Summary
Overview
Work History
Education
Skills
Certification
Personal Information
Father's Name
Timeline
Generic

GOPI KISAN GOPALA

Maintenance Assistant manager ( Automation )
Bokaro Steel City

Summary

Results-driven Assistant Manager with 8+ years' experience in Maintenance Engineering, Industrial Automation, and Project Management within automotive and manufacturing sectors. Skilled in PLC programming (Mitsubishi FX/Q), SCADA, HMI design, and robotics integration (FANUC, Motoman, Panasonic). Expert in TPM, RCM, and Predictive Maintenance using tools like vibration analysis, thermography, and oil testing. Proficient in industrial protocols (CC-Link, DeviceNet, Profibus, Modbus, Ethernet/IP) and safety PLC logic. Strong track record in improving MTTR, MTBF, OEE, and executing RCFA to boost plant reliability. Well-versed in IATF 16949, ISO 9001/14001/45001, audits, and energy management systems with successful energy-saving initiatives.

Overview

8
8
years of professional experience
6042
6042
years of post-secondary education
1
1
Certification
2
2
Languages

Work History

Maintenance Assistant Manager (Automation)

Moonlight Auto Private Limited
12.2020 - Current

1. Mechanical Maintenance 2. Electrical & Automation Systems 3. Instrumentation & Control 4. Utility Management 5. CMMS & Documentation 6. Safety & Compliance 7. Team & Vendor Management 8. Continuous Improvement & TPM

  • Executed preventive and predictive maintenance plans for 120+ machines including CNCs, SPM , conveyors, hydraulic presses, and robotic arms
  • Performed root cause analysis (RCA) of mechanical failures; successfully reduced unplanned downtime
  • Managed critical spares inventory using ABC analysis, ensuring zero production loss due to part unavailability.
  • Hands-on experience with alignment, balancing, bearing replacement, and overhauling of pumps and gearboxes.
  • Led troubleshooting and maintenance of LT panels, VFDs, motors, and control circuits (star-delta, DOL).
  • Diagnosed faults in Siemens and Allen-Bradley PLCs using ladder logic and HMI interfaces; improved fault resolution time by 25%.
  • Implemented SCADA-based machine monitoring system across 3 production lines.
  • Conducted insulation resistance testing (IR), earth resistance testing, and relay coordination checks as part of annual shutdowns.
  • Supervised calibration of sensors (pressure, level, temperature) using standard equipment traceable to NABL.
  • Installed and configured analog & digital instrumentation loops, performing loop checking and commissioning.
  • Supported implementation of energy meters and data loggers for consumption monitoring and reporting.
  • Oversaw operation and maintenance of utility systems:
    Air compressors (Atlas Copco)
    DG Sets (Kirloskar 750 kVA)
    HVAC chillers
  • Implemented energy conservation measures, leading to a 12% reduction in utility cost through load optimization and VFD tuning.
  • Maintained detailed breakdown history and preventive logs using SAP PM module.
  • Generated daily, monthly, and annual MIS reports including KPIs like MTBF, MTTR, and equipment availability.
  • Prepared and maintained Standard Operating Procedures (SOPs), work instructions, and maintenance checklists.
  • Conducted toolbox talks and regular safety audits in compliance with ISO 45001 and Factory Act.
  • Implemented LOTO procedures, hot work permits, and confined space safety protocols.
  • Supported internal and external audits (PESO, Electrical Inspector, ISO, IATF 16949).
  • Managed a team of 18 technicians and 4 engineers across three shifts.
  • Coordinated with OEM vendors for AMC, spare supply, and warranty claims.
  • Played a key role in new machine commissioning projects, including layout planning, foundation, and electrical wiring.
  • Implemented Kaizens and TPM Pillars (Planned Maintenance, Autonomous Maintenance) – improved OEE by 7% across two critical lines.
  • Led 5S implementation in maintenance store and machine areas, resulting in audit score improvement from 62% to 91%.

Team Leader – Automation & Maintenance

Absolute Engineering & Robotics System
07.2017 - 08.2020
  • Managed end-to-end automation projects including PLC programming, HMI design, robotic cell commissioning, and field instrumentation integration.
  • Executed robot welding automation projects with FANUC, Motoman, and Panasonic robots, ensuring seamless integration with Mitsubishi PLCs and safety systems.
  • Developed servo motor parameterization and implemented precise motion control algorithms for specialized manufacturing equipment.
  • Performed troubleshooting using advanced diagnostic tools including oscilloscopes, logic analyzers, and software debuggers to minimize system downtime.
  • Trained engineering teams on PLC programming standards, safety compliance, and best practices in maintenance of automated systems.

Education

B.Tech - Electrical & Electronics Engineering

Nagpur University
07-2017

Diploma - Electrical Engineering

MSBTE
07-2014

Secondary School Certificate -

SSVM
05-2010

Skills

Total productive maintenance

Certification

Integrated Management System (ISO 9001:2015, ISO 14001:2015, ISO 45001:2018), Quality Austria Central Asia Pvt Ltd, QACA/TRG/IMS-IA/01-2023/2257

Personal Information

  • Date of Birth: 12/26/94
  • Marital Status: Unmarried

Father's Name

Sunil Kumar

Timeline

Maintenance Assistant Manager (Automation)

Moonlight Auto Private Limited
12.2020 - Current

Team Leader – Automation & Maintenance

Absolute Engineering & Robotics System
07.2017 - 08.2020

B.Tech - Electrical & Electronics Engineering

Nagpur University

Diploma - Electrical Engineering

MSBTE

Secondary School Certificate -

SSVM
GOPI KISAN GOPALAMaintenance Assistant manager ( Automation )