Motivated self-starter with a passion for mechanical engineering, ready to utilize education and work experience in a new career. Strong foundation in mechanical principles and a track record of applying technical skills to solve complex problems. Seeking a challenging role to contribute to innovative projects and grow professionally. Expertise in design, analysis, and project management to offer a dynamic engineering team.
Overview
20
20
years of professional experience
6
6
years of post-secondary education
5
5
Certificates
3
3
Languages
Work History
Mechanical Engineering Project Leader
TOYAH PTE LTD
08.2023 - Current
Company Overview: (Exxon Mobile Chemical and Refining Integrated Singapore Plant)
Planning, Scheduling and taking care of the preventive and corrective site works of all the structural and modification works. Installation of toe plate, handrail, Grating work, Supervision of Cutting, Grinding, Drilling and Welding the still structural works.
Responsible for meet client requirement about for every job/Project , it includes detailing, checking, fabrication and Installation.
Developed and maintained of structural work list.
Worked closely with contractors and subcontractors to make sure industry and customer specific procedure are meet.
Modification of Handrail and Grating works.
Site supervision of Cutting, Grinding, Drilling and Welding the still structural works.
Nature of work: Mechanical Works
Responsibility of Structural works:
Mechanical Engineer
KNE SINGAPORE PTE LTD
10.2023 - 08.2024
Planning, Scheduling and taking care of the preventive and corrective maintenance works of all the equipment (static and rotating), valves, pumps as well as the wastewater treatment plant as the in-house contractor mechanical Supervisor at Jurong Rock Caverns (JRC), Singapore.
Apply Permit-to-Work, Job safety Analysis (JSA), Lock-out, Tag-out (LOTO) or Defeat of Safety Critical Equipment (DOSCE) during maintenance activities.
Assessing work requirements, Planning and Execution of Pipeline fabrication.
Carry out terminal power shutdown work every three years by making arrangement for the shutdown and liaising with several parties to align with the terminal operations.
Working on the various preventive and corrective maintenance work orders and documentation according to Computerized Maintenance Management System (CMMS) data base at JRC for site operations not to be hindered or disrupted. During corrective maintenance executing proper root cause analysis and solve efficiently to ensure no future errors arise.
Maintaining the integrity of mechanical equipment such as pumps, loading arms, storage tanks, and pipelines to ensure no failure or faulty component after maintenance and servicing and assisting in maintenance and upgrading of Mechanical equipment.
Managing the tank storage and pipeline overhaul and replacement works etc. and Carry out yearly mandatory equipment.
Nature of work: Mechanical and Piping Work
Responsibility of Process Piping and Equipment:
Mechanical Engineer (Piping, Static& Rotary)
ALTRAD SERVICES SINGAPORE PTE LTD.
07.2022 - 03.2023
Review drawings, supporting documents, retrofit instruction created by others to verify specification, dimensioning, Routing and adherence to organization standard practice.
Over all mechanical equipment installation and piping laying works on site.
To follow –up the works schedule and manage the sub-contractors works and provide the direction to the site supervisors to resolve the issues on site.
To read the P&ID piping drawings and execute the work site.
To prepare the material take of using the ISO drawings and to follow-up the procurement of the material delivery to site on scheduled time.
To follow-up the equipment supplier for the fabrication works on stages and collect the QA/QC documents and submit to consultant approval and arrange the equipment delivery to site.
To study the piping drawing and identify the clashes with other services and lies with the sub-contractors to make the alternative proposal to consultant approval.
To get the Hydro test testing procedure for all the piping works from the sub-contractor for review and submit for consultant approval.
To co-ordinate the cast-in pipe installation works with yard piping interfacing works.
To prepare the inspection schedule submit to consultant for weekly and daily.
To Compile the QA/QC report and the inspection form copy for proper documentation. The inspection form one copy submits to Contract side.
Co-ordinate Design with other engineers discipline Engineers.
Participate in and provide input to the mechanical Process.
Conduct final inspection and participate in equipment and system commissioning.
Participate in pre commissioning and initial acceptance of projects.
Nature of work: Phenol Plant within the existing waste water Treatment Plant including mechanical and piping work. (Samwoh corporation Ptd Ltd) at Banyan Caverns.
Diesel Oil Feeding Pump and Pipe line work – Vopak Banyan KMC Site.
Responsibility of Process Piping and Equipment:
Senior Engineer (Mechanical)
Sri Lakshmi Engineering Works – GEA Pvt Ltd.
05.2018 - 06.2022
Checked and Review drawings for fabrication and related documents, ensuring cut length, material, spec, paint/coating system.
