Results-Driven Senior Manager with Expertise in MEP and solar electrical works ,project management, project execution, vendor management, construction management.

Overview

19
19
years of professional experience

Work History

Senior Manager

Adani Infra India Limited
Khavda, Gujrat
04.2024 - Current

(Internal Group Transfer to same project).

  • Managing 600 MW ACDC Solar Works

(Part of world’s largest solar park).

  • Successfully commissioned 600MW ACDC works in stipulated time.
  • Handled 625 kms LT cable laying 3c x 300mm2 unarmoured operating voltage 800VAC (used method of cable hanging system),
  • Outdoor IDTs of 12.5MVA, HT Panels of 33KV rating, 5700kms of DC cabling (operating voltage (1300 to 1500V DC), 300kms of grid earthing (25 x 6mm) and piling earthing such as table to table, inverter earthing works,etc.
  • Completed Voc for over 2100 Nos string inverters of 275KW each,
  • Witnessed testing of equipments such as IDTs, HT panels, etc.Approx.
  • DC Stringing done for 53000 Nos.
  • Managed 20+ vendors with peak manpower of 350+
  • Coordination with other departments for smooth operation.
  • Responsible for Quality and safety of works.

Senior Manager

Adani Green Energy Limited
Khavda, Gujrat
12.2022 - 03.2024
  • Managing 600 MW ACDC Solar Works

(Part of world’s largest solar park).

  • Successfully commissioned 600MW ACDC works in stipulated time.
  • Handled 625 kms LT cable laying 3c x 300mm2 unarmoured operating voltage 800VAC (used method of cable hanging system),
  • Outdoor IDTs of 12.5MVA, HT Panels of 33KV rating, 5700kms of DC cabling (operating voltage (1300 to 1500V DC), 300kms of grid earthing (25 x 6mm) and piling earthing such as table to table, inverter earthing works,etc.
  • Completed Voc for over 2100 Nos string inverters of 275KW each,
  • Witnessed testing of equipments such as IDTs, HT panels, etc.Approx.
  • DC Stringing done for 53000 Nos.
  • Managed 20+ vendors with peak manpower of 350+
  • Coordination with other departments for smooth operation.
  • Responsible for Quality and safety of works.

Deputy General Manager

Lodha Group
Palava, Phase 2, Dombivali, Thane, Maharashtra
02.2019 - 02.2022
  • Handled MEP Works for high rise buildings (G+18 storey),
  • Electrical works such as panel rooms, pump powering, electrical final fixes, wiring and cabling works, distribution board installation and testing,etc.
  • Handled CFO visits, UGT pump room fire fighting works, fire fighting shafts works, wet riser system, sprinkler system, hydrant system, underground piping works,etc.
  • Plumbing works for high rise and terrace, double stacking system, Domestic and flushing piping, solar water heaters, piping for shafts, etc.
  • Elevator works coordination,
  • Indoor Split AC installation works.

Manager - Electrical

Larsen & Toubro Limited
India And Gulf
04.2008 - 01.2019

2015-2019

W hotel ,Muscat, Oman

Manager - Electrical

  • Worked as Electrical Incharge.
  • Handled end to end responsibility from preparations of shop drawings, material submittals (MAS), method statements, quantity certification.Also, documentation such as raising technical queries, inspection requests, and material inspectiontion.
  • Substation scheme approval from Authority.
  • Planning and monitoring the site progress, material follow up, vendor, material and manpower management.
  • Testing of equipment such as DB, earthing, etc.
  • Electrification of swimming pool, guest room, corridor ,lobby area , ball room, meeting room, restaurant, etc.
  • Lighting control system, Central battery system, etc.
  • Equipment power for AHUs, fire pumps, plumbing pumps, Fire Alarm system works etc.
  • Close Coordination with finishing team.

2012-2015

Salalah Airport, Salalah, Oman

Assistant Construction Manager- Electrical

  • Bus Duct work for data centre
  • Grid Earthing works for false floor
  • Power supply for Data centre racks.
  • Electrification for back of house area such as service areas, office areas, AHU plant rooms, etc.
  • Electrification for passenger terminal building front of house areas, lighting control system,
  • G.I. conduiting works, ladder and perforated cabling, wiring, etc.

2011-2012 (Deputed to Oman)

Mixed used Development, Muscat, Oman

Assistant Construction Manager- Electrical

  • Electrification for Apartments lighting.
  • Distribution board installation, etc.
  • Planning of electrical activities, etc.

2009-2011

Wankhede Cricket Stadium, Mumbai,India

Senior Engineer -Electrical

  • Electrification of stadium lighting works, Electrical panel room for 3 stands.
  • Electrification of stands and washrooms by providing lighting points.
  • Installation and energization of distribution boards
  • Underground cabling works, etc.

2008-2009

ESE factory, Ahmednagar,Maharashtra,India

Senior Engineer -Electrical

  • Electrification of LV and MV switchgear workshops.
  • Electrification of Food court (canteen building)
  • Electrification of administration building (later awarded green building by IGBC).
  • Indoor substation works for 11KV, dry type transformer, LT panels, bus ducts works.
  • Fire pump room electrification, STP power supply, AHU power supply, VFD panels, etc.
  • Street lighting works,etc.

Project Engineer

Sterling and Wilson Pvt. Ltd.
Goa
11.2006 - 03.2008
  • Electrical Incharge for Calangute mall (shopping mall).
  • Power supply to Individual shops by cabling.
  • Fixing of Isolator for individual shops.
  • Niche lighting works.
  • Installation of lights in niches,etc.

Trainee Engineer

Prabhu Enterprises
Goa
10.2005 - 10.2006

NIO Colony and Institute electrification works

  • Underground cabling works.
  • Street lighting works
  • Wiring replacement works in Institute buildings.
  • Perforated cable tray works.
  • Cabling works,etc.
  • Power supply for AC, Computers, lighting,etc.

Education

Bachelor of Engineering - Electrical & Electronics

Goa Engineering College
Farmagudi, Ponda, Goa
05-2005

Skills

  • Hard working
  • Dedicated to work

Dates - Lastupdated

10/01/23

Skills

MEP works, Solar Works, Coordination, Follow ups,etc.

Languages

Marathi
First Language
Hindi
Proficient (C2)
C2
English
Proficient (C2)
C2

Timeline

Senior Manager

Adani Infra India Limited
04.2024 - Current

Senior Manager

Adani Green Energy Limited
12.2022 - 03.2024

Deputy General Manager

Lodha Group
02.2019 - 02.2022

Manager - Electrical

Larsen & Toubro Limited
04.2008 - 01.2019

Project Engineer

Sterling and Wilson Pvt. Ltd.
11.2006 - 03.2008

Trainee Engineer

Prabhu Enterprises
10.2005 - 10.2006

Bachelor of Engineering - Electrical & Electronics

Goa Engineering College
DINESH KAKATKAR