Summary
Overview
Work History
Education
Skills
Languages
Timeline
Generic
Gurpreet Korotania

Gurpreet Korotania

PHAGWARA

Summary

Pipeline pigging & testing, nitrogen purging & testing systems &

Pipelines using vaporizers & HP converters (90k, 180k )

Air drying & vauum drying.

Performs equipment rig-up and rig-down on at worksite and prepares

equipment for performance of job

Responsible for safe operation of low- pressure/high-pressure pumps, air

compressors, Vacuum units.

Lube oil flashing

Preparation of equipment for the next job.

Performs necessary calculations at the worksite as needed.

Promotes and takes an active part in quality improvement processes

Overview

13
13
years of professional experience

Work History

Sr Operator/Multi Skilled Technician

HALIBURTON & ENERMECH
Doha
06.2012 - 12.2024
  • 2024
  • Leak testing Shut down NOC F Location
  • 2024
  • Leak testing Shut down NOC E Location
  • 2024
  • Pneumatic Testing Train 7&6 comn Shutdown Qatar Energy LNG
  • 2023
  • Leak testing Shut down NOC G Location
  • 2023
  • Leak testing PS1
  • 2023
  • QE/Saipem hydro testing PS1
  • 2023
  • Qatar Energy North Pneumatic testing
  • 2022
  • Leak Testing Noc A Location Shutdown
  • 2022
  • Air Blasting NOC E & B Location Qatar
  • 2021
  • Leak testing NOC Qatar
  • 2020
  • Leak testing NOC Qatar
  • 2019
  • Vacuum drying QP Qatar
  • 2019
  • Leak Testing NOC Qatar

  • 2019 Leak Testing Brouge ADMA Abu Dhabi
  • 2018 14” pipeline pigging Sarb project 4 (Abu Dhabi)
  • 2018 Leak test WHT-1 & 2 Nasr Field HHI/ADNOC(Abu Dhabi)
  • 2018 Helium leak test Adnoc/Hyundai (Abu Dhabi)
  • 2017 Pneumatic test Qatar Gas
  • 2017 Oxy Helium leak test
  • 2017 QP Well Batch Inhibition (Dukhan)
  • 2017 Oxy PS1 nitrogen purging
  • 2017 Ras gas Pneumatic testing
  • 2017 N2 pumping Arab D Shut down Dukhan
  • 2016 Vacuum Drying Black cat Wakara
  • 2016 Hydrotest 30" Spool Galfar
  • 2016 QP30" Pre-commissioning pipeline Black cat
  • 2016 Pneumatic testing Ras Gas RLIC
  • 2016 QP Gas Well Batch inhibition Dukhan
  • 2016 Pipeline pre-commissioning Qcon/Rasgas
  • 2016 Panorama Pipeline Dukhan 2016
  • 2016 Total Offshore 12” line Hydro Testing
  • 2016 QP Black cat pipeline pre-commissioning
  • 2016 Ras Gas pipeline pre-commissioning
  • 2016 QP Dukan Gas Well Batch inhibition
  • 2015 Gasal N2 & O2 pipeline Pre-commissioning
  • 2015 JGC Barzan Degreasing
  • 2015 JGC Barzan Hydro-Testing
  • 2015 QP, Dukhan , Arab D & Khuff Well batch inhibition
  • 2015 QP, Dukhan – 16” to 36” pipelines – pigging, batch inhibition
  • 2015 Dopet – Valve testing
  • 2015 Ras Gas – Pneumatic Leak Testing.
  • 2014. Lube oil flushing Adnoc v. Vessel Qatar
  • 2014 JGC – HLD & Sensitive leak Testing.
  • 2014 Qatar Gas, Offshore – Flow Assurance Chemical Transfer.
  • 2014 Occidental – PS1 N2 Shutdown
  • 2014 QP, MIC – Vacuum Drying
  • 2014 QP, Dukhan – 16” to 36” pipelines – pigging, batch inhibition
  • 2014 Qatar Gas – Pneumatic Leak Testing
  • 2014 QP, Dukhan – 16” to 36” pipelines – pigging, batch inhibition
  • 2014 QP,Blackcat – Pre-Commissioning
  • 2013 QP, Dukhan – 16” to 36” pipelines – pigging, batch inhibition
  • 2013 Gas, Offshore – Flow Assurance Chemical Transfer.
  • 2013 JGC – Pneumatic Testing
  • 2013 QP, Blackcat - Pre-Commissioning
  • 2012 QP,Blackcat – Pre-Commissioning
  • 2012 QP, Panorama – Pre-Commissioning
  • 2012 QP, CCC – Pre-Commissioning

Education

Bachelor of Arts -

Guru Nanak College
Phagwara
03-2005

Skills

  • HELIUM LEAK TESTING
  • NITROGEN OPERATIONS
  • PIPELINE PIGGING
  • AIR BLASTING
  • VACUUM DRYING
  • HYDRO-TESTING
  • LUBE OIL FLUSHING

Languages

Punjabi
First Language
English
Advanced
C1
Hindi
Advanced
C1

Timeline

Sr Operator/Multi Skilled Technician

HALIBURTON & ENERMECH
06.2012 - 12.2024

Bachelor of Arts -

Guru Nanak College
Gurpreet Korotania