HEMA RAM

HEMA RAM

MEPF (T&C Electrical)
Barmer

Summary

  • A skilled professional with 7 years of experience in installation, pre-commissioning, testing, and commissioning of electrical systems and equipment. Experienced in managing the complete project lifecycle, from initial installation to final commissioning, while ensuring compliance with statutory and regulatory standards. Proficient in troubleshooting, developing solutions, and delivering quality results on time and within budget.
  • Expert in the installation and commissioning of electrical systems such as electrical earthing, cable tray works, conduit installations, UPS systems, raceways, HVAC, fire detection systems, substations, HT & LT motors, transformers, HT & LT switchgear, process heaters, battery chargers, emergency DG sets, variable speed drives, and desalter. Skilled in preparing and executing pre-commissioning and commissioning procedures, conducting system checks, and ensuring seamless handover to client

Overview

6
6
years of professional experience
2
2
years of post-secondary education
2
2
Languages

Work History

MEPF (T&C, Electrical)

Currie & Brown India LTD
06.2024 - Current
  • Reduced downtime for clients by swiftly identifying and resolving any equipment malfunctions or system inefficiencies during the testing phase.
  • Guaranteed adherence to project specifications by diligently reviewing designs, drawings, schematics, and technical documentation before commencing testing procedures.
  • Installation of trans,former 20MVA,5MVA,1.5 MVA
  • HT Panel 11KV, LT panel,UPS 120KVA,
  • Drawing reviews
  • Testing of transformer ,LT Panel,HT Panel etc
  • Calculate Load estimate
  • Installation Reports , Testing Reports,commissioning Report,Pre-commissioning Report
  • BoQ, BOM
  • Material inspection plan(IMR),ITP,QAP,TPI


Electrical Engineer (MEP engineer)

Hemali Electricals Pvt Ltd (Monte Carlo Ltd)
11.2022 - 06.2024
  • Product Workshop & Warehouse Pkg-14 - Size Is 965mtr Length And 248-Meter Width
  • This is the largest warehouse in India, Monitoring and coordination of construction activities to achieve completion before deadlines with Safety
  • Substation, HT, LT, MCC room completed installation
  • Electrical Earthing laying as EIL standard up to 20KM
  • Single phase work/testing as EIL standard Conduit -PVC, MS conduit unto 15km Primary Circuits, Secondary Circuits Wiring
  • DB Installation & Termination 65 Db Termination
  • Cable Tray Structure & Design-20KM RUN
  • Power Cable Laying Up -220km
  • Panel Installation & Termination, Transformer Installation & Termination
  • Light Fixture Installation & Termination -2900 Light (100w,150w Hanging Light)
  • Ups Installation (10kvr,2kvr Vertiv)
  • Raceway Installation
  • Lighting Arrester Laying 50km
  • Field Call System (Fcs System) -45 Fcs System Installation & Termination
  • Plant Communication & Network System Rj45, Telephone, Network Rack Etc.
  • Fire Alarm Work Installation & Termination Smoke Detector -700, Heat Detector -120, Beam Detector -240, Manual Call Point(MCP)-120, Hooter, Control Relay, Monitor Relay, FAJB ...Etc
  • Hvac Work Vrv/Vrf, Vdf Indoor, Outdoor, Split Ac Installation
  • Doclever, Motorized Shutter Installation, Battery Room
  • Performed In-Depth Electrical Acceptance Testing Of Completed Hardware
  • Reviewed Specifications, Drawings, And Project Manuals
  • Read And Analyzed Blueprints and Project Documentation To Develop Workflows And Strategies
  • Presented Technical Information Clearly During Meetings with Clients And Stakeholders, Enabling Informed Decision-Making Processes
  • Reduced Downtime For Critical Equipment By Performing Thorough Maintenance And Timely Repairs
  • Coordination With Other Departments Such As Design, Procurements And Process, Material Management For Construction

