Dynamic Advanced Manufacturing Engineer with hands-on experience in leading projects to achieve significant reductions in customer claims and enhancing component traceability. Skilled in deploying innovative technologies such as vision system models and automated systems to optimize manufacturing processes. Proficient in implementing lean methodologies like Kaizen events and 5S techniques to drive continuous improvement. Proven track record of enhancing operational efficiency, reducing defects, and optimizing inventory management. Committed to delivering high-quality results and contributing to the success of manufacturing operations.
Kaizen Event Winner- Acuity Brands Lighting
Increased UPOH by 56% through process optimization.
Reduced cycle time at all stations to boost efficiency.
Enhanced operator safety and comfort with ergonomic jigs.
Built a validation station to ensure correct swivel ball inclusion.
Trained models for accurate swivel ball classification.
Improved the vision system by adding new family models for defect detection.