Summary
Overview
Work History
Education
Skills
Roles And Responsibilities
Civil Engineering Career
Other Credentials
Email Addresses
Personal Information
Disclaimer
Software
Timeline
Generic
Hussain Huzur

Hussain Huzur

Civil Engineer
Aligarh

Summary

Dynamic, results-oriented professional with over 13 years of extensive experience in project execution, planning, and management of civil works across various development projects. Proven track record in boosting productivity and streamlining procedures, ensuring efficient oversight of financial, personnel, and operational aspects. Demonstrated leadership abilities and strategic planning expertise as a Deputy Manager, effectively assisting senior management in achieving demanding targets through staff motivation and resource coordination. A methodical and well-organized approach to optimizing operations ensures alignment with long-term success and operational demands.

Overview

13
13
years of professional experience
4
4
Languages

Work History

Team Leader

District Project Monitoring Unit
10.2021 - Current
  • Set performance expectations for the team, monitoring progress towards goals and providing constructive feedback as needed.
  • Developed team members'' skills through targeted coaching sessions, resulting in improved individual performance.
  • Analyzing the drawing and design given and submitted in the DPR.
  • Checking the data of the DGPS survey conducted by TKC.
  • Checking the Per FHTC cost, per capital cost, and population taken in the DPR.
  • Checking and analyzing the scheme to determine if it is solar or electrical.
  • Water quality report checking, and land papers checking.
  • Checking the OHT height and capacity that is taken by the Water Jam software.
  • Checking the daily water demand taken into account in the calculation.
  • Checking the formula used in the calculation of the population and which method is used to take the average of all methods.
  • Checking the road reinstatement cost taken by Tkc.
  • Road cutting of different surfaces that are BT, interlocking, and BOE.
  • Checking of Form J for overall cost checking.
  • The checking of the cost taken by TKC for the HDPE pipe should be according to the revised rates approved by SWSM.
  • Checking work related to ISA and IEC activities.
  • Checking and monitoring work related to FTK activities and women, Jal Sakhi.
  • Monitoring the work of capacity building and training with the help of CB&T.
  • Matching quantity and rates with the drawing and S.O.R.
  • Checking all the reports attached in the DPR.
  • Giving regular presentations to clients about work progress.
  • Attending the VC of NIC Lucknow with DM Sir, the weekly VC of PS Sir, and the VC every Saturday of MD-UPJN with EE Sir.
  • Scheme ID creation and PFMS work.
  • DPR checking work, and BOQ uploading and checking work.
  • Hydro test inspection work and pressure checking.
  • Checking of various work performed by TKC, including HDPE laying work, hydraulic testing work, jointing work, material testing work in the lab, and water testing by an NABL-approved lab.
  • OHT drawing and design checking after vetting work is done.
  • Overall project progress and delay monitoring.
  • Attending regular meetings with district administration.
  • Monitoring tube well boring work.
  • Providing training and guidance to GIS for mapping of FHTC and HDPE laying work.
  • Maintain data on Portal IMIS, UPJJM, and Jal-Shakti.
  • LGD village tagging work.
  • Monitoring the construction of OHT, checking all designs, and making sure that work is done according to the guidelines of SWSM.
  • Checking the details and lab report of brick, cement, and sand before making the pump house.
  • Testing brick line and length, physical inspection test, crushing value test, and brick absorption test.
  • Making close contact with TPI about their site inspection work and reports.
  • Aggregate analysis tests, like the sieve test and the size of aggregate,
  • Making sure that all work is performed according to the guidelines of SWSM and IS Codes.
  • Checking all documents before billing work on the portal.
  • Checking bills of mobilization, material, and laying work, or any other work of construction, matching their quantities and rates with the BoQ and DPR.
  • Enhanced team productivity by implementing efficient work processes and regularly reviewing performance metrics.
  • Mentored junior staff members, helping them develop their leadership potential and advance in their careers.
  • Empowered team members by delegating responsibilities according to individual strengths and areas of expertise.
  • Managed conflict resolution among team members, fostering a positive and collaborative work environment.
  • Collaborated with other department leaders to establish shared goals and ensure alignment across teams.
  • Increased customer satisfaction ratings by closely monitoring service quality standards and addressing any issues promptly.
  • Provided ongoing support to direct reports, addressing concerns or questions promptly so they could remain focused on their tasks.
  • Streamlined workflows for increased efficiency, reducing turnaround times for critical tasks.
  • Coordinated resources effectively to meet project deadlines and achieve desired results.
  • Assisted in recruitment to build team of top performers.
  • Led cross-functional teams to execute projects on time, within budget, and with high-quality outcomes.
  • Led by example, demonstrating commitment and professionalism that inspired team members to excel.
  • Achieved project milestones ahead of deadlines, coordinating effectively with stakeholders and managing resources efficiently.
  • Optimized resource allocation, ensuring projects were delivered within budget and scope.
  • Facilitated culture of continuous improvement, encouraging feedback and innovative solutions from all team members.
  • Oversaw quality control measures, maintaining high standards for all project outputs.
  • Conducted thorough market research to guide strategic decisions and maintain competitive advantage.
  • Enhanced team productivity by implementing efficient task delegation and regular performance evaluations.
  • Conducted regular reviews of operations and identified areas for improvement.
  • Collected, arranged, and input information into database system.
  • Helped meet changing demands by recommending improvements to business systems or procedures.
  • Gathered, organized and input information into digital database.
  • Devised and implemented processes and procedures to streamline operations.
  • Supported creation of detailed, technical financial models to value potential acquisition targets.
  • Observed packing operations to verify conformance to specifications.

