Summary
Overview
Work History
Education
Skills
Languages
Accomplishments
Timeline
Generic
DIVYESHKUMAR SHUKLA

DIVYESHKUMAR SHUKLA

Jamnagar,GJ

Summary

16+ yrs. of rich experience in Maintenance, Reliability & planning engineering to optimize plant operational efficiency.

• Proven skills to design effective plans and execute preventive maintenance break down maintenance and shut down maintenance schedule.
• Proficient in Trouble Shooting and sensitizing workforce on need of industrial safety & observing safety standards.
• Excellent man-management, time management, and leadership skills

Overview

16
16
years of professional experience

Work History

Sr Electrical Engineer

Reliance Industries Limited
09.2007 - Current
  • Sr. Maintenance Planner
  • RIL, Reliance Industries Limited
  • 04/2011 - Current
  • Sr. Maintenance planner
  • Central Engineering Services
  • · Key Accountability
  • · KPIs: Defining and tracking Reliability & Maintenance related KPIs like Backlog management, , PM compliance, WO Schedule compliance, Asset Capability, Asset Utilization etc
  • · Work-orders: Record tasks/information within work order and review work-orders for technical completeness
  • · Job Plan: Undertake task activities necessary for job plan considering constructability, maintainability, quality feedback from person doing work, archived plan or template and input from other crafts as well as field checks in order to ensure all aspects are taken into account
  • · Materials Identification / Requisition: Identify materials/tools/equipment required in order to perform tasks effectively
  • · Considering material costs when selecting materials from specifications in order to ensure costs are minimized where-ever possible
  • · Safety: Identify/solicit safety information and requirements necessary to safely perform tasks
  • · Continuous Improvement: Contribute to identification of opportunities for continuous improvement of maintenance planning unit systems, processes and practices taking into account ‘international best practice', improvement of business processes, cost reduction and productivity improvement
  • · EH&S Focus: Comply with all relevant health, safety, security and environmental management policies, procedures and controls to guarantee employee safety, legislative compliance and a responsible environmental attitude
  • · Responsible for KPIs, which includes:
  • · Work-order Backlog KPI
  • · Notification KPI
  • · Schedule compliance KPI
  • · PM compliance KPI
  • · Priority jobs compliance KPI
  • · Planning, scheduling & monitoring of Turn Around of various plants which includes:
  • · Scope finalization & scope challenging
  • · Resource identification (Material, manpower, tools & Equipment)
  • · Material reservation & PR/PO follow up
  • · Schedule preparation & schedule challenging
  • · Resource mobilization plan - preparation & monitoring
  • · Monitoring & reporting pre-shutdown & shutdown progress
  • · Shutdown closeout report & shutdown lessons learnt
  • · Preparing weekly and daily schedules by reviewing backlog and coordinating work requirements to comply with operation rankings
  • · Ensuring availability of all resources required are met and available, prior to scheduling work, and obtaining approval of schedule updates maintenance order statuses & follows up until completion of orders
  • · Monitoring progress of maintenance on daily basis and giving feedback to maintenance supervisor and supporting execution team
  • · Ensuring history is updated and technically completed on all works orders prior to closing them
  • · Ensuring onsite availability of all materials, manpower and service requirements
  • · Daily contact/coordination with concerned parties that includes Operations Foremen, Maintenance Supervisors and personnel to clarify work scopes on Maintenance Work Orders, required resources, status update, and path forward
  • · Preparing & reviewing maintenance strategies of equipment & providing input into equipment, Unit Maintenance, and Unit Turnaround strategies concerning overhauls and major maintenance requirements for units
  • · End user of SAP system for material management; Spares development and Inventory management for department
  • · Preparation of Annual budget and Ensure expenses are within budget
  • · IMS internal auditor for (ISO:9001, ISO: 14001,ISO : 18001 & ISO : 45001).
  • 09/2007 - 04/2011
  • Maintenance Engineer
  • CES Electrical,RIL, Jamnagar Refinery
  • · Worked together with Mechanical, Instrumentation, Rotary, Inspection, Civil, Plant team to carry out HT/LT motor maintenance jobs
  • · Ensuring activities are being carried out as per check sheet & compliance of EH&S
  • · Continuous improvement of Reliability scope identification, Planning, execution & completion of electrical equipment like HT/LT Motors, Transformers, HVAC, EOT
  • · Knowledge of Hazardous area classifications & hazardous area equipment.
  • Delivered toolbox talk to engineers, supervisor & technicians before execution of job
  • Providing Technical Support in troubleshooting chronic and repetitive failures, repair & overhaul recommendations, root cause analysis and evaluation to ensure the provision of technical expertise, whether the asset can meet its intended purpose or existing service conditions.

Education

Bachelor of Science - Electrical Engineering

Sardar Patel University
Vidyanagar, Gujarat
06.2007

Skills

  • Planning & scheduling using SAP PM
  • Material Management using SAP MM
  • Installations & Commissioning
  • Operation & Maintenance
  • Shutdown & Turn around Management
  • Cross functional Coordination
  • Reliability Engineering
  • Root Cause Analysis

Languages

English
Bilingual or Proficient (C2)
Hindi
Advanced (C1)
Gujarati
Bilingual or Proficient (C2)

Accomplishments

Energy conservation (28%) and reliability improvement of older HVAC unit by injecting Refrigerant additive oil as per ASHRAE. Reliability initiative for LT motor NDE OBC replacement against unintended greasing path in motor design.

Awarded for Energy conservation idea & implementation of HVAC unit by injecting additive refrigerant oil. 28% energy saving recorded and payback period is just 8 months only. Rewarded for submitting & implementation of idea for conservation of condensate water of HVAC system for use as garden irrigation, general purpose

Timeline

Sr Electrical Engineer

Reliance Industries Limited
09.2007 - Current

Bachelor of Science - Electrical Engineering

Sardar Patel University
DIVYESHKUMAR SHUKLA