Site Electrical Engineer

Aarkay Instruments Pvt Ltd (L&T Hydrocarbon Engineering Limited)
03.2021 - 10.2022
  • Preparation Construction Drawing For - Cable Tray, Lighting, Power Layout, SLD, Earthing Layout, Lighting Layout, Fire Alarm System
  • Circuit Preparation
  • Preparing Cable Routing Layouts, Earthing And Lighting Protection Layouts
  • Cable Schedules
  • Monitoring And Coordination Of Construction Activities To Achieve Completion Before Deadlines With Safety
  • Planning, Coordination, Execution Of Electrical Project (Erection, Commissioning Of Electrical Equipment's) To Meet Standard Of Specification And Safety
  • Coordination Between Contractor, Consultant And Vendors
  • Coordination With Other Departments Such As Design, Procurements And Process
  • Material Management For Construction Which Includes-Allocation Of Material Through MTO Details, Reservation Of Material Against The Drawing, Preparation Of MIN Against The Drawing, Approval Of MIN Through Material Coordinators, MIN Release For Item Through Contractor
  • Identifying Initial Spares (Commissioning Spares, Insurance Spares, Maintenance Spares Etc.)
  • Reviewing Of Handover-Takeover Documents By Ensuring Timely Receipt Of Manufacturer Maintenance Manuals, Drawings Set

Site Electrical Engineer

M-power Engineering & Service (Sterling and Wilson Pvt Ltd)
12.2018 - 02.2021
  • Erection And Commissioning Of Electrical System In Substation
  • Preparation Of SLDs, Layout And Section For AIS And GIS Substation
  • Illumination Calculation And Preparation Of Illuminations Layout (Indoor & Outdoor) & Conduit Layout
  • Earthing Calculation And Designing Of Earth-Mat Layout
  • Lighting Protection Calculation And Preparation Of Lighting Layout
  • Cable Sizing And Preparation Of Outdoor & Indoor Cable Trench
  • Transformer & DG Sizing Calculations
  • Preparation Of LV SLD (415V) AND LT Switchgear Room Layout
  • Electrical Equipment Installation (From Low Voltage Switch Gear To High Voltage Switch Gear)
  • Executing Project Management & Site Construction Activities, Supervising Documents Forwarding All Approved Documents To Site For Execution
  • Monitoring And Coordination Of Construction Activities To Achieve Completion Before Deadlines With Safety
  • Coordination Between Contractor, Consultant, And Vendors

Site Electrical Engineer

Mahalaxmi cng falling station
07.2018 - 11.2018
  • Collaborated With Design Engineers To Review Drawings, Ensuring Accurate Installation Of Electrical Components During Construction Phase
  • Improved Overall Project Efficiency By Effectively Supervising Electrical Commissioning Activities And Coordinating With Multidisciplinary Teams
  • Created And Maintained Daily And Weekly Reports For Upper Management
  • Monitored Daily Progress And Work Quality To Provide Guidance And Direction To Mechanics And Installers

Education

B. Tech - Electrical Engineering

Geetanjali Institute of Technical Studies
Kota, Rajasthan
01.2018 - 12.2018

Secondary Examination - undefined

Board of Secondary Education, Rajasthan
01.2011 - 12.2011

Skills

MS Office

undefined

Personal Information

  • Father's Name: Mr Jeeva Ram
  • Date of Birth: 02/15/95
  • Nationality: Indian
  • Marital Status: Married

Projects

Summer training at Larsen and Turbo Automation, Vadodara, Troubleshot electrical issue by checking electrical panel (circuit, switches, breakers), Mr Vikas Mehta (Head of Training in HR) Automatic Irrigation System, 11/2017 - 01/2018, Designed to develop an automatic irrigation system which switches the pump motor ON/OFF on sensing the moisture content of the soil.

Disclaimer

I hereby declare that the above-mentioned information is correct up to my knowledge and I bear the responsibility for the correctness of the above-mentioned particulars. If you give me a chance for work in your Organization I will try my best to satisfy your need towards the work.

Timeline

MEPF (T&C, Electrical)

Currie & Brown India LTD
06.2024 - Current

Electrical Engineer (MEP engineer)

Hemali Electricals Pvt Ltd (Monte Carlo Ltd)
11.2022 - 06.2024

Site Electrical Engineer

Aarkay Instruments Pvt Ltd (L&T Hydrocarbon Engineering Limited)
03.2021 - 10.2022

Site Electrical Engineer

M-power Engineering & Service (Sterling and Wilson Pvt Ltd)
12.2018 - 02.2021

Site Electrical Engineer

Mahalaxmi cng falling station
07.2018 - 11.2018

B. Tech - Electrical Engineering

Geetanjali Institute of Technical Studies
01.2018 - 12.2018

Secondary Examination - undefined

Board of Secondary Education, Rajasthan
01.2011 - 12.2011
HEMA RAMMEPF (T&C Electrical)