Deputy Project Manager

ION EXCHANGE LTD
01.2020 - 09.2021
  • Company Overview: It's an MNC company working on STP, WTP, and energy resources planning for more than 60 years. Currently, the company is involved in the Jal Jivan Mission Project in the districts of Hathras and Aligarh in UP.
  • Verified quality of deliverables and conformance to specifications before submitting to clients.
  • Achieved significant improvements in project quality by establishing rigorous quality control processes.
  • Sourced, vetted and managed vendors needed to accomplish project goals.
  • Maintained open communication by presenting regular updates on project status to customers.
  • Reported regularly to managers on project budget, progress, and technical problems.
  • Successfully managed multiple projects simultaneously by prioritizing tasks according to urgency, resource availability, and alignment with organizational goals.
  • Planned, designed, and scheduled phases for large projects.
  • Identified plans and resources required to meet project goals and objectives.
  • Monitored project performance to identify areas of improvement and make adjustments.
  • Monitored progress against established goals, adjusting schedules and resources as needed to keep projects on track.
  • Met project deadlines without sacrificing build quality or workplace safety.
  • Established effective communication among team members for enhanced collaboration and successful project completion.
  • Coordinated with cross-functional teams to resolve project issues and mitigate risks.
  • Managed risk assessments and implemented mitigation strategies to minimize potential issues during project execution.
  • Developed comprehensive project plans with clear timelines, milestones, and budget requirements, ensuring timely delivery of high-quality results.
  • Coordinated cross-functional teams and resolved conflicts, maintaining a positive work environment throughout the project lifecycle.
  • Prepared detailed reports on project status for stakeholders, ensuring transparency and alignment with objectives.
  • Provided detailed project status updates to stakeholders and executive management.
  • Developed strong relationships with stakeholders through regular communication updates, fostering trust and confidence in the team''s ability to deliver results.
  • Collaborated closely with senior management to align project objectives with strategic company initiatives, ensuring that efforts contributed to overall business growth.
  • Provided detailed technical and operational direction in project challenges, consistently meeting deliverables according to deadlines.
  • Enhanced overall project success by conducting thorough post-project evaluations and incorporating lessons learned into future efforts.
  • Effectively managed scope creep by establishing clear boundaries on requested changes while keeping projects aligned with original objectives and budgets.
  • Mentored junior team members in project management best practices to enhance their skills and contribute to better overall performance.
  • Negotiated and managed third-party contracts related to project deliverables.
  • Fostered a culture of innovation and creativity within the project team, leading to improved problem-solving capabilities and enhanced outcomes.
  • Negotiated contracts with vendors and suppliers, securing quality materials at competitive prices for efficient use of resources.
  • Coordinated material procurement and required services for projects within budget requirements.
  • Delivered exceptional customer satisfaction by proactively addressing client concerns and meeting or exceeding expectations throughout the engagement process.
  • Created accurate budgets based on resource requirements, allowing for optimal allocation of funds across all aspects of the projects.
  • Proved successful working within tight deadlines and a fast-paced environment.
  • Achieved high levels of team engagement and morale by promoting collaborative and inclusive work environment.
  • Streamlined procurement process for project materials, reducing wait times and avoiding potential delays.
  • Improved client relationships, consistently meeting or exceeding project expectations and maintaining open lines of communication.
  • Maintained compliance with industry standards and regulations, conducting regular audits and updates to project practices.
  • Checking of reports in the DPR, which included land papers, the water quality report of that area, the NGT test if done, the water strata report of that area, and the DGPS survey report.
  • Checking the pipe laying drawing and various layouts in the DPR for the PH, boundary wall, etc.
  • Checking the list of contractors available in that area, taking quotations, and mobilizing them.
  • Checking the availability of skilled labor in that area and making a list of labor suppliers.
  • Checking the availability of the Water Jam report in the DPR.
  • Analyzing various reports that the designers have taken to decide the OHT height, capacity, and pumping hours.
  • Population method, graph, and data.
  • Analyzing the number of rig machines required for boring and finalizing subcontractors.
  • Conducting a meeting with the SDM and Lekhpal to check the land area.
  • Mobilizing staff as per requirement, tehsil-wise, block-wise, and area-wise.

