Sr. Project Consultant Electrical

Gopal singh

M/s Tata Consulting Engineers Pvt Ltd
Jamnagar
Gopal singh
13
years of professional experience
1
Certification

Dynamic electrical engineer with extensive experience at Tata Consulting Engineers, excelling in project engineering and coordination. Proven expertise in MV and LV cable sizing and preventive maintenance, complemented by strong leadership skills. Successfully led installations and ensured operational readiness, driving project success and stakeholder satisfaction.

Work History

Sr. Project Consultant Electrical

8 Months
M/s Tata Consulting Engineers Pvt Ltd | Jamnagar | 03.2026 - Current
  • Led project planning and coordination for engineering consulting assignments at Tata Consulting Engineers.
  • Managed stakeholder communication across design, site, and vendor teams.
  • Mentored project teams on documentation standards and consulting workflows.
  • Installed and commissioned sandwich-type busduct for cell factory, ensuring operational readiness.
  • Completed cable laying from busduct to machine, facilitating seamless integration of electrical systems.
  • Assisted in developing PV solar project plans.

Sr. Executive Electrical & Maintenance

3 Years 5 Months
M/s Benzochem Industries Pvt, Ltd | Dahej | 09.2022 - 02.2026
  • Resolved electrical faults across HT, LT, transformer, and EHT systems to ensure operational reliability.
  • Supported installation and commissioning of PCC panel and capacitor panel.
  • Supported installation and commissioning of SIMO-Code IMCC (Pro V-PN) and communication with DCS through Profinet.
  • Supported installation and commissioning of 750 kVA Sterling make DG.
  • Supported installation and pre-commissioning of 3 MVA x 2 nos. distribution transformers, 33 kV panels, and 415 V PCC, MCC, APFC panels.
  • Performed preventive and corrective maintenance on UPS, VFD, MCC, PCC, HT panel, and DG sets.
  • Performed HT and LT cable laying and termination jobs.
  • Oversaw electrical installation and quality control to meet project specifications and safety standards.
  • Monitored material consumption during project work to prevent shortages and ensure smooth execution.
  • Conducted daily meetings with contractor and tracked daily progress against project timeline.
  • Monitored work progress against established project timelines. against plan and updated status.
  • Maintained good working knowledge of SAP for material requisition, stock control, gate pass, bill processing, service entry, reservation, and budget tracking.
  • Operated and maintained flameproof electrical equipment in plant.
  • Read electrical drawings, prepared work quantity lists, and supported field implementation.
  • Facilitated adherence to safety regulations through permit system execution. before work start.
  • Implemented lockout/tagout procedures.
  • Completed PSSR activity for all electrical installations before electrical power charge.
  • Arranged and submitted installation compliance documents for electrical equipment. for electrical liaison work, drawing approval, and transformer and HT panel energization.
  • Prepared documents and uploaded files on IFP portal and CEICED site for new electrical equipment installation.
  • Supported overall project execution and maintenance jobs.

Site Engineer

4 Years 6 Months
M/s ABB India Ltd | 02.2018 - 08.2022
  • Supported electrical site operations for project electrical installation works.
  • Assisted with overall E&I erection activities across site.
  • Supported installation of 6 MVA and 2.5 MVA distribution transformers, 11 kV panels, and 415 V PCC/IMCC/LV switchgear panels for all LC areas.
  • Carried out HT and LT cable laying and termination works.
  • Assisted with tray and raceway installation activities across project areas.
  • Supported cement plant lighting and earthing installation works.
  • Assisted with PCS and BSS switch installation for conveyor systems.
  • Prepared work schedules and tracked project execution activities.
  • Followed Permit to Work, Job Safety Analysis, and job plan procedures during site execution under owner and company requirements.

