Summary
Work History
Education
Skills
Timeline
Languages
Work Availability
Maintenanceexposure
Work Preference
Personal Information
Utilityexposure
Projects
Training
Disclaimer
Overview
Hi, I’m

Dipsankar Joardar

Electrical Engineer having 10 years above experience at Project, Facility, Operation and Maintenance
Kolkata
Dipsankar Joardar

Summary

Experienced in cost reduction techniques, efficient time scheduling, and error-free compliance inspections. A critical-thinking individual consistently delivering successful results. Expertise in aligning departmental goals and personnel assignments for on-time job completion, supporting company objectives. Extensive experience in project coordination, budget making, compliance, and generating reports for project operations, maintenance, and facility-related works.

Work History

Calcutta Electric Supply

Assistant Officer (Estates)
06.2022 - Current

Job overview

  • Installation and Commissioning of Electrical Equipment like HT Panel, LT panel, Ventilation Fan, HVAC System including Chillers, Pumps, Cooling Towers, Treated Fresh Air System, Reproductive Fresh air system, Fire Fighting System, Fire Detection System, BMS System, Water Treatment System, Pump Automation system, lift for 26 office establishments
  • BOQ preparation, installation and testing of Earthing System for Critical loads as well as lighting loads and lightning protection system for high rise buildings
  • BOQ preparation and completion of office space related electrical renovation work
  • Compliance related to Fire NOC, Lift License
  • Civil Finishing Job including tiles fixing, flooring, cable raceway, false ceiling, Fire and wooden doors, wall painting, water proofing, crack repairing
  • Setup maintenance contract for all M&E system and equipment
  • Certification work and related modification work for Green Building Certification

Infinity Infotech Parks Limited

Assistant Manager (project, Operation & Maintenance)
05.2018 - 06.2022

Job overview

  • Installation and Commissioning of Electrical Equipment like HT Panel, LT panel, Ventilation Fan, HVAC System including Chillers, Pumps, Cooling Towers, Treated Fresh Air System, Reproductive Fresh air system, Fire Fighting System, Fire Detection System, BMS System, Water Treatment System, Pump Automation system, lift
  • To provide comprehensive property
  • ISO documentation for day-to-day check of all critical equipment and utilities
  • Planning and execution of activities for all equipment across facility in building to minimize breakdowns and downtime
  • Monthly energy statement for client billing
  • Energy and water conservation calculation, planning and implementation
  • Planning for procuring materials
  • CAM Calculation, Budget making
  • Verification of BOQ
  • Client Communication
  • Setup maintenance contract for all M&E system and equipment Snag preparation
  • Improved customer satisfaction by addressing and resolving complaints promptly.
  • Supervised day-to-day operations to meet performance, quality and service expectations.
  • Developed strong working relationships with staff, fostering positive work environment.

G.S Staffing Solution

Shift Engineer
10.2014 - 04.2018

Job overview

  • To provide comprehensive property maintenance service
  • ISO documentation for day-to-day check of all critical equipment's and utilities
  • Planning and execution of activities for all equipment's across the facility in building to minimize breakdowns and downtime
  • Monthly energy statement for client billing
  • Energy and water conservation calculation, planning & implementation Snag preparation
  • Client Communication
  • Enhanced system reliability through thorough monitoring of operational parameters and making timely adjustments as needed.
  • Managed approximate 20 plus important office establishment and other sites
  • Managed shift schedules, coordinating employee leaves and overtime to maintain optimal staffing levels at all times.

Education

Ramkrishna Mission Shilpapitha
Kolkata, India

Diploma from Electrical Engineering
06.2011 - 06.2014

University Overview

  • Final Grade: 76.4%

Barrackpore Govt. High School
Kolkata, India

Higher Secondary from Science
04.2009 - 04.2011

University Overview

  • Final Grade: 69.8%

Ramkrishna Vivekananda Mission Vidyabhavan
Kolkata, India

Secondary
04.2007 - 04.2009

University Overview

  • Final Grade: 83.75%

Skills

Vendor Management

Timeline

Assistant Officer (Estates)

Calcutta Electric Supply
06.2022 - Current

Assistant Manager (project, Operation & Maintenance)

Infinity Infotech Parks Limited
05.2018 - 06.2022

Shift Engineer

G.S Staffing Solution
10.2014 - 04.2018

Ramkrishna Mission Shilpapitha

Diploma from Electrical Engineering
06.2011 - 06.2014

Barrackpore Govt. High School

Higher Secondary from Science
04.2009 - 04.2011

Ramkrishna Vivekananda Mission Vidyabhavan

Secondary
04.2007 - 04.2009

Languages

Bengali
Bilingual or Proficient (C2)
English
Bilingual or Proficient (C2)
Hindi
Bilingual or Proficient (C2)
Availability
See my work availability
Not Available
Available
monday
tuesday
wednesday
thursday
friday
saturday
sunday
morning
afternoon
evening
swipe to browse

Maintenanceexposure

  • Maintenance of IT & ITES building
  • Maintenance of Fire Detecting system (FDA panel, Smoke Detector, MCP)
  • Maintenance of Fire system (Pump, Hydrant System, Sprinkler System)
  • Maintenance of Electrical System
  • Shutdown maintenance of Electrical equipment & feeder
  • Operation and Maintenance of HVAC System
  • Operation and Maintenance of BMS System
  • Operation and Maintenance of DG

Work Preference

Work Type

Full Time

Work Location

On-SiteRemoteHybrid

Important To Me

Career advancementCompany CulturePersonal development programsHealthcare benefitsWork-life balance

Personal Information

Date of Birth: 01/05/1992

Utilityexposure

Have basic knowledge of Building facility System (BMS, HVAC System, Electrical System, Fire System, Lift operation)

Projects

Merlin Infinite: Operation and Maintenance of IT & ITES Green Building Adventzinfinity@5: Construction, Operation and Maintenance of IT & ITES Green Building Lord Sinha Road CESC Office: Installation and modification work related to green building Certification South West Regional Office, CESC: Installation and modification work related to green building Certification

Training

W.B.S.E.D.C.L, October 2013 to November 2013, Kalyani 220KV/33 KV/11KV Substation, General maintenance of Electrical Equipment's Operation & Maintenance of Outdoor Transformers Monitoring, Operation and maintenance of control system (Siemens & ABB) Fault & Maintenance of distribution Line Operation & General maintenance Of Switchgears, Reclosers, C.T, P.T, Isolators, Busbars, Wave trap, Capacitor Bank etc.

Disclaimer

I Dipsankar here by confirm that the information furnished above is true to the best of my knowledge

Overview

10
years of professional experience
7
years of post-secondary education
Dipsankar JoardarElectrical Engineer having 10 years above experience at Project, Facility, Operation and Maintenance