Project Engineer

Ministry of Urban Development
01.2017 - 03.2020
  • Checking design and analyzing estimation part for overhead tanks and other civil constructions on site.
  • Coordinating with UP Jal-Nigam Head Office for approval of design and other issues relating to project like Cover-Agreements.
  • Checking and signing of BOQ’S approved JAL-NIGAM.
  • Preparation of project report and its presentation with Executive Engineer and SE.
  • Leading all daily site progress with Junior Engineers of each block for continuous progress and ensuring completion of projects in timely manner.
  • Preparation of DPR which include detail survey of topography covering all habitations and revenue villages.
  • Checking each rate with SOR.
  • Attending Regular meeting with higher officials like EE, SE, CE and PS and also managing local district administration.
  • Checking of all drawing and there junction nodes with flow of water.
  • Regular checking of all drawing and design with consultants.
  • Checking the design of OHT and distribution network and recommendation of changes where it is required.
  • Over all progress of project and its timely handover.
  • Checking and timely submission of DPR which should cover all reports like WTR of nearby water sources, list of habitations and villages approved by Jal-Nigam and district units, all water strata reports of that area.
  • Checking of all land allotment papers and if water quality is affected than searching the land for pump house.
  • Checking and commissioning of tube well.
  • Checking and ensuring successful lowering of tube well in timely manner.
  • Preparation of Tenders coordinating with contractors for financial and physical bidding.
  • Checking of bills and measuring sheets.

