Hari Charan kotipalli

Civil Engineer
Visakhapatnam,Andhra Pradesh

Summary

Dynamic Project Manager with a proven experience over 15 years, in A.E.C, Buildings and Structures,Roads and other civil works. Adept at planning, directing and maintaining continuous operations in various departments. Excelled in delivering complex industrial projects by mastering cost control and resource allocation, ensuring high-quality results. Skilled in fostering client relations and managing budgets, Excels through mentoring, training and empowering team to excel in performance to achieve project goals efficiently.

Overview

1824
1824
years of professional experience

Work History

Project Manager

Powertech Industrial Services
Visakhapatnam
11.201 - Current
  • Name of the Project : Special Repair to Building No. P-17, P-55, P-107, P-113, P-122, P-122A and P-88 at Navy children school.
  • Total Value : 01 Crore.
  • Key Features of the Project :
  • Renovation of the entire buildings by special repairs like chemical grouting, Roof Treatment, Anti Termite treatment, Plastering, Replacing the old tiles, Granite, Marble, Electrical, Plumbing and Painting works,
  • Name of the Project: : PROVISION OF MI ROOM, MT WORKSHOP, FACTORY (ENGINEERING WORKSHOP), INDUSTRIAL CANTEEN AND ASSOCIATED FACILITIES AT NAD BHEEMUNIPATNAM.
  • Total Value : 10 Crore.
  • Key Features of the Project: Construction of 12 No's Buildings and other associated facilities like roads and drains Internal and external Electrification, Plumbing works, Fire Fighting and fire alarm works, construction of Electrical substation.
  • Name of the Project : Augmentation of Visakhapatnam Diesel Loco Shed, East Coast Railway for homing of 100 HHP Locomotives at Visakhapatnam.
  • Total Value : 78 Crore.
  • Key Features of the Project :
  • Name of the Project : Construction of PEB Shed, Arrangement, Drainage, Sewerage, Road Works, Track Works in Connection with Construction of Main Line EMU Car Shed (Phase-2) At Khurda Road, Odisha (India).
  • Total Value : 60 Crore.
  • Key Features of the Project :
  • Name of the Project : Composite works (Civil, Electrical, Mechanical), involving Improvement, augmentation & replacement of old Infrastructure electrification and illumination works, procurement and commissioning of specified Mechanical Machineries and Plant at CRW Mancheshwar for POH of LHB coaches.
  • Total Value : 58 Crore.
  • Key Features of the Project : Construction of 2 No's Structural Sheds (100 Mts x 20 Mts ) For POH activities of Memu Coaches, Construction of 2 No's Structural Sheds (100 Mts x 15 Mts ) For H.T testing bay and other activities, Construction of 2 storied building (100 Mts x 20 Mts) and other related works Which includes Roads, Drains,Internal and external electrification works and procurement of Machinary and plants.
  • Name of the Project : Construction of POH shop for MEMU Coaches at Carriage Repair Workshop Mancheswar (Phase-1).
  • Total Value : 38 Crore.
  • Key Features of the Project : Construction of 2 No's Structural Sheds (100 Mts x 20 Mts ) For POH activities of Memu Coaches, Construction of 2 No's Structural Sheds (100 Mts x 15 Mts ) For H.T testing bay and other activities, Construction of 2 storied building (100 Mts x 20 Mts) and other related works Which includes Roads, Drains,Internal and external electrification works and procurement of Machinary and plants.
  • Responsibilities :
  • Successfully managed multiple projects simultaneously by prioritizing tasks according to urgency, resource availability, and alignment with organizational goals.
  • Identifing comprehensive project plans and resources required to meet project timelines, milestones, and budget requirements, ensuring timely delivery with accurate results to achieve project goals and objectives.
  • Planned, designed, and scheduled phases for large projects.
  • Maintaining client relationships,to meet the project expectations and smooth work progress.
  • Reduceing the project costs by negotiating with suppliers, contractors and optimizing resource allocation.
  • Established effective communication among team members for enhanced collaboration and successful project completion.
  • Managed multiple projects from procurement to commission.

Deputy Manager

Hindustan Shipyard Ltd
02.2013 - 06.2016
  • Name of the Project : Replacement of Roof with galvalume Roofing Sheets and other connected works in P.F Shop, General stores and Dry dock.
  • Total Value : 4.14 Crore.
  • Name of the Project : Replacement of Roof with galvalume Roofing Sheets and other connected works in Hull Shops Bay No.s 1,2,3 & 4.
  • Total Value : 3.52 Crore.
  • Name of the Project : Replacement of Roof with galvalume Roofing Sheets and other connected works (Part C).
  • Total Value : 3.68 Crore.
  • Name of the Project : Modernization of Design and Drawing office
  • Total Value : 3.38 Crore.
  • Name of the Project : Renovation of Accounts and Purchase Department.
  • Total Value : 3.12 Crore.


Design Engineer (A.E.C)

INDPRO
05.2011 - 01.2013

2013- Ecophon- Sweden.

Ceiling details- Task was to create families(non parametric families) in Revit 2012 according to the

2d AutoCAD details. (600 details)

Role: Importing AutoCAD details to Revit and creating non parametric families with the work flow

given.

2013- Rubyangar- Sweden.

Reinforcement modelling of villas in Revit 2012 as per the given reinforcement details.

Role: Placing rebars in revit as per the given details.

2012 - 437 BRANDSTATION, Sweden.

Basic task was to extract shop drawings. The task was to model the structure in Tekla, by using the

Revit model. The Project was quite challenging as the only input we had was Revit model,

so indeed learning experience.

Role: 3D modeling, Shop drawings.

2012 - 232233 NGODWANA, South Africa.

Basic task was to extract shop drawings for fabricators by developing a 3D model based on PDMS

model. Since this was a structure which was getting renovated, a part of modelling was executed by

a visual of site snaps, which led to lot of complications. This was indeed a learning experience.

Role: 3D modelling, Shop drawings.

2011 - Ikea Almhult-Stal- 229313A, Sweden (Onsite).

Basic task was to extract shop drawings for fabricators by developing a 3D model based on 2D

drawings.

Role: Structural Detailer using Tekla Structures.

2011 - Pajala, Sweden (Onsite).

Pajala is a mining project which is divided into Several parts.

Role: I have worked for (229456A-229456B-229456D-229456F),i have worked on the

Basic 3D modeling, connections, shop drawings and reports for procurement.

Graduate Apprentice Trainee

Hindustan Shipyard Ltd
12.2009 - 11.2010
  • Preparation of H.S.L yard layout plan using Auto Cad from the Blue Print drawings.
  • Conducted H.S.L yard ground water survey.
  • Executed maintenance works for jetty and marine structures .

Education

Bachelor of Technology - Civil Engineering (March 2009)

G.M.R.I.T
Rajam

Skills

Project scheduling

Work flow planning

Cost control

Client relations

Document management

Budgeting and forecasting

Vendor sourcing

Team bonding

Resource allocation

Project planning and development

Software

AutoCAD, Tekla, PDMS

Timeline

Deputy Manager

Hindustan Shipyard Ltd
02.2013 - 06.2016

Design Engineer (A.E.C)

INDPRO
05.2011 - 01.2013

Graduate Apprentice Trainee

Hindustan Shipyard Ltd
12.2009 - 11.2010

Bachelor of Technology - Civil Engineering (March 2009)

G.M.R.I.T

Project Manager

Powertech Industrial Services
11.201 - Current
Hari Charan kotipalliCivil Engineer