Summary
Overview
Work History
Education
Skills
Interests
Driving licence
Work Availability
Timeline
Generic

HARISH H.S.

Supervisor
Aldur. Chikmagalur,Karnataka

Summary

Seeking a career in an organization having an environment that encourages continuous improvements and exposure to new technologies to achieve personal professional growth along with an organization willing to work as a key player in a challenging and creative environment.

Overview

19
19
years of professional experience
5
5
Languages

Work History

MEP Project, Maintenance & Operation

Al Daqeeq Eng Turning LLC
Sharjah, Dubai
03.2017 - Current

Highlight.

  • Permit processing
  • Baseline schedules creation
  • Site safety coordination
  • Blueprint fluency
  • Power and hand tool operation
  • TBT Briefing
  • Superb management skills
  • Project budgeting
  • Cost control
  • Detail‑oriented

Duties and Responsibilities.

  • Conducts early morning orientation and end of week Process Improvement sessions with the team.
  • Coordinate and work with manager and workers for timely all jobs, maintenance of normal inventory and development of new products.
  • Employ, supervise and train workers.
  • Reviews performance evaluation reports on all team members.
  • Discusses performance evaluation results with all team members.
  • Assists team members on all phone‑in queries on company products and services.
  • Verifies confidential personal information provided by the customer before transferring data to Quality Assurance Officer.
  • Coordinates with Performance Analyst, Quality Assurance and Project Manager on statistics and accuracy ratings generated by the team.
  • Provides training, orientation, and guidance to all team members.
  • Provides technical assistance, such as interpretation of drawings.
  • Assisted Customer Service Agents in handling inbound phone calls and managing chat support services.
  • Assign projects and tasks to employees based on their competencies and specialities.
  • Follow through with competent execution of project plans by providing proper tools and equipment to all construction personnel.
  • Accurately provide status information on project progress to project management.
  • Monitor safety of all construction activities making on‑site personnel safety the top priority.
  • Lead and manage the resolution of all issues during project construction and commissioning phases.
  • Stayed consistent with project schedules and plans for all installations.
  • Submitted project closeout documents by contract.
  • Performed construction site pre‑inspections and coordinated post‑construction audits.
  • Inspected and tested equipment, machinery and components to diagnose issues, recognize defects, and determine appropriate repairs.
  • Implemented preventive maintenance measures to decrease emergent issues.
  • Identified mechanical problems and determined best solutions for correction.
  • Frequently diagnosed mechanical problems and determined how to correct issues.
  • Resolved mechanical issues using both technical and manual skills.
  • Stayed current with latest developments in field through research to recommend new equipment and technologies to clients.
  • Read and interpreted technical drawings and schematics to understand equipment design and proper maintenance.
  • Kept detailed records of repairs and maintenance for reference in future work.
  • Maintained clean and organized work area to easily locate repairing tools and equipment.
  • Followed guidelines while performing maintenance and repairs to prevent work-related injuries.
  • Assembled and disassembled equipment to perform repairs and maintenance.
  • Collaborated with coworkers, discussing assembly, and needed product adjustments.
  • Trained and supervised mechanical engineering technicians in installation and maintenance of equipment.
  • Prepared reports and documentation for mechanical systems and processes.
  • Researched new technologies related to mechanical engineering to improve designs and processes.
  • Conducted root cause analysis to identify source of mechanical system malfunctions.
  • Coordinated installation of systems, machinery, and components.
  • Coordinated with other engineering professionals to coordinate operation of mechanical systems.
  • Operated variety of tools and equipment to complete mechanical repairs.

My Project & Site Details.