Site Engineer

2 Years 10 Months
M/s HINDUSTHAN ZINC | UDAI PUR | 02.2018 - 12.2020
  • As an Electrical site engineer
  • Erection of 1Mva transformer & HT and LT panels
  • Managed workload of project-discipline engineers and technicians to ensure timely project delivery.
  • Motivated site manpower to meet daily project objectives.
  • Planning and monitoring job allocation resources / manpower performance.
  • Prepared status reports outlining progress towards project objectives.
  • Highlighted project scope for reference

1 Year 4 Months
RIL, DTA CPP Jamnagar | 01.2015 - 05.2016
  • (A) 110 MW GT # 10 J3 CPP Expansion & Syn Gas Shut Down Jobs.
  • Handling the overall Electrical Execution activities behalf of M/s Shri Magta for the GT # 10 Electrification Job.
  • Erection of LT panels, HT panels for MRS & ECB Substation.
  • Handling the overall Tray Raceway Jobs.
  • Execution of overall LT & HT cable laying jobs for CPP.
  • Installation and execution of LT Power Transformer – 6.6/0.415KV 2MVA x 02 nos and 33/6.6KV 16-20 MVA x 02 Nos.
  • Handling overall illumination & Area lighting jobs.
  • Execution of Plant Earthing, Equipment Earthing overall manner for CPP plant.
  • Preparation of As-Built Drawing for final documents.
  • Reconciliation & Final measurement and Billing.
  • (B) 400KTA LDPE Plant Electrification Job, J3 RIL # June 2016 – January 2017
  • (C) 92 MW STG, J3 CPP Expansion. # January 2017

Engineer

9 Months
M/s Shri Magta Engineers | 11.2013 - 08.2014
  • Managed Reliance Refinery J3 projects to ensure timely completion.
  • Executed erection of 220KV equipment at DTA CPP Switchyard, ensuring compliance with safety and operational standards.
  • Handling the 198 kV Lightning Arrestor – Erection job.
  • Handled the installation of equipment at THEBA JAMNAGAR SWICHYARD GETCO.
  • Handling the Switchyard equipment installations like- Isolator, CVT, BPI, and CT & PT.
  • Coordinated overall Switchyard earthing, enhancing system reliability and safety.
  • Conducted 6.6 kV & 415 V (PCC / MCC / Small Power) panel erection and pre-commissioning activities, facilitating seamless project integration.

Education

Bachelor of Electrical Engineering - BE ELECTRICAL

MGVIMT | DELHI | 12-2016

DIPLOMA ELECTRICAL - Electrical Engineering

BEAWAR POLYTECHNIC COLLAGE | BEAWAR RJ | 10-2013

Skills

Electrical engineering expertise
Electrical load analysis
Medium-voltage and low-voltage cable sizing
Preventive and predictive maintenance
Breakdown analysis and maintenance
Plant and utility maintenance
Project engineering and coordination
Construction project coordination
Cost estimation techniques
Electrical project planning
Safety compliance
MCC
DC
Cables
Line
SLD
Load Flow
Sizing
Analyzer

Personal Information

Title: Sr. Project consultant

Certification

  • Best Engineer of the year 2024 (Benzochem Industries Pvt Ltd)
  • Best Engineer of the Year 2022 ( Abb India Ltd.)
  • Best safety performer of the year 2022 by MS CHOLA (Abb India Ltd)

Timeline

Sr. Project Consultant Electrical

M/s Tata Consulting Engineers Pvt Ltd
03.2026 - CurrentRead More

Sr. Executive Electrical & Maintenance

M/s Benzochem Industries Pvt, Ltd
09.2022 - 02.2026Read More

Site Engineer

M/s ABB India Ltd
02.2018 - 08.2022Read More

Site Engineer

M/s HINDUSTHAN ZINC
02.2018 - 12.2020Read More

RIL, DTA CPP Jamnagar
01.2015 - 05.2016Read More

Engineer

M/s Shri Magta Engineers
11.2013 - 08.2014Read More

MGVIMT

Bachelor of Electrical Engineering from BE ELECTRICAL
Read More

BEAWAR POLYTECHNIC COLLAGE

DIPLOMA ELECTRICAL from Electrical Engineering
Read More
Gopal singh