Energetic and versatile problem-solver with 15 years of Experience in Construction of various Projects like Railways , Underground & Elevated Structures, Hydro Power Projects, with a genuine interest in Execution with Best Quality practice, Occupational health, safety & Environment standards for the project. Keen to work for a dynamic organization in a stimulating work environment that could utilize my experience and education to the maximum extent.
Overview
15
15
years of professional experience
1
1
Certification
Work History
Assistant Construction Manager
Larsen & Toubro Ltd
10.2019 - Current
Project: Dedicated freight corridor construction
Project Scope: Civil Build and track works for 289 km double railway line from iqbalgarh to Vadodara section. Contract value -4744 crores
Section In-charge for 19Kms Stretch
End to End Responsibility for P-Way Works, IMB, MJB, MIB, RUB, PS, VIADUCT Progress, Safety & Quality
Preparation of Monthly, weekly & Micro Program based on the master program to fit with the Schedule
Allocation, optimization, Utilization & Sharing of resource
Liasoning with client, Consultant, traffic authorities & Public for approval, Permission & smooth Process of work
Preparation of Method Statement, work breakdown structure & Safe work Method, Participation for Risk Assessment preparation of all activities
Conducting daily to daily review with sub-ordinate team members and sharing & advising timely completion and saving overall cost
Managed project documentation, maintaining accurate records for audits and future reference.
Reviewed drawings and specifications, identifying any discrepancies or potential issues before construction began.
All execution work at site using proper method statement and ensuring quality is maintained at site.
Monitored subcontractor operations and applied effective time, resource, and money management strategies to delivery under-budget project completion.
Led weekly production and operations contractor meetings, facilitating stronger communication, and helping to resolve critical issues.
Monitored construction sites for compliance with safety regulations and adherence to standards.
Conducted regular quality control checks throughout the construction process to ensure a high level of craftsmanship was maintained at all times.
Developed strong relationships with clients by delivering excellent customer service during construction projects.
Contributed to successful project completion by monitoring progress, resolving issues, and providing timely updates to senior management.
Senior Engineer
L&T Constructions Ltd (SBHEP PROJECT 3*33MW)
01.2013 - 10.2019
Senior Engineer for construction of Powerhouse Complex
(Auxiliary buildings, Machine Hall, Tail Bay, Penstock Tunnel, Switch Yard, Protection Wall, River Diversion and dredging)
Preparation of Micro Level Realistic Program to fit the master schedule, daily follow up & adherences to the Commitment
Resources requirements are planned to optimize from the existing
Responsible for Project Commitments in powerhouse for Physical Completion, Quality acceptance, Cost Conscious and Safety adherences
Preparation of Work Method Statements and Logistics plan in coordination with Planning Department for Powerhouse construction
Co-ordination with client, consultant and subcontractors and interface with other agencies
Collecting and checking of all architectural & structural Drawings from Consultants
Planning of manpower requirement and man-hour estimation
Preparing Client and sub-contractor bills
Preparing and submission and validation of Bulk material reconciliation
Execution of all structure work
Execution of open Excavation by drilling and blasting method and tunneling of 1.8Km by manual drill and blasting
Executed machine hall-portion with high accuracy of 3 turbine units
Finishing of architectural works in powerhouse
Executed of Switched yard foundation of 448 towers
The Big restoration work completed in this project after 2013 kedarnath flood.
Junior Engineer
L&T Constructions Ltd (SrinagarHEP 4*82.5MW)
06.2009 - 12.2012
Junior Engineer for Construction for Powerplant Complex and Fore bay intake
Planning of manpower requirement and man-hour estimation
Directing work like Installation of foundation, fabrication of shutter, rebar work
Preparation of BBS and validation from clients
Execution of various steel Reinforcement work in RCC Structures
Collecting and checking of all architectural & structural Drawings from Consultants
Co-ordination with client, consultant and subcontractors
Preparing Bills for client and Subcontractors
Coordination with client and ensure them that Quality procedures are being implemented in site according to project specification
Observed and practiced quality assurance and safety within project site
Fore bay intake structure: Planning, Monitoring, Quantity Surveying, Monthly and weekly Program & progress report, Preparation of monthly S/C Bill, Client certification and Execution of following works (Foundation to handover of all buildings)