Project Engineer

Albina-Construction LLC
07.2014 - 01.2017
  • Company Overview: Construction company based at Muscat, Oman.
  • Checking and coordinating all shuttering and steel work at the time of column, slab and retaining wall making.
  • RCC core and shell work including raft foundation, drop slab, Flat slab columns, piling work and other structural works, planning and coordination of slab casting, column casting and other concrete works big or small.
  • Checking of post tensioning work at the time of raft and slab work.
  • Making checklist for all plumbing work, electric work, surface piping, firefighting etc and coordinating with MEP staff.
  • Staircase making steel work and concreting.
  • Beam steel work distribution of main bars, extra bars, face bar etc.
  • Slab levels, column levels and all shuttering levels marking and there rechecking before slab work and other concrete work.
  • Marking of column, lift area, staircase area and other essentials for each slab before steel work.
  • Working with team of carpenter’s for panel and frame work shuttering (Doka) for retaining wall, columns and others structures.
  • Block work and every level including outer block work and inner block work.
  • Plastering work checking on internal and external walls according to drawings.
  • Making checklist for all plaster-work to minimize wastage and re-plastering.
  • Affective cost utilization at all levels and for all works at all stages.
  • Making of PPT and other reporting for PM and GM on weekly basis to make them understand the practical position of site work and progress.
  • Pointing out delays if any due to change in drawing or due to material or any other managerial issue and to resolve it asap.
  • Making sure the availability of skilled labour at site at all time to speed up the work.
  • Resolving all the issues related to contractors there bills there work progress and all other issues related to site work.
  • Review civil/structural plans to ensure consistency of requirements.
  • Supervise and inspect civil, structural and architectural works to ensure strict compliance with the plans, specifications and other related contract documents.
  • Screed of basement and making of panels for screed work maintaining good surface for long run of a perfect basement, Kerb stone design work, marking, painting etc.
  • Water proofing in toilets, pantries, roof area water-proofing work, waterproofing of water walls, swimming pools etc.
  • Preparation of BBS and submission of steel re-cancellation.
  • Making of BOQ of all items.
  • Preparation of checklist of all finishing work and making sure of their implementation at site.
  • Checking of all painting work, Mechanical raised flooring, interior designing, carpet pasting etc.
  • Semi-structures like water walls, installation of big size aquariums and fountains of steel for indoor purpose.
  • False ceiling work and all wall decorative and ceiling beautification.
  • Working with MEP Engineers for plumbing, electrical and firefighting work, decent knowledge of AC ducting and HVAC.
  • Building of power station for any commercial or residential buildings electrical cabling and other installation.
  • Checking basics for lift and other necessary installation at time of finishing.
  • Marble work wall cladding and other interior decorations.
  • HVAC works like A.C-ducting, outdoor units there foundation and placements and can follow up with HVAC engineers and sub-contractors for issue related to such problems.
  • Negotiating accordingly with subcontractors about the work and can work with any kind of team.
  • As a Project-Engineer, I was responsible to give safe and sound environment to my subordinates and to laborers especially at site because site management and site safety was my prime concern.
  • Coordinating with planning team and architectural team was part of daily routine.
  • Execution of hanging steel structure called hanging restaurant and all other day today masonry work which include wall making, ACC block and solid block work there measurement and preparation of bills.
  • Landscape work outer area construction and development laying of pavers.
  • Construction company based in Muscat, Oman.
  • Provided technical expertise throughout all phases of the project, ensuring accurate execution of designs and specifications.
  • Maintained records for each project and engineering discipline.
  • Reduced project timelines with proactive planning and close monitoring of progress.
  • Identified technical risks within managed projects.
  • Determined and scheduled priorities as required to progress engineering work.
  • Improved communication among stakeholders through regular updates and meetings.
  • Negotiated contracts with suppliers to secure favorable terms and save costs.
  • Reviewed contractor proposals to determine favorable partnerships for on-time and under-budget project completion.
  • Implemented sustainable practices in project execution, demonstrating commitment to environmental responsibility.
  • Conducted comprehensive risk assessments to mitigate potential issues, safeguarding project timelines and budgets.
  • Engaged in industry forums and workshops to stay abreast of new trends and technologies, applying insights to enhance project performance.
  • Managed project budgets with precision, preventing cost overruns and ensuring financial integrity.
  • Streamlined communication channels with suppliers, improving supply chain efficiency and reducing project delays.
  • Negotiated contracts with vendors to secure advantageous terms, contributing to cost savings.
  • Implemented quality control procedures, elevating standard of project deliverables.
  • Optimized resource allocation by thorough planning and analysis, maximizing project profitability.
  • Led cross-functional teams to streamline project delivery processes, significantly enhancing efficiency and team collaboration.
  • Documented and developed engineering procedures and processes.
  • Designed and implemented quality control processes to facilitate customer satisfaction.
  • Verified construction documentation to meet client requirements and vision.
  • Analyzed and interpreted customer requirements to develop engineering solutions.
  • Implemented new strategies to reduce costs and improve efficiency of engineering team.
  • Conducted research to identify and evaluate new technologies and concepts.