Responsible for meet client requirement about for every job/Project , it includes detailing, checking, fabrication and Installation.
Developed and maintained of piping list.
Worked closely with contractors and subcontractors to make sure industry and customer specific procedure are meet.
Participate in operation and maintenance of plant operation and handing over inspection to client.
NF RO Skid, Regenerative Skid and Pasteurized skid for Product line installation.
Nature of work: Erection of Utilities Line (RO,RAW,SIREAM,CONDENSATE,CHILLED WATER) AND Product Line.
Responsibility of Process Piping:
Senior Engineer (Mechanical)
UMA OYA Multipurpose Development Project , FARAB, Energy and water Project. Srilanka.
05.2014 - 03.2018
Responsible for quantity reporting, fabrication, construction, works packaging, quality verification, field changes and system turnover of piping.
Participate in pre commissioning and initial acceptance of projects.
Participate in operation and maintenance of plant operation and handing over inspection to client.
Technical evaluation of proposal/quotation from subcontractors and suppliers.
Preparation and finalization of bid proposal
Attends pre-bid meeting
Conducts site visits
Installing and commissioning as well as conducting tests & inspections to ensure operational effectiveness of plant & utilities; planning & effectuating maintenance schedules for equipment.
Erection of all HT & LT systems of smelter expansion projects and providing construction power to entire project area.
Accountable for testing and commissioning of all switchyard equipment.
Preparation drawing for plate cutting, pipes for tank as per site condition.
Making observations and taking measurements from drawings and planning the sequence of operation and resolving any unexpected technical difficulties, and other problems that may arise.
Planning of daily fabrication activities and ensuring that the required manpower is being held by Sub- Contractors to carry out the daily production activities.
Responsible for the planning and coordination of all manpower and equipment, materials, supplies and sub-contracted services.
Engineering of works in fabrication/erection and Co-ordination with client regarding progress and issues involved during the project.
Nature of work: Pipe Fabrication and Installation of pipe line and Gates.
Review drawings, supporting documents, retrofit instruction created by others to verify specification, dimensioning, Routing and adherence to organization standard practice.
Studying all drawings of Pipe Lining and Gates for Cooling Water Pump House/Barrage/Dam and fuel oil pump house ( LDO & HFO TANKS).
Civil/Structural Drawing includes, Building floor plane, section and elevation, concrete/structural foundation, foundation plane and details warehouse, pipe racks and windows etc.
Preparation of drawing for reinforced and pre-stressed concrete structure from concrete and shop drawing including reinforcement detailing.
Fabrication & Erection of Pipes Various Diameters like Ø750 mm to Ø4000 mm Pipes and Inspection of incoming materials based such as plates, pipes, flanges, elbows etc.
Duplex Type Hydro Testing of Fabricated Pipes Various Diameters like Ø800 mm to Ø4000 mm Pipes.
Cement Mortar Lining (Inner & Outer) and Grunting of Pipes Various Diameter like Ø750 mm to Ø4000 mm for Cooling Water Pump House.
Handle the tasks of reviewing Piping and Instrumentation Drawings (P&IDs) for safe and operable features for Fire production system.
Preparation drawing for plate cutting, pipes for tank as per site condition.
Nature of work: Fabrication and Installation of Pipeline and Tanks.
Supervisor (Mechanical)
2x600MW NORTH CHENNAI THERMAL POWER PLANT - Tamil Nadu Electricity Board (TNEB)
01.2010 - 01.2011
Company Overview: Bharat Heavy Electricals Ltd. (BHEL)
Review drawings, supporting documents, retrofit instruction created by others to verify specification, dimensioning, Routing and adherence to organization standard practice.
Planning, Scheduling and monitoring of all fabrication activities of following projects and Preparation of daily, weekly and monthly Progress Reports.
Making observations and taking measurements from drawings and planning the sequence of operation and resolving any unexpected technical difficulties, and other problems that may arise.
Studying all drawings of Gates, Trash Rack & CS and DM Tanks.
Fabrication & Erection of Movable Trash Rack Cleaning Machine.
Studied Drawing for Putting First Stage Embedded Parts for all Gates.
Studied Drawing for Erected Second Stage Embedded Parts for all Gates.
Maintenance & Troubleshooting of Movable Trash Rack Cleaning Machine.
Nature of work: Fabrication and Installation of Tanks and Gates.
Asst. engineer (Structure)
SMC Machinery PTE LTD
11.2008 - 03.2010
Review drawings, supporting documents, retrofit instruction created by others to verify specification, dimensioning, Routing and adherence to organization standard practice.
Responsible for overseeing and guiding engineers in producing tools and machinery in compliance with safety standards and technical applications.
