Summary
Overview
Work History
Education
Skills
Accomplishments
Additional Information
Roles And Responsibilities
Bloodgroup
Job Profile
Maritalstatus
Thanksandregards
Personal Information
Disclaimer
Timeline
Generic

Dharamraj Harijan

Cpvc Pvc And HDPE Pipe Production
Siddharth Nagar Uttar Pradesh

Summary

PLASTICTECHNOLOGYFROMCIPETFORPOSTOFPRODUCTION MANAGER AND 14 YEAR'S EXPERIENCE IN PVC EXTRUSION.

Overview

14
14
years of professional experience

Work History

Shift Engineer

Ajay industries Pvt ltd.
Dehradun
08.2009 - 09.2011
  • Managed shift schedules, coordinating employee leaves and overtime to maintain optimal staffing levels at all times.
  • Enhanced system reliability through thorough monitoring of operational parameters and making timely adjustments as needed.
  • Improved plant efficiency by conducting regular equipment inspections and implementing preventive maintenance strategies.
  • Ensured safety compliance by conducting regular training sessions and maintaining up-to-date knowledge of industry regulations.

Shift Engineer

Mangalam Industries
Nepal
10.2011 - 05.2013
  • Collaborated with cross-functional teams to identify areas for improvement and implement strategic solutions that boosted overall performance.
  • Streamlined workflow processes, optimizing staff allocation during peak production hours for increased productivity.
  • Reduced waste generation through continuous process improvement initiatives and diligent monitoring of resource consumption.
  • Optimized inventory management practices by tracking usage patterns and adjusting reordering protocols accordingly to minimize stockouts or excess supply.
  • Maintained detailed records of plant operations, identifying trends and potential bottlenecks to address before they impacted production goals.
  • Participated in root-cause analysis investigations following incidents or near misses, contributing valuable insights towards developing corrective action plans that mitigated future risks.
  • Mentored junior engineers, providing guidance on technical issues and career development opportunities to foster a collaborative learning environment.
  • Increased equipment lifespan with proactive maintenance planning, reducing the need for costly replacements or repairs.

Production Engineer

Ajay industries Pvt ltd.
Satara
07.2013 - 10.2014
  • Managed production schedules, ensuring timely delivery of products while maintaining high quality standards.
  • Performed root cause analysis and implemented corrective actions.
  • Provided technical support to troubleshoot equipment issues, minimizing downtime and maintaining production targets.
  • Communicated with other team members to enhance process and performance.
  • Created engineering documentation for manufacturing processes, equipment specifications and change notices.
  • Improved production efficiency by developing and implementing new manufacturing processes.
  • Supervised entire production process and prepared proper documentation for dispatch.
  • Trained team on best practices to optimize production and improve quality.
  • Conducted root cause analyses to identify areas for improvement and implemented corrective actions accordingly.
  • Investigated and proposed corrective actions for quality issues.
  • Participated in safety audits, ensuring a secure working environment for all employees.

Assistant Manager

R.C. Plasto tanks and pipes Pvt. Ltd.
Nagpur
11.2014 - 11.2023
  • Supervised day-to-day operations to meet performance, quality and service expectations.
  • Improved customer satisfaction by addressing and resolving complaints promptly.
  • Developed strong working relationships with staff, fostering a positive work environment.
  • Promoted teamwork within the workplace by encouraging collaboration among staff members on various projectstasks.
  • Completed regular inventory counts to verify stock levels, address discrepancies, and forecast future needs.
  • Coordinated with vendors to ensure timely delivery of products and resolve any supply chain issues.
  • Facilitated clear communication between employees and upper management through regular meetings and updates.
  • Generated repeat business through exceptional customer service and responded to customer concerns with friendly and knowledgeable service.
  • Conducted employee performance evaluations, providing constructive feedback for growth and development.
  • Implemented staff training programs, enhancing product knowledge and improving customer service skills.
  • Created employee schedules to align coverage with forecasted demands.
  • Oversaw daily cash reconciliations, ensuring accurate financial reporting and minimizing discrepancies.
  • Managed inventory levels to minimize stockouts while reducing overhead costs.
  • Ensured compliance with all safety regulations by conducting regular inspections of equipment/operations within the store.
  • Increased employee performance and job satisfaction to strengthen retention and engagement.
  • Developed loyal and highly satisfied customer base through proactive management of team customer service strategies.
  • Boosted employee morale by recognizing outstanding performance and celebrating team accomplishments.
  • Reviewed sales and gross profit report to assess company efficiency.
  • Scheduled staff shifts to ensure proper coverage during peak shopping hours without exceeding labor budgets.
  • Maintained positive customer relations by addressing problems head-on and implementing successful corrective actions.
  • Successfully managed budgets and allocated resources to maximize productivity and profitability.
  • Established performance goals for employees and provided feedback on methods for reaching those milestones.

