Summary
Overview
Work History
Education
Skills
PERSONAL DETAILS
Timeline
Generic
Ehteshamul Haque

Ehteshamul Haque

Piping Supervisor
New Delhi,UP

Summary

Results-driven Mechanical Engineering professional with 15 years of extensive experience executing projects in petrochemical refineries, oil and gas, fertilizer plants, and power generation facilities. Demonstrated leadership in mentoring diverse teams and fostering a collaborative environment that drives project success. Expertise in establishing and promoting safe working practices while ensuring compliance with industry codes and standards for piping systems. Committed to delivering high-quality results through strategic planning and effective team management, consistently achieving project goals on time and within budget.

Overview

25
25
years of professional experience

Work History

Roots Energy & Engineering Services

Piping Supervisor
01.2024 - 2025
  • EPIC for the mitigation of hydrocarbon emissions from Qatar Energy refinery storage tanks, Mesaieed (GC21107800).

Black Cat Engineering & Const. WLL

Mechanical Supervisor
01.2010 - 01.2023

Projects Worked:

  • EPIC for Dukhan production facilities upgrade (DPFU)
  • EPIC for well flow lines in Dukhan field (2020 to 2022)
  • Shut down work for GC191008B0 (13 Feb to 23 March 2022)
  • EPIC for CNG station at RLIC (2019 to 2020)
  • Qatar shell (QSGTL) -
  • Carbonyl piping replacement (CPR) during TA-2019(Jan 2019 to March 2019)
  • Chiyoda Almana Engineering LLC -
  • General construction work for Ras gas helium-3 (March 2017 to December 2018)
  • Amec Foster Wheeler -
  • Blachford Preston complex (BPC) 3 project at Udeid – American Air Base - Turnkey MEP work for two billets (procurement, installation and Commissioning of fire suppression system (wet Pipe, reaction, fm200), water supply system, chiller piping and drainage system (2015 TO 2017).
  • Qatar gas (QG) Shutdown (April 2015 to May 2015).
  • Qatar Petroleum (QP) Dukhan Field Sweet fuel gas supply to Dukhan field consumer - 70 km pipeline with 18 valve stations and its piping (pipeline dai involved - 36",18",12",10",6" & 4") (November 2010 to Feb 2015)

BAHWAN ENGINEERING COMPANY L.L.C.

Piping Supervisor
01.2009 - 01.2010

Client - GS Engineering & Construction

Project - Salalah Methanol


RESPONSIBILITIES:

  • To lead a team of technical personnel and maintain harmonious working relationships.
  • To plan schedule manpower, material and equipment within the set time frame.
  • To deploy and utilize the manpower effectively.
  • To perform tasks of work to my subordinates and workers.
  • Supervise and coordinate construction activities.
  • To ensure work meets all project specifications and requirements.
  • To interpret instruction and related information into meaningful and accurate work directives, drawings, and guidelines.
  • Checking of spools conformity regarding the isometric and P&ID.
  • Monitoring and checking of materials.
  • Motivate the foremen/charge hands to achieve the target.
  • To monitor progress of fabrication, erection work and liaise with construction superintendent daily.
  • To receive daily progress reports and report to the discipline manager and discuss the site's condition.
  • To maintain effective communication between the implementation and execution team.
  • To attend daily coordination meetings and introduce new management decisions.
  • To ensure that subcontractors adhere to the latest approve for construction project drawing, specification, procedure and site instruction.
  • Supervision of pre-commissioning activities in particular hydro tests. To check that hydro tests are performed in accordance with definition of piping class and PID’s.
  • Supervising bolt torquing and final box activities.
  • Coordinating piping inspection as per inspection and test plan.
  • To ensure complete piping activities safely within the schedule.

Consolidated Contractor Company W.L.L.

Piping Foreman
01.2006 - 01.2008

Client - Japan Gas Company (JGC, Arabia)

Project - Jubail chevron Philips (K.S.A)


RESPONSIBILITIES:

