Mechanical Engineering professional experienced in transmission assembly and production operations. Achieved significant improvements in assembly line efficiency and product quality through optimization techniques and root cause analysis. Focused on driving continuous improvement and effective team leadership.
Overview
9
9
years of professional experience
7
7
years of post-secondary education
Work History
Assembly Engineer / Sr. Technician (Transmission)
John Deere India Pvt. Ltd.
Pune
11.2017 - Current
Led transmission assembly line operations and managed a team of 30 operators
Enhanced first pass yield (FPY) and minimized rejections through application of 5 Whys and 7 QC tools
Performed root cause analysis (RCA) and implemented corrective actions
Ensured adherence to standard operating procedures (SOPs) to maintain consistent quality.
Applied line balancing and conducted bottleneck analysis to optimize workflow
Developed and implemented Poka-Yoke (mistake-proofing) strategies to eliminate assembly errors
Achieved continuous improvement in safety, quality, cost, and delivery (SQCD) through targeted initiatives
Implement lean practice to reduce waste and enhance efficiency.
Education
BE - Mechanical Engineering
SSSUTMS
Sehore, India
07.2022 - 06.2025
Diploma - Mechanical
MSBTE
Achalpur, India
07.2012 - 06.2015
SSC -
MSBSHSE
Washim, India
06.2011 - 03.2012
Skills
Lean Manufacturing
7 QC Tools
Root cause analysis
Continuous improvement
5 Whys Analysis
Line Balancing
Process Audits
SOP Adherence
Visual inspection
Safety
Problem-solving
Critical thinking
Team management
Accomplishments
Awarded for shop floor safety drive and adherence
Representative of Best Continuous Improvement (CI) Team
Awarded for changing layout of assembly area
Awarded for Poka-Yoke implementation in transmission factory
Reduced rejection cost of assembly line
Led visual improvement projects in TFF
Gave highest number of suggestions and reported unsafe conditions
Projects
Implemented material kitting to eliminate wrong part fitment and improve flow
Executed Poka-Yoke to reduce assembly errors and improve quality
Led Lean (NVA reduction) project to improve efficiency
Improved line balancing and removed bottlenecks to increase productivity