Planning, Organizing and overseeing the assembly, Erection, Operation and Commissioningof Machinery & Equipments.
Interface with Safety Department, Technical, Construction and Facilities Management in project delivery.
Mechanical maintenance of machineries such as Boom lifts, scissor lifts, compressors, vibrating roller, fork lift, bar bender, bar cutter etc.
Upkeep all maintenance records of machinery and equipments.
Spare parts planning for machines & Equipments.
Supervises the machinery, equipments and the installations
Nature of work: Fabrication and Erection of structure work for machinery.
SUPERVISOR (Structure)
UE METAL PTD LTD.
10.2005 - 10.2006
Review drawings, supporting documents, retrofit instruction created by others to verify specification, dimensioning, Routing and adherence to organization standard practice.
Segregation of materials according to the specification and also to the requirements of the projects carried out.
Reading & taking details from drawings and planning the sequence of operation.
Preparation of work instruction to workers to avoid double time works at the jobs and continuously improving the production processes.
Maintaining the shop floor discipline and safe work environment in the department.
Nature of work: Fabrication and Erection of structure work for work shop.
Education
B.E. - Mechanical Engineering
BHARATHIDASAN UNIVERSITY
01.2000 - 01.2003
Diploma - Mechanical Engineering
STATE BOARD OF TECHNICAL EDUCATION AND TRANING
01.1997 - 01.2000
Skills
Project Management
undefined
Certification
Manage Work at Height - Jurong Academy Pte Ltd, SINGAPORE
Accomplishments
Review of design drawings and documents.
Preparation of technical Submittals.
Site supervision.
Coordination with client, consultant, main contractor & subcontractor to resolve technical and other issues.
Liaison with regulatory authorities Development of method statements for testing & commissioning for different system.
Planning of activities and materials.
Project cost monitoring.
Project progress monitoring
To deal with variation orders
Safe and timely execution of site activities
Selection of supplier, sub-contractors and materials
Preparation of O&M manuals
Participating in Value Engineering Meetings
Timeline
Certificate in Generic Manufacturing Skills (Process) - AOP ASPRI Integrated Training Centre
03-2025
Workplace Safety and Health Control Measures - 4
12-2023
Mechanical Engineer
KNE SINGAPORE PTE LTD
10.2023 - 08.2024
Mechanical Engineering Project Leader
TOYAH PTE LTD
08.2023 - Current
Mechanical Engineer (Piping, Static& Rotary)
ALTRAD SERVICES SINGAPORE PTE LTD.
07.2022 - 03.2023
Senior Engineer (Mechanical)
Sri Lakshmi Engineering Works – GEA Pvt Ltd.
05.2018 - 06.2022
Senior Engineer (Mechanical)
UMA OYA Multipurpose Development Project , FARAB, Energy and water Project. Srilanka.
2x600MW NORTH CHENNAI THERMAL POWER PLANT - Tamil Nadu Electricity Board (TNEB)
01.2010 - 01.2011
Asst. engineer (Structure)
SMC Machinery PTE LTD
11.2008 - 03.2010
SUPERVISOR (Structure)
UE METAL PTD LTD.
10.2005 - 10.2006
B.E. - Mechanical Engineering
BHARATHIDASAN UNIVERSITY
01.2000 - 01.2003
Diploma - Mechanical Engineering
STATE BOARD OF TECHNICAL EDUCATION AND TRANING
01.1997 - 01.2000
LNGG
Tamil
English
Hindi
Disclaimer
I consider myself familiar with (MEICA) Mechanical and Electrical Engineering. I am also confident of my ability To work in a team .I hereby declare that the information furnished above is true to the best of my knowledge. Thanking you Yours Faithfully G.Premanand.
ADDITIONAL QUALIFICATION
AutoCAD 2005 - CAD Service, Tamilnadu, India
Pro/Engineer 2001 and Ansys - CAD Service, Tamilnadu, India
Solid works 2005 and UG NX3 and Master Cam 8.1 - CAD Service, Tamilnadu, India
Disclaimer
I consider myself familiar with (MEICA) Mechanical and Electrical Engineering. I am also confident of my ability To work in a team .I hereby declare that the information furnished above is true to the best of my knowledge. Thanking you Yours Faithfully G.Premanand.
First Grade Classroom Teacher at Pecos Barstow Toyah Independent School DistrictFirst Grade Classroom Teacher at Pecos Barstow Toyah Independent School District
Elementary Special Education Teacher- Kindergarten at Pecos Barstow Toyah ISDElementary Special Education Teacher- Kindergarten at Pecos Barstow Toyah ISD