Summary
Overview
Work History
Education
Skills
Accomplishments
Timeline
Generic
Faiz  Shaikh

Faiz Shaikh

Ex-MBA: O & SCM NMIMS, BE-Mech, Sr-Executive -Mfg Professional Siemens Ltd.
Navi Mumbai

Summary

Executive MBA Operation and Supply Chain Management from SVKM's NMIMS , BE-Mech with 11+ year's Industry experience & Strong interpersonal and leadership skills in Leading & improve workforce productivity by applying Industrial Engineering and Lean tools.. (including 2 years O&M of HVAC system) Deft in managing Lean Manufacturing operations and new product line setup involving output management, team building, development and Cross-functional working.

.

Overview

11
11
years of professional experience
6
6
years of post-secondary education

Work History

Senior Executive

Siemens Limited
Mumbai
10.2015 - Current

· NOV 2019 Onwards: Senior Executive-Manufacturing Professional Managing the Non-Standard assembly Line of Medium Voltage (MV) Switchboard (11kV Nx-Air to 33kV old AIS)


· OCT 2015 - OCT 2019: Executive-Manufacturing Engineering Responsible for Lean line Assembly of MV Indoor and Outdoor Vacuum circuit breakers (IVCB and OVCB 11kV 25kA 1250A to 33KV 31.5kA 2500amps) Role and

· Responsibilities:

1) KPI’s: Labour productivity, Delivery Reliability, First Pass Yield (FPY).

2) Execution of Daily Production Plan (DPP) and Quality targets on assembly lines

3) Work allocation and supervision to 40 workmen/officers according to their respective skills/abilities and thereby ensuring effective utilization of manpower and the desired output (per day/shift).

4) Troubleshooting assembly problems (pertaining to Process, Quality, Design, Logistics etc.) affecting cycle time by implementation of cross-functional communication strategies

· Working jointly with Quality Assurance, Quality Incoming, Design & Process Engineering team for:

i. Obtaining solutions on chronic quality issues

ii. Improvements/Modifications required in design / component quality / assembly sequence with objective of improving the FPY, lower cost and easier assembly.

iii. Conducting trials for completely new products or sub-assemblies and fixtures and conveying necessary changes to design/process planning.

· Working jointly with Process Planning and Engineering for

i. Work content balancing / rebalancing on lean line to maintain TAKT

ii. Line improvements and updating of Standard Operating Procedures (SOPs).

iii. Integration of new products on Lean Line.

iv. Designing fixtures and tools as per assembly requirements

5) Educating workmen/officers about correct assembly methods/sequence, Safety practices,5S and discipline, to ensure quality avoid material wastage and avoid rework and unwanted accidents.

6) Coordination with supplier for elimination of faulty and missing components by training their personals.

7) Handling/meeting needs of the internal customer (Panel groups (IN, APS, SE & System House).

8) Maintained line discipline, housekeeping and safety

Mechanical Engineer- Team Leader

Siemens Ltd
Mumbai
10.2013 - 09.2015

Worked as Mechanical engineer (Team Leader) with Siemens for Integral Planned Maintenance of HVAC systems at Mumbai Chhatrapati Shivaji International airport (MIAL) Terminal 2

Role and Responsibilities:
1. Worked as team leader for planning and coordinating of Preventive Maintenance (PM),
Condition monitoring (CM)and LLF-Look Listen Feel activities to avoid
failures/Breakdowns.
2. Supervision to Shift supervisors and indirectly to technicians to ensure execution of plan.
3. Daily updating and meeting with client, responsible for closure of breakdowns with root cause analysis.
4. Suggesting/implementing Improvements highlighting 5S, Waste Elimination, Safety, Cost Reduction, Time Reduction, Training, Maintainability Improvement, Productivity Improvement and Alternatives for Energy saving.

Production Engineer

Siemens Ltd
Navi Mumbai
02.2011 - 02.2013

Production Engineer (Contractual)
Production engineer for Lean Line assembly of Indoor Vacuum circuit breaker (IVCB) comprising 40+ workmen.

Education

Bachelor of Engineering - Mechanical Engineering

Father Agnel’s Fr. C. Rodriguez College of Engineering, Mumbai University, C.R. Institute of Technology
Mumbai
05.2005 - 06.2010

MBA - Operations And Supply Chain Management

Narsee Monjee Inst For Management Studies NMIMS
Mumbai
07.2021 - 10.2022

Skills

Lean Manufacturing

undefined

Accomplishments

  • Output enhancement and Avg SMH reduction by implement of lean line working for NSD/DTO assemblies on STD line with introduction of sub-assembly stations.
  • Product improvement /cost saving through design optimization of 3AH5-P VCB leading to saving unto rs 1 lacs annually
  • Energy saving measure implemented at MIAL T2 CSIA international airports Mumbai.
  • Entrusted to resolve Project completion issue at KPLC Kenya.
  • Involved in new product development of 36KvRD ivcb.
  • Multiple Star Awards for performance for cost saving , output optimization for NSD/STD Switchboards, IVCB and OVCB.

Timeline

MBA - Operations And Supply Chain Management

Narsee Monjee Inst For Management Studies NMIMS
07.2021 - 10.2022

Senior Executive

Siemens Limited
10.2015 - Current

Mechanical Engineer- Team Leader

Siemens Ltd
10.2013 - 09.2015

Production Engineer

Siemens Ltd
02.2011 - 02.2013

Bachelor of Engineering - Mechanical Engineering

Father Agnel’s Fr. C. Rodriguez College of Engineering, Mumbai University, C.R. Institute of Technology
05.2005 - 06.2010
Faiz ShaikhEx-MBA: O & SCM NMIMS, BE-Mech, Sr-Executive -Mfg Professional Siemens Ltd.