

Results-driven Manufacturing Excellence professional with 9+ years of experience in HT/LT Motor & Generator Manufacturing, Production Operations, and Lean Six Sigma. Expertise in the assembly, testing, troubleshooting, repair, and refurbishment of motors and generators up to 25 MW. Proven ability to improve productivity, quality, and operational efficiency through continuous improvement and Lean Manufacturing practices.
SAP and AutoCAD
PDMS and GPS
Microsoft Excel and PowerPoint
Lean Six Sigma
Leadership and teamwork
Operations management
Customer orientation
Workflow planning
Inventory control
• Achieved successful manufacturing, testing, and customer-approved dispatch of motors for Nuclear Power Corporation of India Limited (NPCIL)(04/2025 – 03/2026)
• Increase productivity by 20 % with KAIZEN yokasen Japan workshop
• SIX- Sigma green belt project :- To reduce the FTR ( first time rejection) of material by 50 % on the shop floor. (07/2020 - 02/2021)
It is lean six-sigma project, project charter of this project is to reduce first time rejection by 50
%. as the result of the project FTR reduced by 39%.
• Erection & Commissioning of Semi-Automated Coil insulating Robotic machine. (12/2018 - 02/2019)
• Implementation of CGPS (CG Productivity system - MOST STUDY OF TIME AND MOTION. (10/2017 - 11/2018)