
Accomplished Material Management & Master Data Management (MDM) Specialist with over 13 years of experience driving supply chain optimization and digital transformation. Expert in SAP MM, Material Requirement Planning (MRP), inventory control strategies, and complex product lifecycles. Proven track record of leveraging data-driven automation to maximize inventory accuracy, prevent stock disruptions, and deliver scalable, cost-effective operations.
The core material master data in SAP is split across several relational database tables, with the primary tables being MARA, MAKT, and MARC.
General and Descriptive Tables
Plant and Storage Tables
Valuation and Sales Tables
I can provide the exact table joins
SAP Bill of Material (BOM) transactions manage the list of component items needed to build a product, using key codes like CS01 for creation, CS02 for changes, and CS03 for display. [1]
Material BOM Transactions
Reporting and Explosion Transactions
MRP types in SAP control how the system plans and replenishes inventory, split primarily into Deterministic Planning, Consumption-Based Planning, and Master Production Scheduling. These codes dictate whether procurement triggers from actual customer demands, past consumption levels, or targeted production schedules.
Deterministic Planning (MRP)
A lot size in SAP is a rule used by Material Requirements Planning (MRP) to calculate exact procurement or production order quantities. Key procedures include lot-for-lot (EX), fixed lot size (FX), and period lot sizing.
Key Types of Lot Sizing Procedures
In SAP, Goods Receipt (GR) processing time is the number of workdays required to inspect, process, and place received goods into inventory after delivery. It ensures accurate material availability dates for Material Requirements Planning (MRP) and production scheduling.
Where to Find and Maintain GR Processing Time
This parameter is configured primarily at the material level in the SAP system: