Summary
Overview
Work History
Education
Certification
Affiliations
Timeline
Generic

Ehteshamuddin Chumni

Project Management Engineer
Mumbai,MH

Summary

Current Location: Karimun Indonesia Skype Id: ehteshamgogi1 Profession BE-Mechanical Engineer Certifications Project Management Professional Practitioner in PM - PRINCE2 Professional Summary A top-performing and goal-oriented Construction Professional with more than 16+ years of professional experience in project management, construction engineering, and construction administration for oil & gas, power projects and petrochemical industries. Highly accomplished in using project specs, international design codes & standards. Strong ability to administer & control the construction activities to obtain project objectives within the stipulated cost & time frame with required Quality and safety.

Overview

3
3
Languages
10
10
Certificates
14
14
years of professional experience

Work History

Diamond Sea CHS Ltd, Complex, Near Millatt School
Mumbai
  • INDIA-400102.
  • Organized & optimized the fabrication studies through all the fabrication entities.
  • Manage the constructability process and realize the constructability studies.
  • Experties to coordinate and effective communicate with the team, as well as with other involved departments, actors and parties.
  • Executed the Modularization of tank top structure including associated piping by closed monitoring & controlling of the subcontractor activities in resource mobilization, sourcing of contract material and the logistic to transport modules to project site.
  • Developed and implemented the cost effective plans, procedures and work instructions such as execution plan, fabrication & erection procedures, sequencess, lift plan etc.
  • Defined the clear roles, responsibilities and deliverable requirements in terms of both scope and schedule to all the team members for better accountability.
  • Successfully executed the erection & installation of Modules, miscellaneous structural steel, Piping system, valves including the field pressure testing and re-instatement.
  • Generated the look-ahead weekly & monthly schedules, reported the project details, progress, risks & opportunities, & estimated the budget in order to claim from the contractor/company.
  • Investigated performance, and recommended institute measures for improvement by implementing modification to operating procedures and work instructions.
  • Act as an interface between PMT, yard and other subcon for the Set-up & handover the new Fabrication & Sheathing Plant including EPC of Earth works, Steel Structure, Utility & Conveying systems.
  • Utilized Sheathing Equipment’s from previous project, as well as performed the refurbishment, modification and installation of the same to suite Egina requirement.
  • Independently managed the construction activities of Sheathing, QJ Plant & New Jetty.
  • Executed the Qualification & testing, Fabrication work, Field joint coating, hydro-testing and pre-com activities of approx.
  • 70km flow-lines & risers which includes 9500 welds of an avg.
  • Size 14 inches.
  • Being the interface between project & yard, implemented & executed the scope & sequence of work as related to fabrication of offshore structural entities such as, FPSO piles, Pipeline mitigation system (LBMS, PWMS etc.), LBL Arrays, Flowline End Termination and In-line Tee Assembly.
  • Revised project technical documentation, highlighted discrepancies between pre award and contract documentation, performed technical bid evaluation, and generated summary sheet for approval.
  • Defined deliverable requirements in terms of scope & schedules, and ensured all the specifications, work scope and drawings are documented according to change orders.
  • Implemented the sequence of work, Field & Design Change notices, technical queries & deviation requests with review of detailed impact analysis with management.
  • Scrutinized construction productivity, scheduled performance, revised duration forecasts to complete onshore construction and man-hours, durations and resource requirements.
  • Conducted meetings, followed-up mobilization of products, resources & sub-contractors, formulated the most cost-effective plan, & drafted procurement, fabrication and installation documentations.
  • Presented progress reports and S-curves, in the form of presentation, to the management and client.
  • Technical Skill Set.
  • Review specifications, engineering drawings (GA, P&ID, Isometrics, PFD) and other documents.
  • Establish contract review criteria, identify and resolve discrepancies and divergences from original proposal through investigation of technical queries to Projects/Client.
  • Well versed with international CODES & STANDARDS along with local standards & specifications.
  • Well versed with all the construction phases of the work such as qualification & testing, Fabrication, co-ordination among different disciplines, installation & erection, testing, pre-commissioning and commissioning, start-up & handover etc.
  • Proficient to prepare the execution organization chart for approval.
  • Finalize and requisition the shops and support facilities.
  • Oversee the field preparations by the planners for pre-turnaround activities.
  • Strong ability to monitor, control and manage the teams of various discipline by defining the clear roles & responsibilities.
  • Expertise to plan, develop and organize the construction effort to formulate the most cost-effective plan to timely completion within budget and to implement the execution of that plan.
  • Expertise to review and recommend the control measure by analyzing productivity, efficiency, and schedule performance reports.
  • Proficient to identify, evaluate, and estimate the level of risk involved in a situation, to compare it against benchmarks or standards and to determine an acceptable level.
  • Determines & maintain the records of additional work performed and man-hours spent to complete the task & submitting the same in the form of change work order.
  • Proficient in the preparation & Generation of piping work packs based on division of works and per priority of construction completion.
  • Familiarization of fabrication sequences, assembly and integration of pre-fabricated items for the Jackets and topside side platforms.
  • Proficient in the preparation of piping hydro test packs, PED category, and personnel involvement in pre-commissioning activities (identify SYSTEM and SUB SYSTEMS for pre-commissioning).
  • Check hydro test package for completeness and traceability, all documentation related to the lines i.e.
  • Latest isometric drawings or RLM, mark limits on P & ID and all RFI’s records on the completed lines.
  • Familiar with the Basic rigging & generation of lifting plans for heavy lifts.
  • Well versed with the health, safety & environmental aspect of work.
  • Encouraging site crews to get involve in daily safety task & to prepare JSA prior to start of work.
  • Familiar with the handover documentation, able to prepare and produce/submit the same to client for approval.

