

Proactive and goal-oriented professional with excellent time management and problem-solving skills. Known for reliability and adaptability, with swift capacity to learn and apply new skills. Committed to leveraging these qualities to drive team success and contribute to organizational growth.
Completed two Projects during my training period
1. Cycle time study with shovel and dumper combination CAT 440G(40 T) dumper & L&T 300 and 300I HD Front end Shovel.
2. Blasting cost reduction by using AN-FO explosive.
As an in-charge of shift coordination in excavation, transportation crushing operation by optimum deployment of heavy earth moving machines ensure optimum feeding to crusher to make the desired blend of limestone available to cement plant.
Computer literacy SAP-PP Module, PESO, Autocad basics, MS Office etc.
Managing all the phases of mining operations such as Mine Design, Development, Production and Operation to Mine Closure, Reclaiming Minedout pits by coordinating with Land, Logistic, Mechanical , Crusher staff Maintaining Quality.Experience of Handling,Manpower in shifts production of limestone using Shovel & Dumper combination,Drilling& Blasting.Ensure the all safety norms to achieve the production target.To Plan and coordinate with the superior to implement day by day site related mining work.Haul road level at proper gradient for safe drive, berm and fencing of mined out pits.Planing the bench parameter,placement & utilize of excavation equipment as well as reclaiming & rehabilitation the mining site to its natural state after exhausting the deposit.Supervision,safety and grievance Handling of 25-30 workers and coordinating with entire Mines team& plant members during shift hours.Production planning& monitoring comprehensive short,medium&long term planning &schedule.
Sports like badminton, cricket, volleyball,
I do hereby declare that the above mentioned information is correct to the best of my knowledge and belief and I bear the responsibility for the correctness of these particulars.