Having 10+ years experience in Planning and execution in static equipments ( Column, vessels Exchangers ,etc.) and Piping jobs.
Skilled at handling multiple tasks and projects simultaneously in challenging environments with excellent relationship management skills and the ability to relate to people at any level of business and management.
Overview
15
15
years of professional experience
1
1
Certification
Work History
Mechanical Supervisor
M/s. HEISCO - EQUATE
Shuiaba Industrial Area
12.2022 - 02.2023
1. Sea Cooling Water Network Rehabilitation & Ethylene Glycol Unit Turn Around Maintenance
1. 12" WG line Replacement for 70 meters
2. 6" WG line Replacement for 30 meters at critical Location.
Utilized proper tools and materials to adhere to safety guidelines.
Provided emergency response to handle urgent breakdowns.
Created and maintained daily and weekly reports for upper management.
Reported on work progress to manager and incorporated feedback to maintain tight schedules.
Sr. Planning Engineer
M/s. Shilpi Engineering Private Limited, Chennai Petroleum Corporation Limited
Chennai
04.2021 - 12.2022
Plant-201 & 202 (CDU/VDU & MEROX UNIT) Furnaces, Columns & Vessels, Heat Exchangers, Fin Fan Coolers Maintenance, Piping jobs, Re-tubing of Heat Exchangers during Refinery-3 M&I Shutdown 2021 at CPCL-Manali (August 2021 to October 2020)
Replacement of APH 4 Modules from Furnace including Glass type
Removed all 4 modules and again re-fixed new modules.
Removed Stack and Re-fixing of stack also done within period,
Completed job in short period (28Days)
Maintenance of Columns , Vessels ,Drums & Heat Exchangers.
Planning Engineer
M/s, Logos Engineering Private Limited Planning, Chennai Petroleum Corporation Limited
Chennai
12.2011 - 04.2021
Refinery – I Flare Seal pot drum repair works. (2011-2012)
Annual Rate Contract (ARC) for Static Mechanical Maintenance in CPCL (2012 – 2014)
Rerouting of Pipe lines inside Tank-805 dyke to outside dyke for Enabling Tank-626 at CPCL. (2014)
FABRICATION OF UG & AG PIPING WORKS FOR SULPHUR BLOCK OF RESID UPGRADATION (Punj Lloyd) December -2014 to May – 2015 at CPCL.
Repair & Maintenance of Static Equipment & Piping jobs in Plant-78 & 79 during M&I Shut down June – 2015 at CPCL.
Repair & Maintenance of Static Equipment jobs in Ref III during M&I Shut down August – 2015 at CPCL.
AG PIPING WORKS FOR SULPHUR BLOCK OF RESID UPGRADATION (Punj Lloyd) May – 2016 to September-2016 at CPCL.
Maintenance and Piping, Structural replacement jobs in Plant- 74 Shut down at CPCL. (November 2016 to January 2017)
MAINTENANCE JOB IN FURNACE, HEAT EXCHANGERS SD PLANTS 15,17&18. AND PIPING RPLACEMET JOBS IN Pt-15 & 16 (January 2017 to March 2017)
ARC for Mechanical Maintenance Onsite Field works Zone I / REF-I & II (June 2017 to September 2019)
MAINTENANCE JOB IN FURNACE, HEAT EXCHANGERS SD PLANTS 1,2&73 and piping replacement jobs DURING SHORT SHUTDOWN (September 2017)
MAINTENANCE AND PIPING ,STRUCTURAL REPLACEMENT JOBS AT PT 77 COLUMNS,VESSELS & EXCHANGERS DURING M & I SHUTDOWN (October 2017 to January 2018)
MAINTENANCE JOB AT FURNACE, COLUMNS & HEAT EXCHANGERS AND PIPING, STRUCTURAL REPLACEMENT JOBS IN PLANT 13 M&I SD (July 2018 to February 2019)
MAINTENANCE JOB AT FURNACE, COLUMNS & HEAT EXCHANGERS AND PIPING, STRUCTURAL REPLACEMENT JOBS IN PLANT14 M&I SD (October 2018 to November 2018)
ARC for Coating & Wrapping of Underground Pipelines in REF-I & II (January 2019 to April 2021)
Maintenance Jobs in Columns & Vessels in Plants 1, 2, 9, 10 & 12 during Ref-1 M&I Shutdown 2019 (September 2019 to October 2019)
Maintenance Jobs in Plant 1 Furnaces & APH during M&I Shutdown-2019 at CPCL-Manali (September 2019 to October 2019)
Glass APH module # 4 replacement jobs in 1F-01A Crude Heater in Refinery -1 2020 at CPCL-Manali (July 2020 to August 2020)
ENGINEER
M/s.Cethar Limited, EPC Contract
Korba, Chhattisgarh
06.2010 - 06.2011
Aryan Coal Power Plant 600MW X 2 unit in Korba , Chhattisgarh, India.
Captured technical schematics for use in project planning and execution.
Conducted research to test and analyze feasibility, design, operation and performance of equipment, components, and systems.
Wrote, reviewed and edited technical document in accordance with template requirements.
Developed work plans for various personnel roles based on strengths and talents.
Graduate Apprentice Trainee
M/s. BHEL Piping Center
Chennai
06.2009 - 06.2010
Assisting in piping Design for Execution Team
Worked with team members to refine task workflows for greater productivity.
Cleared work sites of hazardous items.
Painted walls, ceilings and other surfaces.
Finished assigned work on schedule with minimal supervision.
Engineer
M/s Plastronica
Chennai
06.2008 - 06.2009
Producing Plastic Components for Automobile Industries- Plastic Injection Molding
Worked effectively in fast-paced environments.
Proved successful working within tight deadlines and a fast-paced environment.
Learned and adapted quickly to new technology and software applications.
Skilled at working independently and collaboratively in a team environment.
Education
B.E - Mechanical Engg
Anna University, VELTECH Engineering College
Chennai, India
2008
H.Sc -
Jay Hind Silver Jubilee Matric.Hr. Sec. School
Chennai, India
2004
Xth -
Sindhi Model Senior Hr. Sec. School
Chennai, India
2002
Skills
QUICK LEARNER
SAFETY PLANNING AND EXECUTION
SCHEDULING TO SUB CONTRACTORS
BILLING
EXECUTING JOB
HANDLING MANPOWER AND RESOURCES
MANAGING CRITICAL ISSUES AT SITE CONDITION WITH CLIENT
Certification
[PRIMAVERA P6 FUNDAMENTALS AND ADVANCED] Training - [MARCH 2022]
Languages
Tamil
Bilingual or Proficient (C2)
English
Advanced (C1)
Hindi
Intermediate (B1)
Timeline
Mechanical Supervisor
M/s. HEISCO - EQUATE
12.2022 - 02.2023
Sr. Planning Engineer
M/s. Shilpi Engineering Private Limited, Chennai Petroleum Corporation Limited
04.2021 - 12.2022
Planning Engineer
M/s, Logos Engineering Private Limited Planning, Chennai Petroleum Corporation Limited