Summary
Overview
Work History
Education
Skills
Languages
Disclaimer
Personal Information
Timeline
Govindaraj Thirupathy

Govindaraj Thirupathy

Summary

Intend to structure my growth in pace with ever changing corporate environment. Make my learning curve to move in linear fashion along with growth of my functional skills coupled with overall personality development in order to face the challenging time ahead.

20 Years Electrical and Electronics Engineering with 20 Years' Experience in Erection, Testing and Commissioning of Electrical Entrapment's in Steel Plant Thermal Power Plant. 400/220KV Sub Station , Wind Mill Generation and 220KV Transmission substation. Airport Sub-Stations Hot line Maintenance of20KV Transmission line and switch yard 33KV and 11KV indoor substation and switch yard.

Overview

22
22
years of professional experience

Work History

Manager

JINDAL STEEL &POWER LTD
05.2017 - Current
  • Maintenance of HT Equipment's 33KV/11KV/6.6KV in EPS (Electrical Power system)-Steel area including SMS, LRF, SAF, Plate Mill, SPM, Rail Mill, Oxygen Plant HT Equipment's and Transformers
  • PM Plan as per check list
  • Maintain HT equipment's spare trough Creating PR and SR through SAP PM Module
  • Minimizing Breakdown through Preventive Maintenance
  • SAF Furnace Transformers Dismantling and over hauling, Erection and commissioning
  • Sinter plant WGF Transformer Dismantling and erection of new Transformer
  • Preparation of JSA and SOP for New Job and Project execution and maintenance work
  • Oversee the installation, commissioning, and testing of electrical systems and equipment
  • Supervise subcontractors and ensure adherence to project timelines and quality standards
  • Inspect and ensure the proper functioning of electrical equipment during and after installation
  • Witness and certify tests for electrical equipment, including transformers, switch-gear, motors, and cables
  • Ensure testing activities comply with industry standards and project specifications
  • Managed and motivated employees to be productive and engaged in work.
  • Accomplished multiple tasks within established timeframes.
  • Oversaw inventory management, optimizing stock levels, and reducing waste.
  • Managed budget allocations to prioritize spending on high-impact projects, optimizing resource utilization.
  • Maintained professional, organized, and safe environment for employees and patrons.
  • Cross-trained existing employees to maximize team agility and performance.
  • Improved safety procedures to create safe working conditions for workers.
  • Managed budgets effectively, ensuring optimal financial performance while investing in necessary resources for business growth.
  • Maximized performance by monitoring daily activities and mentoring team members.

Dy.Manager

JINDAL STEEL &POWER LTD
04.2003 - 04.2017
  • Working as Operation & Maintenance of MRSS 220KV switch yard, Transmission line maintenance activity
  • Execution of operation & maintenance work
  • Hot line Maintenance monitoring the Preparation schedule, Documents, and Work man safety
  • Hot line String Replacement of Failure insulators and tension hardware
  • PID and Thermography, Hot line washing of insulator
  • Men and material planning and control for job execution
  • TPM and OPL, Kaizen data updating
  • Created and maintained a strong team culture that promoted high levels of collaboration, employee satisfaction, and overall performance.
  • Mentored junior staff members on best practices for project management and team collaboration skills, fostering a supportive work environment.
  • Supervised day-to-day operations to meet performance, quality and service expectations.

Asst.Manager

JINDAL STEEL &POWER LTD
01.2010 - 04.2013
  • 220KV Transmission line cold line and HOT Line Maintenance
  • 132KV Transmission line project, 220KV Transmission line project execution
  • 33KV transmission line operation and maintenance work
  • 33KV and 11KV indoor and outdoor substation operation and maintenance
  • 33KV Project executions
  • Technical specification finalization for Transformer and HT switch board
  • Developed strong working relationships with staff, fostering a positive work environment.
  • Monitored cash intake and deposit records, increasing accuracy, and reducing discrepancies.
  • Oversaw daily cash reconciliations, ensuring accurate financial reporting and minimizing discrepancies.
  • Improved customer satisfaction by addressing and resolving complaints promptly.
  • Completed regular inventory counts to verify stock levels, address discrepancies, and forecast future needs.
  • Managed inventory levels to minimize stockouts while reducing overhead costs.

