Highly productive professional in the electrical field for more than 14 years of experience known for completing tasks efficiently and effectively. Possess specialized skills in wiring installation, electrical troubleshooting, and safety compliance. Excel at problem-solving, teamwork, and adaptability, ensuring smooth project execution and workplace safety.
Overview
14
14
years of professional experience
Work History
ELECTRICAL SITE INCHARGE
ELINA ENERGY SOLUTIONS PVT. LTD.
HAZARIBAG
07.2023 - Current
Installation, commissioning, and operation & maintenance of 2 Nos. 1200 TPH Coal Handling Plant with 2000A 415v & 1600A 415v LT MCC panel.
Installation, commissioning, and operation & maintenance of 33 kV/415 V 2000 kVA DST transformer and 33 kV/415 V 1600 kVA DST transformer.
Installation, commissioning, and operation, and maintenance of 2 nos. 1250A HT ICOG breaker panel.
Installation, commissioning, operation, and maintenance of 3200A 415V and 2500A 415V LT PCC panels.
Installation, commissioning, operation, and maintenance of 750 kVar, 1600 A, and 1000 kVar LT capacitor bank.
Installation, commissioning, operation, and maintenance of the DFDS system with 2 units. 37 kW air compressor and 2 nos. 5.5 kW DSS system.
Junior Engineer
BIHAR RENEWABLE ENERGY DEVELOPMENT AGENCY(RODIC CONSULTANT PVT. LTD.)
AURANGABAD BIHAR
12.2016 - 06.2023
Company Overview: Renewable energy
Implementing and monitoring renewable energy related government scheme in district and report to concerned District Magistrate and Deputy District Commissioner
Such as jal jeeven haryali mission in which all govt
Building connected with grid connected solar power plant
Solar water pump distribution for agriculture purpose in rural areas
Solar street light installation in different govt
Scheme
Renewable energy
Created detailed reports on project progress, timelines and outcomes.
Advised customers on use of products or services.
Surveyed sites, collected measurements, and assessed project conditions.
Assisted in developing engineering plans for projects.
Coordinated with vendors to obtain necessary parts or supplies.
Control Room Asst.
INDIA POWER CORPORATION (BODHGAYA) LTD.
Gaya
02.2014 - 06.2016
Company Overview: POWER DISTRIBUTION
Making daily interruption report on power availability & monitor power transformer load
POWER DISTRIBUTION
Conducted comprehensive research and data analysis to support strategic planning and informed decision-making.
Completed day-to-day duties accurately and efficiently.
Completed routine maintenance and repair.
Diploma Engineer
EMJAY STEEL UDYOG PVT. LTD.
01.2011 - 12.2013
Company Overview: Induction furnace and Iron Billet Make
Operation and Maintenance of such Electrical works:
A) 30T,10000 kw Inductotherm medium frequency Induction Furnace
B) 132/33kv, with 16mva power transformer sub-station
C) 42.5kv,2400 kvar HT harmonic filter Capacitors reactor
D) Electrical Overhead Crane upto 70/20T capacity
E) A.C
Motors upto 240 H.P.
F) 750kva, 600 KW Generator
Induction furnace and Iron Billet Make
Education
Diploma - Electrical Engineering
Al-Kabir Polytechnic
Jamshedpur, Jharkhand, India
01-2010
Skills
Programmable Logic Controller (PLC)
Technical Exhibition Participation
Documentation control
Value engineering
Testing and commissioning
Equipment installation
Installation scheduling
Commercial project expertise
Work site safety
Disclaimer
I hereby declare that the above information is correct to the best of my knowledge.
Languages
English
Hindi
Personal Information
Father's Name: Mahanand Singh
Date of Birth: 06/21/91
Gender: Male
Nationality: Indian
Religion: Hinduism
Languages
Hindi
First Language
English
Advanced (C1)
C1
Timeline
ELECTRICAL SITE INCHARGE
ELINA ENERGY SOLUTIONS PVT. LTD.
07.2023 - Current
Junior Engineer
BIHAR RENEWABLE ENERGY DEVELOPMENT AGENCY(RODIC CONSULTANT PVT. LTD.)
Manager MTB at MAN Energy Solutions Pakistan Pvt Ltd (Formerly Known As MAN Diesel & Turbo Pakistan Pvt Ltd)Manager MTB at MAN Energy Solutions Pakistan Pvt Ltd (Formerly Known As MAN Diesel & Turbo Pakistan Pvt Ltd)