Summary
Overview
Work History
Education
Skills
Accomplishments
Timeline
Generic

Dipankar Ghosh

Risk-Opportunity & Life Cycle Costing Manager
Saharanpur,UP

Summary

Name of Applicant: Dipankar GHOSH, IPMA Level D -certified project manager with 16+ years of demonstrated success. Expert in analysis, project management, contract & claim management, Life cycle costing, business modelling and strategic planning. Skilled in process improvement, risk assessment, opportunity identification and savings management, cross functional collaboration and project deployment.

Overview

6
6
years of post-secondary education
15
15
years of professional experience

Work History

Risk-Opportunity and Life Cycle Costing Manager

Alstom Transport India Limited
Saharanpur, Uttar Pradesh
04.2020 - Current
  • RESPONSIBLE FOR RISK MITIGATION, OPPORTUNITY IDENTIFICATION AND SAVINGS MANAGEMENT.
  • LIFE CYCLE COSTING MANAGEMENT FOR E-LOCO MAINTENANCE CONTRACT WITH WORK PACKAGE OF 113.5 M EUR, PLAN VS ACTUAL COST MONITORING FOR PREVENTIVE, CORRECTIVE, ACCIDENT & VANDALISM, CR IMPLEMENTATION.
  • MAKE OR BUY BUSINESS SCHEME FINALISATION FOR ALSTOM CAPTIVE PARTS AND MAJOR SUPPLIER SUBSYSTEMS.

Project Planning for Mumbai L3 RS

Alstom Transport India Limited
Bangalore, India
10.2018 - 03.2020
  • HANDLED PROJECT PLANNING OF MUMBAI METRO LINE 3 ROLLING STOCK 248 CARS SCOPE SINCE OCT-2018 LEADING ALL THREE CONTRACTS OF ROLLING STOCK, SIGNALLING & TELECOM AND OVERHEAD CATENARY SYSTEM IN TERMS OF STRATEGY AND CLAIM MANAGEMENT.
  • WORKED AS ROLLING STOCK INTERFACE MANAGER (ACTING) FOR INITIAL 9 MONTHS FROM NTP IN ABSENCE OF APPROVED INTERFACE MANAGER.

Project Configuration & Planning Manager for KOCHI

Alstom Transport India Private Limited
Bangalore, Karnataka
05.2016 - 09.2018
  • EXECUTED SUCCESSFULLY SUPPLY & COMMISSIONING OF TS#01 TO TS#16 FOR KOCHI ROLLING STOCKS 75 CARS CONTRACT IN TERMS OF CONFIGURATION-CHANGE AND PROJECT PLANNING MANAGEMENT.
  • ENSURE REGULAR CCB MEETINGS SCHEDULED WITH EFFECTIVE DATA ANALYSIS & PARTICIPATION, DEFINE COST IMPACT, KEEP TRACK OF ACTUAL AND FORECASTED COST FOR MANAGEMENT MONTHLY REPORTING, SCHEDULE IMPACT AND SAFETY IMPACT OF CHANGES, A BASELINE RELEASE FOR EACH GATE REVIEWS, CR PHYSICAL AUDITS DONE EVERY 3 MONTHS, REDUCE CR IMPLEMENTATION AT DEPOT, KPI PUBLISHED EVERY MONTH, ACTIVE PARTICIPATION TO ALL AUDIT, SOFTWARE AND HARDWARE CONFIGURATION MANAGEMENT, CRS IMPLEMENTATION AT DEPOT WITH EFFECTIVE COMMUNICATION.
  • PLAN AND SCHEDULE PROJECT TIMELINES & MILESTONES USING PMS/ PRIMAVERA/ OTHER APPROPRIATE TOOLS, DEVELOP PROGRESS REPORTS, ANALYSE RESULTS AND PRESENTATION, RESOURCE PLANNING, EARNED VALUE REPORTS, S-CURVES.
  • MANAGEMENT OF RISK AND OPPORTUNITIES IDENTIFIED BY
    DEVELOPMENT AND IMPLEMENTATION OF APPROPRIATE ACTION PLANS WITH THE AIM OF IMPROVING THE PROJECT FLOAT. IDENTIFY AND RESOLVE ISSUES AND CONFLICTS WITHIN PROJECT / OPERATIONS TEAM.

Project Manager

Alstom Power India Limited
Baroda, Gujarat
10.2013 - 04.2016
  • EXECUTED SUCCESSFULLY SUPPLY SCOPE OF DHAULIGANGA PLANT RESTORATION (CLIENT: NHPC) WITHIN THE STRINGENT CONTRACTUAL TIME, BUDGET AND COMPLETED WITH INCREASED GROSS MARGIN (VALUE: 360 MINR) FROM 18.5% TO 25.2%.
  • EXECUTED SUPPLY AND ERECTION COMMISSIONING CONTRACT FOR RESTORATION OF GENERATOR FOR DEHAR HEP, HIMACHAL PRADESH (CLIENT: BHAKRA BEAS MANAGEMENT BOARD: 198 MINR).
  • EXECUTED SUCCESSFULLY SUPPLY SCOPE FOR FOUR UNITS OF FORGED FABRICATED RUNNERS FOR CHHUKHA HEP TO BE SUPPLIED FOR STRATEGIC CLIENT: DRUK GREEN POWER CORPORATION OF BHUTAN. (VALUE: 260 MINR) WITH GREAT LEVEL OF CUSTOMER SATISFACTION AND COMPLETED WITH INCREASE IN GROSS MARGIN OF PROJECT FROM 21% TO 32%.
  • EXECUTED SUCCESSFULLY SUPPLY SCOPE FOR TWO UNITS OF FULLY FORGED RUNNERS FOR DAGACHHU HEP SUPPLIED FOR CLIENT: DRUK GREEN POWER CORPORATION OF BHUTAN. (VALUE: 92 MINR) WITH GREAT LEVEL OF CUSTOMER SATISFACTION.

