Summary
Overview
Work History
Education
Skills
Past Experience
Personal Information
Additional Information
Timeline
Generic
Dharmikumar Patel

Dharmikumar Patel

Project Execution - Mechanical
Vadodara

Summary

Technically competent Mechanical Engineer, with an experience of over in managing responsibility from initiation of the Project, Capex Preparation, Budgeting, Basic Engineering, Detail Engineering, Procurement, Project Execution & Commissioning Activities.

Exposure of working with multiple DEC like EIL, thyssenkrupp – Uhde, LTTS, Shroff India, KBR, Cushman & Wakefield, IPS – Mehtalia Pvt Ltd.

Being a part of over 1500 Cr. Projects for different Green Field and Brown Field Projects.

Worked with Product Licencers like Uhde – India, Plinke-Germany, BCT-Germany.

Preparation, Submission of Investment proposals and Approval from Management. Basic and Detailed Engineering, Procurement & Expediting, Installation, commissioning, Documentation and Hand over of projects.

Co-ordination between internal department, supplier, contractors for achievement of common goals. Delivery of project with Safety, Quality, Time, and Cost.

Preparation of project schedule and tracking with the bottlenecking of critical path tasks.

Having an experience of handling heavy equipment like Turbo Compressor, Turbine Generator Set, Waste Heat Recovery Boiler, Flare Package.

Having through knowledge of IBR Liasioning.

Face regulatory audits such as USFDA, EDQM (EU-GMP), COFEPRIS, ANVISA, RUSSIAN FDA, Korean FDA.


Successfully Completed Projects:

1) Hydrogenation Project; Budget – 200 Cr. (Total High Pressure Autoclave – 07 No.)

2) Specialty chemical manufacturing plant (Green Field); Budget – 85 Cr.; Total no. of Equipment – 185 No.; Total Structural Material – 439 MT.

3) Manufacturing Plants with Powder Processing Area (Brown Field); Budget – 65 Cr.

4) Solvent Recovery Plant (Green Field). Budget – 20 Cr.

5) Multi Product Production plant (Green Field). Budget – 38 Cr.

6) Installation, Design and up gradation of HVAC System in Pharma Plants.

7) Installation of Cooling towers, N2 plant, scrubber system, RO water system, Brine Plant, Chiller Plant etc.

8) Brownflield Projects for Capacity Enhancement of Process Plant and Utility Plant

9) Development of R&D Building and Analytical Development Lab Facility.

10) Admin Building, Quality Control Lab.

Overview

11
11
years of professional experience
3
3
Languages

Work History

Deputy Manager (Projects Execution)

Deepak PMC Limited
12.2022 - Current
  • Company Overview: A Deepak Group Co.
  • Handling Team Members – 03 Nos.
  • Successfully completed Project Engineering, Procurement, Construction and Closure of 250 TPM Weak and Concentrated Nitric Acid manufacturing plant.
  • Budget – 650 Cr.
  • Major Equipment: Turbo Compressor (Cap: 53800 kg/hr, ~3400 kW), 2.5 MW TG Set, 13.1 TPH Waste Heat Recovery Boiler, Absorption Column (Ht – 70m), 28 TPH @ 70 Bar AFBC Boiler, RO & DM Plant, Glass and MSGL Columns, etc.
  • Currently involve in Project Engineering and Procurement of 2-Ethyl-6-Methyl Aniline (MEA) Project.
  • Budget – 220 Cr.
  • Major Equipment: Ethylene Compressor, Alcl3 – AL Powder Handling System, 35 m Flare, Distillation Columns, Thermic Fluid Heater (TFH), High Pressure Reactors and Heat Exchangers, Cross Country Piping, Pig Receiver etc.
  • A Deepak Group Co.

Sr. Executive (Projects)

Oriental Aromatics Ltd
01.2021 - 12.2022

Executive (Projects)

IPCA Laboratories Ltd
11.2019 - 01.2021

Asst. Manager (Engg. & Project)

Amoli Organics (P) Ltd
02.2018 - 10.2019

Executive (Project)

Lupin LTD
09.2017 - 02.2018

Officer, (Engg. & Project)

Amoli Organics (P) Ltd
11.2014 - 09.2017

Education

Bachelor of Engineering - Mechanical

Dr. Jivraj Mehta Institute of Tech. (GTU)
Anand, Gujarat
01.2014

Skills

  • Project Costing
  • Basic Engineering
  • Detail Engineering
  • Procurement
  • Project Planning
  • Construction
  • IBR & Statutory Liasioning
  • Process support engineering
  • Utility
  • Stake Holder & Team Management
  • Expediting

Past Experience

  • Oriental Aromatics Ltd, Nandesari, Gujarat, 2021-01-01, 2022-12-31, Sr. Executive (Projects), 2 years
  • IPCA Laboratories Ltd, Ranu, Gujarat, 2019-11-01, 2021-01-31, Executive (Projects), 1 year 3 months
  • Amoli Organics (P) Ltd, Vadodara, Gujarat, 2018-02-01, 2019-10-31, Asst. Manager (Engg. & Project), 1 year 8 months
  • Lupin LTD, Dabhasa, Gujarat, 2017-09-01, 2018-02-28, Executive (Project), 0.5 year
  • Amoli Organics (P) Ltd, Vadodara, Gujarat, 2014-11-01, 2017-09-30, Officer, (Engg. & Project), 2 years 9 months

Personal Information

Date of Birth: 1992-05-19

Additional Information

Equipment Knowledge:

Process Equipment:

Turbo Compressor | TG Set | Flare Package | Absorption Columns | Waste Heat Recovery Boiler | Autoclave/Hydrogenator | Process Compressors (Screw, Reciprocating, Centrifugal, Liquid Ring | Reactors (SS, MSGL, Haste alloy) | Compressors (Centrifugal, Screw, Liquid Ring, Reciprocating) | Pumps (API, Non API, Magnetic, Dosing & Metering) | Vacuum System / Pump (Ejectors, Liquid Ring, Oil Ring, Dry Vacuum pump) | Tanks & Vessels | EOT, Hoist | Centrifuges | Filters | Dryers (RCVD/Tray/FBD/VTD) | Blenders | Milling Machines | Shifter|

Utility Equipment:

Chiller (Brine, Water) | Thermic Fluid Heater | Waste Heat Recovery Boiler | Cooling Tower | Hot Water System | Condensate Recovery Units| N2 and Steam PRS | HVAC (AHU, Ventilation Unit, VRF System, AC) | N2 Generation Plant | Air Compressors | Scrubber | RO & DM Plant |

Timeline

Deputy Manager (Projects Execution)

Deepak PMC Limited
12.2022 - Current

Sr. Executive (Projects)

Oriental Aromatics Ltd
01.2021 - 12.2022

Executive (Projects)

IPCA Laboratories Ltd
11.2019 - 01.2021

Asst. Manager (Engg. & Project)

Amoli Organics (P) Ltd
02.2018 - 10.2019

Executive (Project)

Lupin LTD
09.2017 - 02.2018

Officer, (Engg. & Project)

Amoli Organics (P) Ltd
11.2014 - 09.2017

Bachelor of Engineering - Mechanical

Dr. Jivraj Mehta Institute of Tech. (GTU)
Dharmikumar PatelProject Execution - Mechanical