Languages

Work History

Bridge Design Engineer

Ecstatic Engineering Consultant Private Limited
New Delhi
09.2018 - Current
  • Completed accurate engineering calculations for weights, loads and other metrics using both manual and digital methods.
  • Designed RCC precast and cast in situ box culvert.
  • Designed Pier & abutments with both open and pile foundations.
  • Designed Portal Piers and abutment.
  • designed RCC and PSC Girder with staad modelling.
  • Bearing Loads calculations.
  • Rcc deck slab,gap slab,solid slab with 3d modelling and also with 2D analysis.
  • Designed composite Plate I steel girder.
  • Cast in situ PSC box Girder.
  • PSC pier cap.
  • Load test for bridges.

Education

B.tech - Civil Engineering

BUEST
Baddi,India
07.2012 - 07.2016

M.tech - Structural Engineering (Civil)

SGT University
Gurugram,Haryana
07.2020 - 07.2022

Skills

    Finding Errors & Omission

Technical Skills

Experience in the STAAD, Midas, Excels and most advanced software tools

Additional Information

Contribution in Projects

  • Rehabilitation and Up gradation to four lane Configuration and Strengthening of Rohna /Hassangarh to Jhajjar section from Km. 44.800 to Km. 80.250 of NH334B in the state of Haryana on HAM Basis (Package 2)
  • Redesigning, Rehabilitation and Upgradation to Four Lane Configuration &Strengthening of Sonepat Rohna Section (Package-1 KM. 0.000 to KM. 44.800) of NH-334B in the State of Haryana.
  • Four Laning of Chikhali - Tarsod (Pkg-IIA) Section of NH-6 in the State of Maharashtra Under NHDP Phase IV on Hybrid Annuity Pattern - From Km360.000 To Km 422.700
  • 4/6 Laning of Narnaul Bypass Crossing to Paniyala Mor (NH-148B) (at NH-48 Junction) =31.24Km, Nizampur Link Road=2.76Km &Narnaul Bypass Crossing to Pacheri Kalan = 11.3 Km (NH+11) In the State ofHaryana under Bharatmala Pariyojana on Hybrid Annuity Mode.
  • Construction of four Lane ROB at Km 30.00 on NH-162(Pali-Nadol section crossing the Falna-Marwar Railway section at L/C no.C-67 Near Somesar in the state of Rajasthan)
  • Widening and Reconstruction of Madhya Pradesh Major DistrictRoads Upgradation Project (MPMDRUP)- Package- P-4 (A) (NDB): Padora-Gora-Pichhore Road (MP-MDR-07-09)& Pichhore-Basai Road (MP-MDR-07-03), under Gwalior division (M.P.) Padora Gora Pichhore Road. (MP-MDR-07-09)
  • Construction of Four Lane Elevated Road for an Exclusive Connectivity from PMCH toconstruction Ganga Path at CH. 7+400 Km. at Patna in the state of Bihar on EPC mode.
  • DESIGN AND CONSTRUCTION OF 6-LANE STAND-ALONE GRADESEPARATED STRUCTURE'S AT KM 480+140, KM 514+578,KM 520+387 , AND KM 532+552 IN GONDEVADAPE SECTION OF NH-3 IN THE STATE OF MAHARASHTRA ON EPC MODE
  • CONSTRUCTION OF FLYOVER AT MANDI GOBINDGARH AT (EXISTING KM 260+800) INCLUDING RESURFACING OF EXISTING SERVICE ROAD AT LOCATION OF FLYOVER AT KM 260+800 ONJALANDHAR PANIPAT SECTION OF NH-44 (OLD NH-01) IN THE STATE OF PUNJAB ON EPC BASIS.
  • FOUR LANING OF RAJAULI-BAKHTIYARPUR SECTION OF NEW NH-20 (OLD NH-31) FROM DESIGN CHAINAGE 54+405 TO 101+630 (DESIGN LENGTH 47.225 KM) IN THESTATE OF BIHAR ON HYBRID ANNUITY MODE
  • CONSTRUCTION OF FOUR LANING OF RAJAULI-BAKHTIYARPUR SECTION FROM KM 101+630 KM 152+520 (PACKAGE-III) OF NH-31(NEW NH-20) ON HAM MODE IN THE STATE OF BIHAR
  • 4-Laning of Dewas Ujjain section of Old SH18 from Design Ch. 0+000 to 19+733, Construction-Lane Ujjain Bypass from Design Ch. 19+733 to 26+900 (Part I) and construction of 4-Lane Dewas Bypass from Design Ch.0+000 to 14+520 (Part II) having total Design Length: 41.42 km in the State of Madhya Pradesh on HAM Mode.
  • BALANCE WORK FOR FOUR LANING OF KIRATPUR TO NERCHOWK SECTION OF NH-21 (FROM KM 12+750 TO KM 26+500, KM 126+500 TO KM 158+500 INCLUDING ACC LINK ROAD FROM KM 0+00 TO KM 2+003) GREENFIELD ALIGNMENT (PACKAGE-2) IN THE STATE OF HIMACHAL PRADESH ON HYBRID ANNUITY MODE (HAM)
  • CONSTRUCTION OF 6-LANE NH-344M-PACKEGE-3 (FROM NAGLOI NAJAFGARH ROAD, KM 28+450 TO DWARKA SECTOR 24 ROAD, KM 38+111) IN THE STATE OF DELHI ON EPC MODE
  • DETAILED PROJECT REPORT FOR DEVELOPMENT OF URBAN EXTENSION ROAD (UER-II) SECTION: SPUR CONNECTING BAHADURGARH BY-PASS (FROM KM 26+135 OF NH 344-M/UER II TO BAHADURGARH BY-PASS)

Software

Microsoft office

STAAD

Midas

CAD

Interests

Listening Music

Playing cricket

Traveling

Hobbies

Watching films

cooking

surfing

photography

Personal Details

Name : Deepak Thakur

Father's name : Mr. Desh Raj

Date of Birth :16 May,1995

Permanent Address : Village-Bhadret, P.O- Bhapral, Teh -Ghumarwin, Distt -Bilaspur (H.P) 174027

Contact no. :7807921732,7018423885

Declaration

I hereby declare that the above mentioned information is correct up to my knowledge and i bear responsibility for the correctness of the above mentioned particulars.

Timeline

M.tech - Structural Engineering (Civil)

SGT University
07.2020 - 07.2022

Bridge Design Engineer

Ecstatic Engineering Consultant Private Limited
09.2018 - Current

B.tech - Civil Engineering

BUEST
07.2012 - 07.2016
Deepak ThakurBridge Design Engineer