Technically competent Mechanical Engineer, with an experience of over in managing responsibility from initiation of the Project, Capex Preparation, Budgeting, Basic Engineering, Detail Engineering, Procurement, Project Execution & Commissioning Activities.
Exposure of working with multiple DEC like EIL, thyssenkrupp – Uhde, LTTS, Shroff India, KBR, Cushman & Wakefield, IPS – Mehtalia Pvt Ltd.
Being a part of over 1500 Cr. Projects for different Green Field and Brown Field Projects.
Worked with Product Licencers like Uhde – India, Plinke-Germany, BCT-Germany.
Preparation, Submission of Investment proposals and Approval from Management. Basic and Detailed Engineering, Procurement & Expediting, Installation, commissioning, Documentation and Hand over of projects.
Co-ordination between internal department, supplier, contractors for achievement of common goals. Delivery of project with Safety, Quality, Time, and Cost.
Preparation of project schedule and tracking with the bottlenecking of critical path tasks.
Having an experience of handling heavy equipment like Turbo Compressor, Turbine Generator Set, Waste Heat Recovery Boiler, Flare Package.
Having through knowledge of IBR Liasioning.
Face regulatory audits such as USFDA, EDQM (EU-GMP), COFEPRIS, ANVISA, RUSSIAN FDA, Korean FDA.
Successfully Completed Projects:
1) Hydrogenation Project; Budget – 200 Cr. (Total High Pressure Autoclave – 07 No.)
2) Specialty chemical manufacturing plant (Green Field); Budget – 85 Cr.; Total no. of Equipment – 185 No.; Total Structural Material – 439 MT.
3) Manufacturing Plants with Powder Processing Area (Brown Field); Budget – 65 Cr.
4) Solvent Recovery Plant (Green Field). Budget – 20 Cr.
5) Multi Product Production plant (Green Field). Budget – 38 Cr.
6) Installation, Design and up gradation of HVAC System in Pharma Plants.
7) Installation of Cooling towers, N2 plant, scrubber system, RO water system, Brine Plant, Chiller Plant etc.
8) Brownflield Projects for Capacity Enhancement of Process Plant and Utility Plant
9) Development of R&D Building and Analytical Development Lab Facility.
10) Admin Building, Quality Control Lab.
Equipment Knowledge:
Process Equipment:
Turbo Compressor | TG Set | Flare Package | Absorption Columns | Waste Heat Recovery Boiler | Autoclave/Hydrogenator | Process Compressors (Screw, Reciprocating, Centrifugal, Liquid Ring | Reactors (SS, MSGL, Haste alloy) | Compressors (Centrifugal, Screw, Liquid Ring, Reciprocating) | Pumps (API, Non API, Magnetic, Dosing & Metering) | Vacuum System / Pump (Ejectors, Liquid Ring, Oil Ring, Dry Vacuum pump) | Tanks & Vessels | EOT, Hoist | Centrifuges | Filters | Dryers (RCVD/Tray/FBD/VTD) | Blenders | Milling Machines | Shifter|
Utility Equipment:
Chiller (Brine, Water) | Thermic Fluid Heater | Waste Heat Recovery Boiler | Cooling Tower | Hot Water System | Condensate Recovery Units| N2 and Steam PRS | HVAC (AHU, Ventilation Unit, VRF System, AC) | N2 Generation Plant | Air Compressors | Scrubber | RO & DM Plant |