Production Manager

Prayag Polymers Pvt. Ltd.
Bhiwadi
Current
  • Handling daily scheduled Production and troubleshooting of process
  • Monitoring shift wise production to improve production efficiency
  • Implementing new technical method to improve the work in system
  • Analyzing and provide in feedback on new product after installation
  • Working a Production Specialist in Technical Team
  • Total involvement in erection & commissioning of plant & successful stabilization for continuous production, cost control & analysis including all production activities and positive involvement in higher management decision & strategic planning
  • Production planning ,Control &setting production targets
  • Production-rejectiondowntimeanalysis&makingpreventiveactionplanforrejection
  • Maximization of production, machine utilization while maintaining the quality & achieved the production targets
  • Using strong commando plastics processing, controls the rejection & fast troubleshooting
  • Participating in preventing& breakdown maintenance to reduce the machine breakdown sand increasing the productivity
  • 5S, Fire Training to people involved in quality circle
  • Making man & machine performance & efficiency reports
  • Teambuilding, Manpower planning, handling &controlling overall Production/mixing Department.

Education

B.Sc. - undefined

Faiza bad University

PGD-PPT - undefined

CIPET (Panipat-Haryana)

12th(SCIENCE) - undefined

Allahabad Board

10th(SCIENCE) - undefined

Allahabad Board

Skills

    Pipe production Expert

    Planning & Scheduling

    Project

    Pipe Extrusion

    Cost effective production

    Zero waste Focused

    Interpersonal skills

    Training & Skill development

    5S Approach

    Result oriented

    Task delegation

    Team management

    Safety focused

    Preventive and reparative maintenance

    Employee performance assessment

    Preventive maintenance

    Just In Time stock control

    Materials requisition

    High-value project management

    Deadline management

    Facilities maintenance

    Employee management

    Inventory replenishment

    Strengths: Strong, creative thinking and and minimise production cost without hamper the production quality

    MSOffice (Word , Excel, and PowerPoint)Keynote

    Working with basic SAP (Business one) system, Epic or, Achieves software, in QA applications

Accomplishments

  • Work On Reversion test in Cpvc Pipe and reduce it 10% to 5 %.
  • Installed 2 socketing Machine.
  • Installed New They son (TTS-88) Machine.
  • Install New Kabra Machine.

Additional Information

EXPERIENCE IN PVC EXTRUSION To be associated with a progressive organization that gives scope to apply my knowledge and skill sandstones a part of a team that dynamically works towards growth and achieving the goals of the organization. Impressive, demonstrable track record and skills/experience gained. within a similar position (s), at a similar level. Strong leadership/team management skills and experience. Credible and confident communicator (written and verbal) at all levels. Expertise in managing maintenance operation for reducing breakdown& Downtime & enhancing operational effectiveness of equipment.

Roles And Responsibilities

  • Responsible for inspect raw material supplier and their quality, customer quality satisfaction & in process quality audit.
  • Material inspection–incoming in-house.
  • To conduct daily internal rejection.
  • Responsible for good quality of the pratfall production process, and overall quality from inward out ward in the plant
  • Successfully handle of manpower and their related problem. Knowledge of Plastics compounding using high speed mixer standard processing

Bloodgroup

O

Job Profile

Assistant Manager, R.C. Plasto tanks and pipes Pvt. Ltd., Nov.2014-Nov2023, SupervisingErection&CommissioningOf20mmto315mmupvcpipewell knowledge of self it ,,non-pressure, swr, duct with vacuum sizing pipe in extrusion all capacity was installed ( total 22 extruders) covering product range ASTM,SWR, CPVC, HDPE& AGRI PVC pipes.

Maritalstatus

MARRIED

Thanksandregards

DharamRaj Harijan (bharti)

Personal Information

  • Date of Birth: 04/20/84
  • Nationality: Indian

Disclaimer

I declare that the above-mentioned in for motions true to the best of my knowledge. If given a chance, I assure you that I shall prove myself diligent and honest in the execution of duties that will be entrusted to me.

Timeline

Production Manager

Prayag Polymers Pvt. Ltd.
Current

Assistant Manager

R.C. Plasto tanks and pipes Pvt. Ltd.
11.2014 - 11.2023

Production Engineer

Ajay industries Pvt ltd.
07.2013 - 10.2014

Shift Engineer

Mangalam Industries
10.2011 - 05.2013

Shift Engineer

Ajay industries Pvt ltd.
08.2009 - 09.2011

B.Sc. - undefined

Faiza bad University

PGD-PPT - undefined

CIPET (Panipat-Haryana)

12th(SCIENCE) - undefined

Allahabad Board

10th(SCIENCE) - undefined

Allahabad Board
Dharamraj HarijanCpvc Pvc And HDPE Pipe Production