Site Engineer

Reliance Petro Chemical
12.2012 - 06.2014
  • Supervising sampling of material as called for by the contract provision on quality assurance and control.
  • Hydraulic protection along the route of pipeline like retaining wall, Masonry structure, gabion stone cage etc.
  • Jack in piling, bored and micro piling.
  • Building of pump station.
  • Building of warehouse, workshops and control rooms.
  • Preparation of bill quantities, documents, scope of work, technical specification etc.
  • Block valve station along the route of pipe line.
  • Supervising skilled laborer and worker on the site.
  • Assuring and controlling the quality and safety of work on site.
  • Construction of Culvert, Tanks and Chemical pits foundations.
  • Fabrication of concrete racks (precast column and beams).
  • Equipment Foundation, Internal plant roads, walkway, pavements, Setting of steel structures for racks to support pipes, tank foundations, vertical and horizontal pump foundations, modular steel structure, Precast beam and column for pipe support.
  • Making various kind of reports for erection of column and beams including all kind of safety checks.
  • Planning of work with respect to conditions.
  • Pre-stressed, concrete-work.
  • Preparation of bar bending schedule and quantities for all work.
  • Ensure smooth project flow by coordinating specific work with other trade involved in project.
  • Prepare working schedule and strict monitoring the progress of work to ensure completion within contracted time frame.
  • Concrete and steel pipe rack foundation.
  • Erection of steel structure on concrete pipe racks.
  • Prepare material take off and cost estimate for various trade of the project.
  • Prepare bill and requisition for material.
  • Assure execution as per design and drawing.
  • Coordination with survey Engineer for route and levels.
  • Performing underground excavation for fire water and cooling water lines.
  • Preparation of DLR and DPR.
  • Showing daily progress report through graphs and slides and preparing for minutes of meeting so that any hindrance in work can be eliminated on daily basis.

Education

Bachelor of technology - civil

Govt. University U.P.T.U
01.2012

XII - PCM

Our Lady of Fatima
01.2007

Secondary School Examination - undefined

Aligarh, UP
01.2004

No Degree - Jal Jivan Mission-"Operation And Maintenance".