  • Mankhool AWR, Hilton Hotel, Supply, Installation, Testing and Commissioning of Hot Water Solar System, Heat Pump, PHEX, Calorifire, Pumps & Pipeline full project, (Client AWR main Contractor Al Naboodah & Trans Gulf).
  • Mankhool AWR, Hilton Hotel, Supply, Installation, Testing and Commissioning of Domestic Wter Cooling System, Chiller, PHEX, Pumps & Pipeline full project, (Client AWR main Contractor Al Naboodah & Trans Gulf).
  • JVC Supply, Installation, Testing and Commissioning of Swimming Pool Hot & Cold Heat pump, Pipeline work Hotel & Hotel Apartments 200 nos, (Client JVC Five Hotel).
  • ASGC Jebel Ali M 51 Labour Accommodation Supply, Installation, Testing and Commissioning of Hot Water Solar System, Calorifire, Pumps & Pipeline work, (Client ASGC).
  • Expo 2020 Canda Pavilion Supply, Installation, Testing and Commissioning of Thermosyphon solar water heater, (Client Amana).
  • Expo 2020 French Pavilion Supply, Installation, Testing and Commissioning of hot & cold Heat pump, Calorifire, (Client JLB).
  • JAFZA Free Zone JLR Auto motive Supply, Installation, Testing and Commissioning of Thermosyphon solar water heater, (Client Amana).
  • MovenPick Resort Al Marjan Island Ras Al Khaima Supply, Installation, Testing and Commissioning of Hot Water Boiler, PHEX, Calorifire, Mixing Valve Station, Pumps & Pipeline work, (Client Horizon Gulf Electromechanical).
  • Abu dhabi Military Camp Supply, Installation, Testing and commissioning of PHEX. APIE brand, (Client NCCC, Tabreed).
  • Premier Inn Hotel DIP Supply, Installation, Testing of Hot Water Old Pipeline Removed and New PPR pipeline work all room and Corridor including Gypsum Painting work, (Client Premier Inn).
  • La Riviera Supply, Installation & Testing of DEWA Water meter PPR Pipeline work & PRV Replacement all Floor & Room inside.
  • Al Ghurair Owner villa, Supply installation and testing and commissioning of Domestic water Pump & Solar pump SS Header Modification Work,(Client Al Ghurair).
  • Champion Cleaners DIP- Dubai, Supply Installation, Testing of Steam pipeline modification, Insulation, Cladding work.
  • NOV Abu dhabi, Supply installation and testing and commissioning of Air compressor pipeline work, (Client NOV).
  • NOV Abu dhabi, Supply installation and testing and commissioning of Autoclave and Steam pipeline work, ( Client NOV).
  • Five palm jumeirah, roof top 300no solar panel and solar pipeline modification & Testing and commissioning work,( Client Five Hotel).
  • Schlumberger Middle East Abu Dhabi, Supply, Installation, Testing and commissioning of Domestic water Cooling system and Solar System,(Client Amana).
  • Madinat Zayed Court Project, Al Dhafra Region,Supply, installation, testing and commissioning of Garbage Chute,(Client NIGM).
  • Seven Palm Hotel & Appartments, The Palm Jumeirah - Dubai, Supply, installation, testing and commissioning of Garbage Chute, Compactor, Cleaning System Brush Unit, Etc, Tower A & Tower B,(Client Airolink Building Contract LLC).
  • Amsaf Mall Jumeirah 3 - Dubai, Supply, Installation, Testing and Commissioning of Hot water Solar System including pipeline with calorifire 6000 ltr 3 no's, (Client Horizon Gulf Electromechanical).
  • Indigo Tower JLT, Supply, installation, Pipeline Modification, Testing and commissioning of Transfer Pump 3 no's.
  • Novotel Sharjah, Lower zone hot water pump and pipeline rectification, modification, Testing and commissioning work roof top to B1, (Client Novotel).
  • Dubai Airport, Ax070, Cuc-3, Cuc-4, Golf 16, Supply & installation and testing and commissioning of 6000 gallon and 3000 gallon Surge vessel 8 nos, (Client AG Engineering).
  • Khazna Data Centre Abu Dhabi, Supply, installation and Insulation, Cladding of Thermal Energy Storage Tank, 16000 ltr 33 no's (Client JLW).
  • Khazna Data Centre Dubai, Supply, installation and Insulation, Cladding of Thermal Energy Storage Tank, 18000 ltr 22 no's (Client JLW).
  • AMC - Maintenance, Boiler Hot Water System, Steven Rock, Novotel Tread Center, Ibis Tread Center, Avani Hotel, Golden Tulip, Siddiqui, Mankhool AWR Hilton, Jvc Five, Etc.
  • Chilled Water pipe all Size Re insulation work Supply & Insulation DIFC Tunnel 4 km, DMCC building, chilled water pipe all Riser, Liberty House DIFC 32 floors, PALACE TOWER 1 ‑ 25th floors, PALACE TOWER 2 ‑ 22nd Floors, SKY GARDEN DIFC 32 Floors, BUSINESS Avenue Deira, AL SAQR Business Tower, SAMA Tower, AZUR Building, Al Manara Tower full building Business bay, One Lake Tower JLT, Etc, Include all building Gypsum and Painting work.