  • To lead a fabrication team at site and workshop.
  • Prepare and review all the isometric drawings received for fabrication.
  • Prepare MTO for pipes & pipe fittings for fabrication as per isometric drawing.
  • Supervise Fabrication, erection of piping spools & pipe support.
  • Plans work schedule and activities, as well as manpower requirements.
  • Monitoring progress & ensuring quality of job on a target basis.
  • Prepare as built drawings and other documents.
  • Modification of piping spool as per revised isometric drawing.
  • Conduct fit up & welding inspection prior to full welding & ensure that only qualified welders are allowed to perform in accordance with approved WPS.
  • Installation of firefighting equipment & related piping.
  • Coordinated with QA/QC personnel and client.
  • Well knowledge of P&ID, piping layout, isometric, piping class, and standard pipe support.
  • Inspection of piping system and prepare punch list, Hydro testing inspection of all process and utilities line.
  • Resolving field problems and liaison with clients and supervising mechanical crew.
  • Safety and Quality Responsibilities
  • Follow and maintain company standards of quality in accordance with company quality system requirements.
  • Strong commitment to safety.
  • Take reasonable care of own health and that of others in the workplace.
  • Conducting daily toolbox talk, make sure everybody attends toolbox and ensures employees comply with company safety policy. Reporting every incident, near miss, accident to the safety department.
  • To ensure that risk assessment has been undertaken & agreed with client prior to any new type of activity.
  • To make sure that housekeeping is done every day after work.

Consolidated Contractors Company Oman L.L.C - OMAN

C/H Piping
01.2003 - 01.2005

Client - Snamprogetti & Technip Coflexip

Project - Oman India Fertilizer Project (OMIFCO) SUR


RESPONSIBILITIES:

  • Conduct safety toolbox meetings every morning.
  • Motivating and monitoring pipe fabrication team at fab shops and sites.
  • Plans work schedule and activities and manpower requirements.
  • To ensure that the personnel involved in the work are adequately trained and understood by the job assigned to them.
  • Perform welding supervision on CS, SS, LTCS piping as per project specification and procedures.
  • Checking fabricated spools, tagging for site verification.
  • Supervision and close monitoring of fabrication of support and special pipe support.
  • Coordinate site activities and communicate with supervisors.
  • Prepare daily fit up and welding reports.

National Construction Corp. Ltd. - INDIA

Piping Foreman
01.1999 - 01.2002

Project - Ragapur Steel Plant West Bengal


RESPONSIBILITIES:

  • Motivating and monitoring pipe fabrication team at fab shops and sites.
  • Plan work schedule, activities and manpower requirements.
  • To ensure that the personnel involved in the work are adequately trained and understood by the job assigned to them.
  • Checking fabricated spools, tagging, colour coding and site verification.
  • Supervision and close monitoring of fabrication of piping spools.
  • Monitoring site activities and requirements to provide sufficient technical support and safety regulations.
  • Coordinates with QA/QC personnel.
  • Prepare daily fit up and welding reports.

Rediant Engineering & Construction Ltd. - INDIA

Piping Foreman
01.1998 - 01.1999

Project - NTPC Rihand Nagar


RESPONSIBILITIES:

  • Motivating and monitoring pipe fabrication team at fab shops and sites.
  • Plan work schedule, activities and manpower requirements.
  • To ensure that the personnel involved in the work are adequately trained and understood by the job assigned to them.
  • Checking fabricated spools, tagging, colour coding and site verification.
  • Supervision and close monitoring of fabrication of piping spools.
  • Monitoring site activities and requirements to provide sufficient technical support and safety regulations.
  • Coordinates with QA/QC personnel.
  • Prepare daily fit up and welding reports.

Education

Diploma - Mechanical Engineering

Aligarh Muslim University
Aligarh, India
04.2001 -

Intermediate Certificate - Science

Bihar Intermediate Education Council
Patna, India
04.2001 -

Secondary School Examination - Secondary Education

Bihar School Examination Board
Patna, India
04.2001 -

Skills

PTW Training Qatar Energy

PERSONAL DETAILS

  • Nationality: Indian
  • Date of birth: 21.01.1976
  • Languages known: English, Hindi and Urdu
  • Passport Details: V7097858 Expiry (03-02-2031)

Timeline

Roots Energy & Engineering Services

Piping Supervisor
01.2024 - 2025

Black Cat Engineering & Const. WLL

Mechanical Supervisor
01.2010 - 01.2023

BAHWAN ENGINEERING COMPANY L.L.C.

Piping Supervisor
01.2009 - 01.2010

Consolidated Contractor Company W.L.L.

Piping Foreman
01.2006 - 01.2008

Consolidated Contractors Company Oman L.L.C - OMAN

C/H Piping
01.2003 - 01.2005

Diploma - Mechanical Engineering

Aligarh Muslim University
04.2001 -

Intermediate Certificate - Science

Bihar Intermediate Education Council
04.2001 -

Secondary School Examination - Secondary Education

Bihar School Examination Board
04.2001 -

National Construction Corp. Ltd. - INDIA

Piping Foreman
01.1999 - 01.2002

Rediant Engineering & Construction Ltd. - INDIA

Piping Foreman
01.1998 - 01.1999
Ehteshamul HaquePiping Supervisor