Training Under Department of Drinking Water And Sanitation
Lucknow
05.2001 -

Skills

Construction Project Management

Project Scheduling & Quality Control

Project Planning & Execution

Leadership & Communication

Labor Management

Remote team management

Workload management

undefined

Roles And Responsibilities

  • Site Engineer, Reliance Petro Chemical Project, Jamnagar, Gujarat, India, 2012-12-01, 2014-06-30, Supervising sampling of material as called for by the contract provision on quality assurance and control. Hydraulic protection along the route of pipeline like retaining wall, Masonry structure, gabion stone cage etc., Jack in piling, bored and micro piling. Building of pump station., Building of warehouse, workshops and control rooms., Preparation of bill quantities, documents, scope of work, technical specification etc. Block valve station along the route of pipe line., Supervising skilled laborer and worker on the site., Assuring and controlling the quality and safety of work on site. Construction of Culvert, Tanks and Chemical pits foundations., Fabrication of concrete racks (precast column and beams)., Equipment Foundation, Internal plant roads, walkway, pavements, Setting of steel structures for racks to support pipes, tank foundations, vertical and horizontal pump foundations, modular steel structure, Precast beam and column for pipe support., Making various kind of reports for erection of column and beams including all kind of safety checks., Planning of work with respect to conditions,Pre-stressed, concrete-work. Preparation of bar bending schedule and quantities for all work. Ensure smooth project flow by coordinating specific work with other trade involved in project. Prepare working schedule and strict monitoring the progress of work to ensure completion within contracted time frame. Concrete and steel pipe rack foundation. Erection of steel structure on concrete pipe racks. Prepare material take off and cost estimate for various trade of the project. Prepare bill and requisition for material., Assure execution as per design and drawing. Coordination with survey Engineer for route and levels. Performing underground excavation for fire water and cooling water lines. Preparation of DLR and DPR. Showing daily progress report through graphs and slides and preparing for minutes of meeting so that any hindrance in work can be eliminated on daily basis.
  • Project Engineer, Albina-Construction LLC, Muscat, Oman, 2014-01-01, 2017-12-31, Checking and coordinating all shuttering and steel work at the time of column, slab and retaining wall making. RCC core and shell work including raft foundation, drop slab, Flat slab columns, piling work and other structural works, planning and coordination of slab casting, column casting and other concrete works big or small. Checking of post tensioning work at the time of raft and slab work. Making checklist for all plumbing work, electric work, surface piping, firefighting etc and coordinating with MEP staff. Staircase making steel work and concreting. Beam steel work distribution of main bars, extra bars, face bar etc.Slab levels, column levels and all shuttering levels marking and there rechecking before slab work and other concrete work. Marking of column, lift area, staircase area and other essentials for each slab before steel work. Working with team of carpenter’s for panel and frame work shuttering (Doka) for retaining wall, columns and others structures. Block work and every level including outer block work and inner block work. Plastering work checking on internal and external walls according to drawings. Making checklist for all plaster-work to minimize wastage and re-plastering. Affective cost utilization at all levels and for all works at all stages. Making of PPT and other reporting for PM and GM on weekly basis to make them understand the practical position of site work and progress. Pointing out delays if any due to change in drawing or due to material or any other managerial issue and to resolve it asap. Making sure the availability of skilled labour at site at all time to speed up the work. Resolving all the issues related to contractors there bills there work progress and all other issues related to site work. Review civil/structural plans to ensure consistency of requirements. Supervise and inspect civil, structural and architectural works to ensure strict compliance with the plans, specifications and other related contract documents.
  • Project Engineer, Ministry of Urban Development, 2017-01-01, 2020-03-02, Checking design and analyzing estimation part for overhead tanks and other civil constructions on site.Coordinating with UP Jal-Nigam Head Office for approval of design and other issues relating to project like Cover-Agreements. Checking and signing of BOQ’S approved JAL-NIGAM. Preparation of project report and its presentation with Executive Engineer and SE. Leading all daily site progress with Junior Engineers of each block for continuous progress and ensuring completion of projects in timely manner. Preparation of DPR which include detail survey of topography covering all habitations and revenue villages. Checking each rate with SOR. Attending Regular meeting with higher officials like EE, SE, CE and PS and also managing local district administration. Checking of all drawing and there junction nodes with flow of water. Regular checking of all drawing and design with consultants.Checking the design of OHT and distribution network and recommendation of changes where it is required. Over all progress of project and its timely handover. Checking and timely submission of DPR which should cover all reports like WTR of nearby water sources, list of habitations and villages approved by Jal-Nigam and district units, all water strata reports of that area. Checking of all land allotment papers and if water quality is affected than searching the land for pump house. Checking and commissioning of tube well. Checking and ensuring successful lowering of tube well in timely manner. Preparation of Tenders coordinating with contractors for financial and physical bidding. Checking of bills and measuring sheets.

Civil Engineering Career

Construction Project Management, Project Scheduling & Quality Control, Project Planning & Execution, Leadership & Communication, Labor Management

Other Credentials

  • Full knowledge of MS-excel.
  • STAAD - Pro
  • MS-Office
  • Member of American Society of Civil Engineering.
  • Member of The Indian Concrete Design Mix Society.
  • Attended international conference on post tension work in high rise building and heavy structures in Muscat, Oman.
  • Knowledge of Auto-Cad and MS projects.
  • Member of Oman Civil Engineer Society.

Email Addresses

  • Fazlakbar110@gmail.com


Personal Information

  • Date of Birth: 1986-10-30
  • Gender: Male
  • Marital Status: Married

Disclaimer

I hereby declare that the above mentioned information is genuine up to the best of my knowledge and I assure that if given an opportunity my performance will match up to your expectations.

Software

Auto Cadd

MSP

P-6

MS-Excel

MS-Office

Timeline

Team Leader

District Project Monitoring Unit
10.2021 - Current

Deputy Project Manager

ION EXCHANGE LTD
01.2020 - 09.2021

Project Engineer

Ministry of Urban Development
01.2017 - 03.2020

Project Engineer

Albina-Construction LLC
07.2014 - 01.2017

Site Engineer

Reliance Petro Chemical
12.2012 - 06.2014

No Degree - Jal Jivan Mission-"Operation And Maintenance".

Training Under Department of Drinking Water And Sanitation
05.2001 -

XII - PCM

Our Lady of Fatima

Secondary School Examination - undefined

Bachelor of technology - civil

Govt. University U.P.T.U
Hussain HuzurCivil Engineer