Project Manager Bhutan JV

Alstom Power India Limited
Baroda, Gujarat
02.2012 - 09.2013
  • WORKED AS A PROJECT MANAGER IN FORMATION AND IMPLEMENTATION OF A JOINT VENTURE COMPANY BETWEEN ALSTOM & DGPC FOR SETUP OF A HYDROPOWER SERVICE CENTER FACTORY IN BHUTAN (PROJECT VALUE: 1075 MINR)
  • PROJECT CONCEPTUALISATION, FINANCIAL MODEL & BUSINESS PLAN PREPARATION ALONG WITH JV CONTRACT/ ANCILLARY AGREEMENT PREPERATION AND FORMATION/ REGISTRATION OF COMPANY WITH REGISTRAR OF COMPANY IN BHUTAN.
  • PLAN AND BUDGET, IN LIASON WITH PROJECT DIRECTOR, TO MONITOR AND CONTROL SITE PROGRESS & BUSINESS PLAN BUDGET, CASH IN, ETC.

Project Planner

Alstom Power India Limited
Baroda, Gujarat
07.2007 - 02.2012
  • PREPARE DETAILED PROJECT PLAN FOR THE ENTIRE ONSHORE AND OFFSHORE SCOPE.
  • PREPARE CRITICAL PATH AND FOLLOWUP TO ACHIEVE SALES AND CASHIN MILESTONES.
  • UPDATING CUSTOMERS AND SENIOR LEADERS ON PROGRESS AND ROADBLOCKS.
  • CLOSELY COLLABORATED WITH PROJECT MEMBERS TO IDENTIFY AND QUICKLY ADDRESS PROBLEMS.

Operations Engineer

Andritz Hydro Private limited
Faridabad, Haryana
06.2005 - 06.2007
  • PREPARE DETAILED MANUFACTURING PLAN AND OPERATION ROUTING FOR EACH COMPONENTS.
  • FOLLOW UP WITH ENGINEERING, SOURCING, SUBCONTRACTING, LOGISTICS AND PRIORITIZING COMPONENTS WITH MANUFACTURING.

Education

B.TECH - MECHANICAL ENGINEERING

NE REGIONAL INSTITUTE oF SCIENCE & TECHNOLOGY
NIRJULI
06.1998 - 06.2004

Skills

    Project lifecycle management

undefined

Accomplishments

  • RISK-OPPORTUNITY & LCC FOR E-LOCO: ROBUST MONTHLY GOVERNANCE DEPLOYED FOR RISK MITIGATION & 3.8 M EUR OF SAVINGS COMMITTED FROM EXPLORATION OF NEW OPPORTUNITIES AND POTENTIAL OPPORTUNITY OF 16.0 M EUR IS UNDER EXPLORATION.
  • MUMBAI METRO L3 RS: PREPARED STRONG STRATEGY/ CASE TO DEFEND LD FOR ALL THREE CONTRACTS ALONG WITH CONTRACT MANAGER.
  • KOCHI METRO RS: PREPARED STRATEGY/ CASE FOR GETTING EXTENSION OF TIME, APPROVED IT FROM ALSTOM CLAIM MANAGEMENT TEAM, EOT RECEIVED FROM DMRC AVOIDING 10% LD. IMPROVED THE COMPLIANCE TO CONFIGURATION MANAGEMENT INSTRUCTIONS AND CLEARED IRIS AUDIT WITH NO OBSERVATIONS.

Timeline

Risk-Opportunity and Life Cycle Costing Manager

Alstom Transport India Limited
04.2020 - Current

Project Planning for Mumbai L3 RS

Alstom Transport India Limited
10.2018 - 03.2020

Project Configuration & Planning Manager for KOCHI

Alstom Transport India Private Limited
05.2016 - 09.2018

Project Manager

Alstom Power India Limited
10.2013 - 04.2016

Project Manager Bhutan JV

Alstom Power India Limited
02.2012 - 09.2013

Project Planner

Alstom Power India Limited
07.2007 - 02.2012

Operations Engineer

Andritz Hydro Private limited
06.2005 - 06.2007

B.TECH - MECHANICAL ENGINEERING

NE REGIONAL INSTITUTE oF SCIENCE & TECHNOLOGY
06.1998 - 06.2004
Dipankar GhoshRisk-Opportunity & Life Cycle Costing Manager