Site Foreman

Badra Engineering
Bangalore
10.2015 - 01.2017
  • Knowledge of applicable safety and code standards specific to the Structures OSHA standards.
  • Coordinated site investigations, documented issues, and escalated to executive teams.
  • Checked equipment to determine if maintenance was required.
  • Verified completed projects met approved time, quality, and cost estimates.
  • Evaluated incoming materials for quality and amounts ordered.
  • Reviewed project details to specify correct materials and equipment for job sites.
  • Handled issues with relative ease by implementing best practices and applying critical thinking skills to find best solutions.
  • Conducted monthly meetings with employees to discuss safety issues, status and development.
  • Inspected completed work to verify quality standards and compliance with criteria.
  • Scheduled job assignments for staff to monitor progress and performance.
  • Trained workers in proper methods, equipment operation and safety procedures.
  • Provides technical assistance, such as interpretation of drawings.
  • Moves materials and equipment to work locations and sets up work sites.
  • Knowledge of applicable emergency operations.
  • Knowledge of supervisory methods, practices, and procedures.

Hard Facing Welder

Professional Hardfacing Services Sdn Bhd
Kulai, Johor
08.2014 - 09.2015
  • Clamped, held, tack-welded, heat-bent and bolted component parts to achieve required configurations and position.
  • Completed welding projects using gas metal arc, flux-cored arc, plasma arc, and shielded metal arc equipment.
  • Operated hoists, cranes, and power tools to dismantle equipment to find and remove defective parts.
  • Maintained, operated, and repaired wide variety of welding equipment.
  • welding (GMAW / MIG), flux cored arc welding (FCAW).
  • Welded joists, columns, and girders into place in accordance with given blueprints.
  • Fabricated metal structures by using welders, cutters, shapers, and various measuring tools.
  • Produced and maintained metal products and structures according to client specifications.
  • SMAW Welding rod E6010, E6013, E7018, E7018‑1, E307‑16, 308L, 312L, 316L, 43 T, NISE, S S 36 L.
  • Plasma cutting.
  • Gouging.
  • Mig wire use. S.S 307 Si, 308L ‑G, 316L Si, 150‑G.
  • GMAW Hard Face wire size 1.6mm to 2.4mm T‑G. Hc 333‑0, FD 42.
  • Used Flux-Cored Wires NIFD.
  • Used gas. Argon. Heavy 53.
  • Used welding machine make Miller and Weltron Auto welding machine.
  • Gas Welding Bracing.

