Experienced design engineer in transmission research and development, contributing to OEM automotive industry by managing product design from initial concept to prototyping, validation, and production implementation.
Overview
11
11
years of professional experience
Work History
Deputy Manager
International Tractors Ltd. – Sonalika – Hoshiarpur
06.2022 - Current
3D CAD modeling of transmission parts gears, shafts, forging &casting type.
2d detailed design of parts, sub assy & Main assy.
Create 3d sub assy & main transmission assy.
Transmission Installation drg prepared.
Drawing release through Engineering Change Management process.
Exiting part modify as per requirement with minimum changes.
Modifying product as per the inputs from management which involves designing, prototyping & main assy line.
ORC capture & resolve during proto assembly of transmission in proto & assy line.
RTS discussion for part development with vendor, buyer, quality & costing team.
Coordinate with proto, testing & Production team during project development from proto level to final stage.
Project deliverable as per project timeline.
M/s International Tractors Ltd. (Sonalika) Incorporated in 1969 to accomplish newer heights of success, Sonalika Group has come a long way. Today the group is among the top three tractor manufacturers of India and provides a complete product line including tractors, multi-utility vehicles, engines, farm machinery attachments, diesel gen-sets, auto components and pick & carry cranes.
Present Organization
Assistant Manager
Volvo Eicher Commercial Vehicle Ltd – Indore
03.2015 - 06.2022
Lay-outing and packaging of transmission in vehicle.
Responsible for transmission parts design -3d part Modeling, 2d drafting, assy & Installation drg.
RTS discuss during parts development with CFT Like – Supplier Buyer & Quality team.
Responsible for proto part and tooled parts from project Initial to final SOP.
Analysis of piloting issue & line issue during assy.
Release of individual component drawings and assembly drawings using Teamcentre
Basic Knowledge of Design failure mode & effect analysis.
Coordinate to all related department for ECA feedback purpose – DFM, DFA, DFAM & V.I.
Create ECN, EDN for design release. Bom prepared, ADD/DEL list prepared.
Create new Bom thru 3d assy, Create Bom change request.
Resolve BOM error in assy line. Add/Del List preparation for BOM.
Matrix manages for all TM variant.
VE Commercial Vehicles Limited (VECV) is a joint venture between the Volvo Group and Eicher Motors Limited. In operation since July 2008, VECV is multi-brand, multi-division company comprising of a complete range of Eicher Trucks and Buses, Volvo Buses, exclusive distribution of Volvo Trucks in India, engine manufacturing and export hub for Volvo Group, non-automotive engines and Eicher component business.
Previous Organization
Education
B. Tech - Mechanical Engg
Darsh Institute Of Engineering And Technology
Sonipat, India
01.2014
Diploma - Mechanical Engg
Chhotu Ram Polytechnic
Rohtak, India
01.2010
I.T.I. - Draughtsman Mechanical
Govt. ITI
Rohtak, India
01.2007
Matric - undefined
S.D High School
Rohtak, India
01.2005
Skills
Benchmarking project & Value engineering project
3d part modeling, 2d drawing, 3d TM sub assy & main assy prepared
Design release as per company process
Proto Piloting assy & final Assy on line
Vehicle Integration Variant matrix management
Project Management
Communication skills across all levels of the company and customer communities
UG-NX 10, Auto-Cad, & Creo 30
Wind-chill PDM / PLM & Team Center 90
MS-Excel MS-Word MS-PowerPoint
Time Management skills
Team player, Process oriented
Languages
Hindi
Bilingual or Proficient (C2)
English
Intermediate (B1)
Timeline
Deputy Manager
International Tractors Ltd. – Sonalika – Hoshiarpur
06.2022 - Current
Assistant Manager
Volvo Eicher Commercial Vehicle Ltd – Indore
03.2015 - 06.2022
Diploma - Mechanical Engg
Chhotu Ram Polytechnic
I.T.I. - Draughtsman Mechanical
Govt. ITI
Matric - undefined
S.D High School
B. Tech - Mechanical Engg
Darsh Institute Of Engineering And Technology
Bom & Matrix Management
Create new Bom thru 3d assy, Create Bom change request.
Resolve BOM error in assy line. Add/Del List preparation for BOM.
Matrix manages for all TM variant.
PROJECTS ACTIVITY
Transmission (12+12) for 105 HP Tractors., 3D-2D part updating and drg. release against proto & Testing ORC., Transmissions build in proto level after design release., Discussion with CFT (Line ME, production team & Quality team) for proto assy in Line., S.O.P release for assy purpose., Benchmarking – 23 HP Front Axle, Transmission disassembly all benchmarking vehicles., Part list prepared for BOM Purpose., Weight measurement every part wise and sub assy wise for analysis purpose, Photo capturing for assy sequence purpose., Prepare benchmarking sheet with comparison., Final Benchmarking report release. New Ideas implements parallel in Transmission variant., Pro 5016 & Pro 5019 Vehicles Series – (Tipper, Haulage & Tractor Trailer application) Transmission:- ET7056 (6F + 1 REV)., Pro 6019, 6025 & 6035 Vehicles series – (Tipper, Haulage & Tractor Trailer application). Transmission:- ET8056 (6F + 1 REV)., Transmission:- ET9056 (6F + 1 REV). Over drive & direct drive application.
Bom & Matrix Management
Create new Bom thru 3d assy, Create Bom change request.
Resolve BOM error in assy line. Add/Del List preparation for BOM.