Project: CLIENT: -APGENCO 500 MW Solar Plant at Tadipatri Andhra Pradesh
❖ 2X100 MW Power Plant in Andhra Pradesh
Project: CLIENT: - Oil and Natural Gas Corporation Ltd (ONGC)
❖ 10 MW Power Plant Hazira, Surat Gujarat
Project: CLIENT: - NTPC Solar Park, Phase-II, Jodhpur, Rajasthan.
❖ 2X65 MW Power Plant in Rajasthan
- Analyzing scope of work to be issued to contractor, administrating technical terms per project specification, drawing, and contractual terms.
- Performed in-depth electrical acceptance testing of completed hardware.
- Provided on-site engineering and technical services during installation and fielding processes.
- Inspected and performed validation testing for designed systems and third-party installations.
- Conducting weekly review meetings with the client and contractor.
- Prepared technical documentation for operation, troubleshooting and maintenance of industrial systems.
- Installation and Commissioning of PLC & SCADA system and Comunication Network.
- Installation of PLCC System and SCADA Monitoring Network with SLDC.
- Design and Troubleshoot Network issue remotely and on-site.
- Installations and commissioning of WMS & CCTV System.
- SMU, Inverter erection String Testing and Commissioning of SMU in PV Area.
- Reporting of Daily Progress of project, Report to Site In-Charge and Project Head.