Sr.Engineer (Electrical)

LARSEN &TOUBRO LIMITED
10.2007 - 12.2009
  • Worked as Site Incharge for Rural Electrification works in shimoga district of Karnataka state on turnkey basis under RGGVY- Scheme For Rural Electricity Infrastructure and household Electrification for Mangalore Electricity Supply Company Limited Mangalore (MESCOM)
  • Execution of survey works
  • Preparation estimates and proposed infrastructure of materials of electrical equipment's

Electrical Engineer (Projects)

GSA Plant Engineering Services Pvt Ltd
01.2007 - 09.2007
  • Worked as an Execution Engineer in L&T Construction H' Blast Furnace Project Main Electrical Building in TATA Iron Steel Company in Jamshedpur, Jharkhand
  • Execution of work, monitoring the progress, Preparation schedule, Documents, and Work man safety
  • Men and material planning and control for the project execution
  • Key person at site, for the project updated status, for both customer as well for my higher authority
  • HT Panel, PCC & MCC Panels Erection
  • Transformer Installation
  • Fabrication & Erection of Tray
  • Cable laying (Power, Control & Instrument)
  • HT, LT Motors Installation
  • Plate& Pipe Earthing

Electrical Engineer (Testing&Commissioning)

Power Process Engineering (I) Pvt Ltd
05.2003 - 12.2006
  • Projects Carried Out: a) Client: Airport Authority of India, Chennai Airport, Chennai
  • Project: Testing & commissioning of 33KV / 3.3KV, 3.3KV/415V panels and in NIDT Power house, Integrated Cargo power House
  • Duration: July 2003 to February 2004
  • B) Client: Chennai Container Terminal, Chennai Port-Trust Harbour, Chennai
  • Project: Testing & commissioning of 33KV / 3.3KV, 3.3KV/415V panels and Other Electrical equipments
  • Duration: March 2004 to July 2004
  • C) Client: NTPC,Ramagundam,A.P.
  • Project: Thermal Power Plant Erection, Testing & commissioning of 6.6KV / 415 V panels and Other Electrical equipments
  • Duration: August 2004 to January 2005
  • D) Client: Vestas Wind Energy Ltd, Chennai
  • Project: Erection, Testing & commissioning of 33KV / 66KV wind mill generating station, Chidradurga, Karnataka
  • Duration: February 2005 to August 2005
  • E) Client: Durgapur project Ltd, Durgapur, and West Bengal
  • Project: Thermal Power Plant (7th Unit) Erection, Testing & commissioning of 6.6KV / 415 V panels and Other Electrical equipment's
  • Duration: September 2005 to May 2006
  • F) Client: Sandaldhi Thermal Power Station, Sandaldhi, West Bengal
  • Project: Thermal Power Plant Erection, Testing & commissioning of 6.6KV / 415 V panels and Other Electrical equipment's
  • Duration: June 2006 to October 2006
  • Testing & Commissioning: Calibration of Relays
  • Testing of all type of Circuit Breakers
  • Testing of CT's, PT's
  • Transformer Testing
  • 6.6KV / 415 V HT, LT Panel Testing & commissioning
  • 33KV/66KV Windmill generating station Testing & commissioning
  • Testing of Lightning Arrester, Isolators
  • Earth Resistance measurements

Education

Bachelor of Electrical & Electronics Engineering -

University of Madras
04.2003
  • First class
  • GPA: 67.1

H.S.C -

State Education Board of Tamil Nadu
03.1999
  • First class
  • GPA: 67.4

S.S.L.C -

State Education Board of Tamil Nadu
04.1997
  • First class
  • GPA: 68.0

Skills

  • Time management
  • Decision-making
  • Team leadership
  • Policy and procedure development
  • Inventory management

Languages

English
Hindi
Tamil
Kannada

Disclaimer

I hereby, acknowledge that all information I have furnished above are all true to the best of my knowledge and can produce it whenever needed.

Personal Information

  • Passport Number: M0701508
  • Passport Date Of Issue: 08/01/14
  • Passport Place Of Issue: Chennai
  • Father's Name: G. Tirupathy
  • Date of Birth: 06/05/80
  • Nationality: Indian / Hindu
  • Marital Status: Married

Timeline

Manager - JINDAL STEEL &POWER LTD
05.2017 - Current
Asst.Manager - JINDAL STEEL &POWER LTD
01.2010 - 04.2013
Sr.Engineer (Electrical) - LARSEN &TOUBRO LIMITED
10.2007 - 12.2009
Electrical Engineer (Projects) - GSA Plant Engineering Services Pvt Ltd
01.2007 - 09.2007
Electrical Engineer (Testing&Commissioning) - Power Process Engineering (I) Pvt Ltd
05.2003 - 12.2006
Dy.Manager - JINDAL STEEL &POWER LTD
04.2003 - 04.2017
State Education Board of Tamil Nadu - H.S.C,
State Education Board of Tamil Nadu - S.S.L.C,
University of Madras - Bachelor of Electrical & Electronics Engineering,
Govindaraj Thirupathy