Liwa

Orpic, Plastic
  • 1, Port of Sohar Oman.

Barzan Onshore Project

RasGas/JGC

Saipem Nigeria Ltd
  • Chicago Bridge & Iron Co.

Project Management Engineer, Project cum Interface Engineer, Project Engineer Piping, Piping Engineer Senior, Piping Engineer Field, Mechanical Engineer Trainee

Trubarabia Contracting Co, Karnataka Power Corp Ltd

Project Management Engineer

PT Saipem Indonesia Ltd, BP – GTA HUB, Mauritania
09.2019 - Current
  • Experties Deliverables & Contract Documents P&ID, GA, Isometrics & PFD Construction & Installation Communication & Coordination Pre-com & Completion Activities Project Planning & Management Execution Plan, Procedures & SoW Fabrication sequences of Offshore structural entities viz Piles, FLETs, ITAs, Jackets etc.
  • Experties in Microsoft office tools Progress Analysis/Reporting SAP – MM Module.

Project Engineer Sr

McDermott International Inc
02.2018 - 03.2019

Project Engineer

Chicago Bridge & Iron Company
01.2017 - 01.2018

Construction Project Engineer

Orpic, Saipem Contracting Nigeria Ltd, Total Upstream Nigeria Ltd, EGINA UFR Project
Lagos, NIGERIA
11.2013 - 10.2016

Project Engineer

Chicago Bridge & Iron Company
03.2013 - 09.2013

Project Engineer

Chicago Bridge & Iron Company, GASCO - IGD JV Petrofac
07.2012 - 01.2013
  • GS Train-IV Project, Ruwais UAE.

Project Engineer Piping

Chicago Bridge & Iron Company, GASCO
09.2010 - 06.2012
  • IGD Tankage Train-IV Project, Ruwais UAE.
  • Qualification & Testing Crew & Resource Management Records Maintenance Problem Resolution Departments Worked Project Management Team Field Engineering Management Piping & Pipeline Construction Offshore Structure Fabrication Jetty Construction Testing & Pre-commissioning.

Senior Engineer Piping

Chicago Bridge & Iron Company, Shell/Qatar Petroleum, Pearl GTL
06.2008 - 06.2010

Piping Engineer

Trubarabia Contracting Company, Saudi Electricity Company, Riyadh Gas Power, ARABIA
Riyadh
10.2006 - 05.2008

Mechanical Engineer Trainee

Karnataka Power Corporation Ltd, Raichur Thermal Power Plant, Saipem Indonesia
Shakti Nagar, Raichur, INDIA, INDIA
08.2005 - 08.2006
  • Main areas & summary of my responsibilities.
  • Manage the construction effort among the various disciplines & sub-contractors working in the yard and interface with EPC Project team.
  • Identified Construction/Fabrication requirements and constraints, confirmed the request to the Engineering and Procurement Departments.
  • Major Achivement Jacket Construction Design till upending NODEs & Sleeves Prefab till Integration with Decks Modularization of Tank top Work Lifting & Erection of Modules Re-furbuishment & set-up of Sheathing Plant.
  • Set-Up of QJ Fabrication Plant Flare Line Fab & Erection Pipe Fab & Installation Companies Worked PT.
  • Ltd McDermott International Inc.

Education

PG Diploma - Piping Engineering

Suvidya Institute of Technology

BE - Mechanical Engineering

Visveshwaraya Technological University

Certification

Project Planning & Management - CADD Centre Mumbai.

Affiliations

PMI – Since 2013 ASME – Since 2012

Timeline

Project Management Professional

07-2020

Project Management Engineer

PT Saipem Indonesia Ltd, BP – GTA HUB, Mauritania
09.2019 - Current

Project Engineer Sr

McDermott International Inc
02.2018 - 03.2019

Project Engineer

Chicago Bridge & Iron Company
01.2017 - 01.2018

Construction Project Engineer

Orpic, Saipem Contracting Nigeria Ltd, Total Upstream Nigeria Ltd, EGINA UFR Project
11.2013 - 10.2016

Project Engineer

Chicago Bridge & Iron Company
03.2013 - 09.2013

Project Engineer

Chicago Bridge & Iron Company, GASCO - IGD JV Petrofac
07.2012 - 01.2013

Project Engineer Piping

Chicago Bridge & Iron Company, GASCO
09.2010 - 06.2012

Senior Engineer Piping

Chicago Bridge & Iron Company, Shell/Qatar Petroleum, Pearl GTL
06.2008 - 06.2010

Piping Engineer

Trubarabia Contracting Company, Saudi Electricity Company, Riyadh Gas Power, ARABIA
10.2006 - 05.2008

Mechanical Engineer Trainee

Karnataka Power Corporation Ltd, Raichur Thermal Power Plant, Saipem Indonesia
08.2005 - 08.2006

Diamond Sea CHS Ltd, Complex, Near Millatt School

Liwa

Orpic, Plastic

Barzan Onshore Project

RasGas/JGC

Saipem Nigeria Ltd

Project Management Engineer, Project cum Interface Engineer, Project Engineer Piping, Piping Engineer Senior, Piping Engineer Field, Mechanical Engineer Trainee

Trubarabia Contracting Co, Karnataka Power Corp Ltd

PG Diploma - Piping Engineering

Suvidya Institute of Technology

BE - Mechanical Engineering

Visveshwaraya Technological University
Ehteshamuddin ChumniProject Management Engineer