Senior Facility Team Member

Maclellan Integrated Services India Pvt Ltd
Bangalore
06.2009 - 07.2014
  • Maintained productive, efficient approach to all tasks.
  • Trained new team members by relaying information on company procedures and safety requirements.
  • Worked scheduled shifts and remained available to work during coworker absences, holidays, and busy periods.
  • Developed strong cooperative relationships with coworkers and managers.
  • Contributed to team success by completing jobs quickly and accurately.
  • Learned all required tasks quickly to maximize performance.
  • Worked different stations to provide optimal coverage and meet production goals.
  • Maintained overall safe work environment with employee training programs and enforcement of safety procedures.
  • Inspect sites regularly to identify problems and necessary maintenance.
  • Prepare weekly maintenance schedules and allocate work as per forecasted workloads.
  • Coordinate daily cleaning and maintenance activities.
  • Oversee all repairs and ensure that work is completed on time.
  • Maintain all inventory and equipment, and ensure proper storage.
  • Comply with all health and safety regulations and practices on site.
  • Conduct preventative maintenance work.
  • Conduct follow‑ups on all maintenance and repair work.
  • Conduct safety inspections as scheduled.
  • Establish strategies to meet workload demands on time.
  • Preparing Daily Consumption Reports.
  • Preparing and planning Preventive maintenance.
  • Maintaining HSD consumption records &Fo_Oil consumption records.
  • Maintaining Records of Preventive maintenance & Preparing PM schedules.
  • Maintain the Record of Daily Activities.
  • Daily follow‑up the complaints from consumers and Attend with in time.
  • Maintain the records and submit to superiors correctly.
  • • Following the AMC Vendor Co‑Operations
  • O & M of HT & LT Panels.
  • O & M of HT & LT equipments like VCB, OCB, ACB, CT’S, PT’S.
  • O & M of Generators up to 1500 KVA. (SGMTU & Cummins)
  • O & M of Transformer up to 2500 KVA Alternative cooling type.
  • O & M of CHILLER units Upto 170 TR.(Dhanum Bush Make).
  • O & M of Air handling Units for floor wise.
  • O & M of UPS Units Upto 120 Kva,60 Kva,40 Kva,20 Kva.Floor wise.
  • O & M of softener plant.
  • O & M of AIR COMPRESSOR’S (ELGI Make),capacity 8.5 kg/cm.
  • O & M of fire protection system like smoke detectors, flame proof type detectors, fuel sensor detectors, gas & heat detectors.
  • O & M FM 200 Fire Systems & Panels.
  • O & M Forklift.
  • O & M Pumps & Motors.
  • Operating and Handling to the all type of fire extinguishers.
  • Maintenance and known about the FIRE HYDRANT system and sprinkler line system’s.
  • Known about the 5S Awareness and Root case analyses.
  • Known about the Lock out & Tag out (LOTO) procedure’s.
  • O & M FM 200 Fire Systems & Panels.
  • O & M Forklift.
  • O & M Pumps & Motors.
  • I have to prepare and present the auditing fils in the last, EHS ,EMS, FM Global, ISO 9001:2000 auditing in my company.
  • Known about the IMPACT and ASPECT studies.

Welder

Sun Engineering
Bangalore
04.2004 - 05.2009
  • Removed and repaired unacceptable welds with air arc and grinder to meet quality guidelines.
  • Inspected welds and checked critical measurements to meet specifications.
  • Fabricated shop parts directly from blueprints.
  • Welded in flat, horizontal, vertical, and overhead positions.
  • Set up and operated shielded metal arc and gas metal arc welding equipment.
  • Clamped, held, tack-welded, heat-bent and bolted component parts to achieve required configurations and positions.
  • Collaborated with engineers and designers to create new parts and assemblies.
  • Salvaged and rebuilt parts to achieve cost savings and reduce waste.
  • Welded metal components in vertical, overhead and flat positions.
  • Monitored and documented soldering results.
  • Inspected welds for accuracy and conformance to specifications.
  • Welded various connections with high-quality final results.
  • Prepared for assembly by positioning, aligning and securing parts using tools such as jigs and vises.
  • Maintained safety by wearing protective equipment, staying alert and following procedures.
  • Completed welding projects using gas metal arc, flux-cored arc, plasma arc, and shielded metal arc equipment.

Education

SSLC -

National Institute of Open Schooling
Chitradurga, Karnataka, India.
10.2016 - 12.2016

Skills

    Multi-project coordination

undefined

Interests

Reading Newspaper

Reading Building Project Drawing, Equipment Manual

Cocking

Traveling

Shopping

Listening to music

Driving licence

I have UAE Driving licence ( Automatic )

Work Availability

monday
tuesday
wednesday
thursday
friday
saturday
sunday
morning
afternoon
evening
swipe to browse

Timeline

MEP Project, Maintenance & Operation

Al Daqeeq Eng Turning LLC
03.2017 - Current

SSLC -

National Institute of Open Schooling
10.2016 - 12.2016

Site Foreman

Badra Engineering
10.2015 - 01.2017

Hard Facing Welder

Professional Hardfacing Services Sdn Bhd
08.2014 - 09.2015

Senior Facility Team Member

Maclellan Integrated Services India Pvt Ltd
06.2009 - 07.2014

Welder

Sun Engineering
04.2004 - 05.2009
HARISH H.S. Supervisor