A highly experienced Professional with a passion for engineering excellence and a commitment to Quality & Safety. Specialized in welding and fabrication processes, with a proven track record of successful projects.
● Supervising Welding activities to drive productivity and efficiency.
● Leading Team meetings and Manpower planning for shift.
● Prepare & provide Welding Instructions as per job schedule.
● Training team members through new welding positions and difficult workflows theoretically & practically.
● Perform Inspections- Before, During & After Welding as per Site Check- sheet.
● Troubleshoot Weld Defects & provide rework methodology.
● Support team to overcome new challenges by forecasting knowledge and skills gaps.
● Developed and implemented Site Welding quality requirements in Work Stations.
● Collaborate with welders to identify and remedy repeated issues.
● Conformity check of completed assemblies to meet final job requirements.
● Support during EN 15085-2 Audit for compliance to requirements
● Applied health and safety standards in hazardous environments.
● PROJECT NAME: E-Loco-Indian Railways (WAG12B)
● POSITION: Associate Welder
● Perform Fit up and welding of Car body shell parts.
● Weld Defect Trend analysis and Control Measures
● Perform Quality inspection on Fabricated parts.
● Update Production order and self Inspection details on AOS
● Update APSYS (ALSTOM Performance SYStem) board for Safety, Quality, Cost and Delivery.
● Perform 5S Self assessment audit.
● Performing Kaizen for method time reduction and to improve quality.
● Preparing Work Shop for AZDP(ALSTOM Zero Deviation Plan) Audit to achieve target score.
● PROJECT NAME: CMRL, KMRL, Sydney Metro, Lucknow Metro
● POSITION: Trainee
● WELDING PROCESS: Resistance Spot Welding, Stud Welding, GMAW
● MATERIALS: SS 301L, SS 304L, S500MC, S355J2+N
Assisted in Welding manufacturing of Metro Trains, HVAC Installation, Floor Assembly, Window Installation, Equipment Installation
● Welding Processes
● WPS/PQR
● NDT Techniques
● Root Cause Analysis
● 5S
● Kaizen
● Development of best welding practices
● Process audits
● Process Improvement
● Excel
● Welding inspection
● Fabrication process
● Method Time Reduction
● Power point Presentation
● Standards –EN 15085, ISO 3834-2, ISO 15085–2, ISO 15608, ISO 15609, ISO 9606, ISO 15614, ISO 5817 Etc
● Participated in spot the hazard program and Won 1st Prize in Competition.
● Participated in 5S Competition in work station and won 2nd Prize.
● Participated in Surgical Strike (Method time reduction) program and reduced 30 hours.
● Supported in en 15085-2 & IRIS Audit and got zero non-conformity in Shop floor.
● Member of Emergency responsible team.