Company Overview: Owner- LODHA GRUP. Project- THE PARK(88th Floor Building).
Layout Building co-ordinates, Excavation scheme making, Core wall marking with Design co-ordinates, Raft monitoring, Traversing. Coordination with client.
Owner- LODHA GRUP. Project- THE PARK(88th Floor Building).
Senior Special Surveyor
Simplex Infrastructures Ltd.
04.2014 - 06.2015
Company Overview: Owner- PWD Government of Assam. Architect- Dulal Mukherjee & Associates. Project- Proposed Construction of New Assam Legislative Assembly Building at Dispur, Guwahati.
Surveying pile layout, Fixing the column layout, Assembly building finishing and masonry work. Coordination with client.
Owner- PWD Government of Assam. Architect- Dulal Mukherjee & Associates. Project- Proposed Construction of New Assam Legislative Assembly Building at Dispur, Guwahati.
Special Surveyor
Simplex Infrastructures Ltd.
11.2010 - 03.2014
Company Overview: Owner- M/s Korba West Power Company Limited. Client- M/s WPIL. Project- 1X600 MW KWPCL Power Plant (Unit-1), Raigarh, Chattishgarh.
Project Mobilization, CW Pump House and 12mtr. Inlet Channel Layout, Excavation Scheme, Crane Girder Bolt fixing, Execution civil and finishing work. Preparation Handover Protocols. Supervision Civil work, Contractor Billing Coordination with client.
Owner- M/s Korba West Power Company Limited. Client- M/s WPIL. Project- 1X600 MW KWPCL Power Plant (Unit-1), Raigarh, Chattishgarh.
Senior Surveyor
Simplex Infrastructures Ltd.
03.2005 - 10.2010
Company Overview: Owner- M/s W.Bengal Power Development Corporation Ltd. Consultant- M/s DCPL & NTPC. Client- M/s Dongfang Electric Corporation, China. Consultant- M/s NWEPDI, China. Project- 2X300 MW Sagardighi Thermal Power Project (Phase-1), Murshidabad, West Bengal.
Surveying and fixing of main axes at T.G, Power House, Boiler, Chimney, Mill Bunker, ESP, Switchyard, ID Fan and FD Fan area. Layout of 4441 no Precast Piles, Fixing the Foundations Bolts, Preparation of excavation Scheme, Preparation of Handover protocols. Supervision Civil work, Contractor Billing. Coordination with client.
Owner- M/s W.Bengal Power Development Corporation Ltd. Consultant- M/s DCPL & NTPC. Client- M/s Dongfang Electric Corporation, China. Consultant- M/s NWEPDI, China. Project- 2X300 MW Sagardighi Thermal Power Project (Phase-1), Murshidabad, West Bengal.
Surveyor
Simplex Infrastructures Ltd.
01.2005 - 02.2005
Company Overview: Owner BELAGHATA ID HOSPITAL. Client- M/s SUMITO MITUSHI CORPORATION, JAPAN. Project- Diareya Rech Institute.
Layout of 560 Cast in situ Piles, Execution pile work. no Precast Piles.
Owner BELAGHATA ID HOSPITAL. Client- M/s SUMITO MITUSHI CORPORATION, JAPAN. Project- Diareya Rech Institute.
Surveyor
M/S NICCO CORPORATION LTD.
08.2002 - 12.2005
Company Overview: Project Division. Client- Kolkata Municipal Corporation, Kolkata. Project- 4.00 MGD Semi-underground Water Reservoir with Booster Pumping Stn, Kalighat Kolkata.
Layout and Supervision of 750mm dia 676 nos cast in situ piles, Supervision of Civil work for sub structures, Layout pump house and Crane grader, Preparation of handing over protocols.
Project Division. Client- Kolkata Municipal Corporation, Kolkata. Project- 4.00 MGD Semi-underground Water Reservoir with Booster Pumping Stn, Kalighat Kolkata.
Surveyor
M/S Centex India Eng.(India) Pvt Limited.
11.2001 - 07.2002
Company Overview: Client- Metro Rail Kolkata. Project- Metro Rail Extension Project.
Layout and Supervision of 1000mm dia cast in situ piles, Supervision of Civil work for sub structures, Preparation of handing over protocols.
Client- Metro Rail Kolkata. Project- Metro Rail Extension Project.
Surveyor
M/s KEC International Limited
06.2000 - 10.2001
Company Overview: Project- West Bengal Transmission Line Project.
Surveying a Route alignment of 132KV Barasat -Basirhat Transmission Line. Detail survey, Check survey, Tower Spotting, Supervision of Civil work.
Project- West Bengal Transmission Line Project.
Jr. Surveyor
M/s RPG Transmission Limited
04.1999 - 05.2000
Company Overview: Project- West Bengal Transmission Line Project.
Surveying a Route alignment of 132KV Kolaghat - Uleberia Transmission Line. Detail survey, Check survey, Tower Spotting, Supervision of Civil work.
Project- West Bengal Transmission Line Project.
Jr. Surveyor
State Water Investigation Directorate.(SWID)
07.1998 - 03.1999
250 KM RL Connection of Tube well at Midnapore District.
Education
SURVEYING - undefined
NVTC
B.COM - undefined
Burdwan University
Skills
Windows & DOS
undefined
Salary
6 Lac PA
Disclaimer
I hereby state that the above information is true to the best of my knowledge.