Resourceful Mechanical Engineering known for high productivity and efficient task completion. Skilled in project management, safety compliance, and workflow optimization. leadership, and problem-solving to deliver projects on time and within budget. Committed to maintaining high quality standards and continuous improvement strategies in all operations.
· Develops discipline construction schedules and monitors progress.
· Responsible for Piping erection operations and pipe support installation in accordance with schedule, Procedures, and Availability of Construction Drawings.
· Monitoring the daily work activities and updating Progress Reports.
· Responsible for counter checking by Isometric/Piping plan for the spools erected in the correct location,
· Orientation, alignment.Preparation of field piping system test packages, including system limit on P&ID and piping Isometrics.
· Responsible for carrying out Mechanical Clearance, Conducting Hydro and fulfilling commissioning and Pre-Commissioning requirements for the project.
· Responsible for line checking after hydro test to complete the post punch list prior to sign-off the test packages before signing the completion of piping / mechanical.
· Ensure that hydro test reinstatement is to be done as per procedure.
· Verification of Gasket, flanges, Plates (Using Positive Material Identification method) etc.
· Apply usability procedures and principles at project.
· Provides schedule and progress appraisal report to the Construction Manager.
· To do the inspection of incoming raw materials such as material.
· Read and interpret blueprints, technical drawings, schematics, and computer-generated reports.
· Confer with engineers and other personnel to implement operating procedures, resolve system malfunctions, and provide technical information.
· Preparing an Inspection report for Existing Pipeline & Equipment Shell using UT thickness Survey.
· Conducting a detailed Study of Inspection report & Scope of work of each equipment.
· Responsible in pipeline project planning, screening of pipeline project opportunities, route selection.
· Handling all piping technical queries and investigating all field pipe work related problems, including the drawing of field sketches when necessary.
· Coordinating with Engineering and Construction and liaise with the Client on detail engineering requirements.
· O2 Meter reading
· Pipe laying with pipe book.
· Coating, Holiday test.
· Daily arranging welders for their respecetive work.
· Welding as per procedure,
· Corbon steel pipe line location using line locator.
· Material handling.
· Inpection of incoming material.
HSE & Risk management
I hereby declare that the statements made above are true and correct to the best of my knowledge. If given an opportunity to work, I promise to abide in the rules and regulations of the company.
Date: - Signed
Place:- DILSHAD ALI