Summary
Overview
Work History
Education
Skills
Projects
Timeline
Generic
Gurvinder Singh

Gurvinder Singh

Kharar

Summary

Dynamic MEP Engineer with a proven track record at KCB Infra Hlp Group, excelling in HVAC systems and project management. Spearheaded operational improvements, achieving significant cost savings while ensuring compliance with safety protocols. Adept at vendor management and problem-solving, driving efficiency and quality in all projects.

Overview

16
16
years of professional experience

Work History

Mep Engineer

KCB Infra Hlp Group
Mohali
06.2024 - Current
  • Supporting the team for the transition period for equipment operations and optimization initiatives.
  • Implementation of safety and operational protocols in alignment with approved standards.
  • Managed equipment’s records and oversaw execution as per drawing at fit outs.
  • Audit and inspection fit outs for Mep services executed by the fit out as per Mall terms.
  • Ensured efficient operations and conducted mechanical and electrical equipment including HVAC, HT, LT systems, water treatment plants, and diesel generator sets.
  • Installed Remote Emergency Control Devices (RECD) for diesel generator systems for operations.
  • Installation of HT panels and transformer in Lt room.

Mep Engineer

Chandigarh University
Mohali
06.2024 - 06.2025
  • Managed equipment records and oversaw operational maintenance for optimized resource utilization for 16 Hostels.
  • Engaged with cross-functional teams to support cost-effective projects.
  • Provided supervision to guarantee sustainability, efficiency, and effectiveness of operational processes.
  • Associated with various new technologies for implementation as per the requirements.
  • Commissioned the 3350 tr Water chiller.
  • Taking care of Operation & Maintanence of Vrfs Ductables, Airwashers and Scrubbers.

Mep Engineer

Aeon Systems
Rajpura
04.2023 - 05.2024
  • Developed and implemented safety plans on-site, ensuring compliance with approved protocols.
  • Ensured installation of mechanical and electrical equipment for HVAC systems, water treatment plants, diesel generator sets, and effluent plants as per client's specifications.
  • Took responsibility for motivating and leading a team, defining timelines, and quality service.
  • Successfully installed the 1275 Tr water chiller with PHE, Dosing of chemicals, FA & PA system and Building Fire system.
  • Bluestar Dealer
  • PROJECT

MANAGER Service & PROJECTS

Ace Cooling Solutions
02.2010 - 09.2022
  • Planning and implemented to teams one day prior for next day work and material procurement.
  • Manage Service teams for sites to give timely services.
  • Field visits to resolve the escalated complaints.
  • Ensured utilities were maintained for 24x7 operations.
  • Implemented operational improvements resulting in cost savings of over INR .5 million, thereby improving profit margins.
  • Was responsible for overseeing Building maintenance and conducting regular audits.
  • Developed and implemented maintenance strategies to enhance reliability and longevity of equipment’s.
  • Maintained records of maintenance activities, costs, and performance to track progress and identifying areas for improvement.
  • Projects which commissioned: Sainik School Auditorium karnal 110 Tr Ductables, SGPC Ghanta Ghar Fasad 270 HP Toshiba VRF, NABARD Sec 34 Chd 400 HP Carrier VRF, Tau Devi Lal Indoor Stadium 370 HP Carrier VRF, Emaar India Club House Mohali 290 HP Toshina VRF, Reliance Smart Points, Trends, Smart stores from execution to billing in North India.
  • Carrier WCCD Dealer
  • PROJECT

Education

Diploma in Electrical Engineering -

Sus Polytechnic Tangori (PTU)
Tangori
01.2008

10+2 -

C.B.S.E.
CHD
01.2006

Matriculation -

NOC
Delhi
01.2002

Skills

  • Facility Management
  • HVAC systems
  • Equipment maintenance
  • Cost analysis
  • Project Management
  • Vendor Management
  • Safety and Compliance
  • Quality assurance
  • Safety protocols
  • Problem solving
  • Equipment selection
  • MEP coordination
  • AutoCAD proficiency

Projects

Sainik School Auditorium Karnal 110 Tr Ductables. SGPC Ghanta Ghar Fasad 270 HP Toshiba VRF. NABARD Sec 34 Chd 400 HP Carrier VRF. Tau Devi Lal Indoor Stadium 370 HP Carrier VRF. Emaar India Club House Mohali 290 HP Toshina VRF. Reliance Smart Points, Trends, Smart stores from execution to billing in North India.

Timeline

Mep Engineer

KCB Infra Hlp Group
06.2024 - Current

Mep Engineer

Chandigarh University
06.2024 - 06.2025

Mep Engineer

Aeon Systems
04.2023 - 05.2024

MANAGER Service & PROJECTS

Ace Cooling Solutions
02.2010 - 09.2022

Diploma in Electrical Engineering -

Sus Polytechnic Tangori (PTU)

10+2 -

C.B.S.E.

Matriculation -

NOC
Gurvinder Singh