Summary
Overview
Work History
Education
Skills
Software
Languages
Timeline
Generic
Iftequar Hussain

Iftequar Hussain

Construction Manager (Civil)

Summary

Professional Project Management Specialist with experience working with teams to accomplish short- and long-term project goals. Managed budgets and monitored project costs.

Overview

24
24
years of professional experience

Work History

Assistant Project Coordinator

DCS -PV RAO JV
02.2022 - Current

List of Projects Worked:

Construction of Road Over Bridges (ROBs) at 4 locations (i.e. Manmad-Mudkhed section at LC No. 122 km, 291/9-292/0, LC No. Akola-Purna Section at LC No. 115 km, 821/6-7, LC No. 144B-km 872/2-3, Akola-Purna, and Manmad-Mudkhed Section LC No. 134A & 176A -km 948/5-6, in lieu of LC gates in Maharashtra area of Nanded Division of South Central Railway.

My responsibilities include.

  • Enabled smoother transitions between different stages of projects via thorough preparation work such as gathering required materials or setting up systems ahead of time.
  • Reviewed documentation to verify conformance with established project criteria.
  • Guided project team staff to drive project success.
  • Reduced project delays by proactively identifying potential roadblocks and escalating issues as needed.
  • Contributed to improved resource allocation decisions by regularly updating project managers on team bandwidth constraints and accomplishments.
  • Assisted with onboarding newly hired staff members and coached on task prioritization.

Construction Manager

Navayuga Engineering Company
12.2016 - 02.2022

List of Projects Worked:

1. Construction of Gewan Island Infrastructure works package-2, in The Pearl Qatar.

2. Construction of Infrastructure for Giardino Village. The Pearl Qatar.

Work included in the project.

  • Installation of Sewage Water line with house connections.
  • Installation of Storm Water line with house connections.
  • Installation of portable and irrigation water line with house connections.
  • Installation of a pneumatic waste collection system.
  • Installation of a district cooling system.
  • Installation of MV and LV cables, substation, and street light.
  • Installation of road pavement, including kerbing, paving, road marking, and road furniture.
  • Installation of Soft Landscaping and Irrigation Network.
  • Construction of Substation Buildings.

My responsibilities include.

  • Identified and resolved construction issues promptly to prevent delays.
  • Monitored daily progress on-site to maintain a clear understanding of challenges faced by the team members or any required adjustments in plans or schedules.
  • Monitored subcontractor operations and applied effective time, resource, and money management strategies to deliver under-budget project completion.
  • Communicated daily with vendors to keep project fully operational.
  • Implemented safety protocols for reduced workplace injuries, conducting regular site inspections, and safety meetings.
  • Verified completed projects met approved time, quality, and cost estimates.
  • Developed strong relationships with subcontractors, leading to efficient collaboration on complex construction projects.
  • Completed projects within time constraints by effectively managing schedules and allocating resources.
  • Surveyed sites to determine material needs and accurately manage inventories and budgets.
  • Increased client satisfaction by consistently delivering high-quality workmanship and addressing concerns promptly.
  • Prepared detailed project estimates and reports for management review.
  • Negotiated labor contracts with general contractors and subcontractors.
  • Performed regular job site observations to provide direction for general contractor personnel and subcontractor laborers.
  • Oversaw effective disposal of construction waste and implemented programs to increase use of recycled materials.

Construction Manager

Abdullah AM Al Khodari Sons Co.
03.2011 - 07.2016

List of Projects Worked:

1. Construction of Infrastructure for Housing Project in Al Qaseem Region.

Work included in the project.

  • Installation of Sewage Water line with house connections.
  • Installation of Storm Water line with house connections.
  • Installation of portable and irrigation water line with house connections.
  • Installation of MV and LV cables, substation, and street light.
  • Installation of road pavement, including kerbing, paving, road marking, and road furniture.

My responsibilities include.

  • Conducted regular site inspections to ensure quality standards were upheld throughout each phase of the construction process, while minimizing potential hazards on-site, as well as delays in progress timelines.
  • Optimized workforce productivity with targeted training programs tailored to individual skillsets and roles within the team.
  • Managed subcontractors effectively, fostering strong relationships to maintain seamless collaboration throughout the project lifecycle.
  • Improved construction site efficiency by implementing streamlined scheduling and resource allocation processes.
  • Ensured robust safety protocols were in place on all sites, conducting regular training sessions for staff members to minimize accidents and create a secure working environment.
  • Collaborated closely with architects and engineers during design and planning phases to ensure seamless integration of construction activities.
  • Expedited project completion timelines by coordinating multi-disciplinary teams in a cohesive manner.
  • Mitigated risks associated with labor disputes by fostering open communication channels among team members and addressing grievances promptly when necessary.
  • Enabled seamless handover processes post-construction by providing comprehensive documentation packages to clients upon project completion.
  • Surveyed sites to determine material needs and accurately manage inventories and budgets.
  • Identified and resolved construction issues promptly to prevent delays.
  • Monitored construction sites for compliance with safety regulations and adherence to standards.

1. 325 S-13 Royal Commission, Jubail. Operation and Maintenance of Roads in Jubail Industrial City.

Work included in the project.

  • Review of design and drawing, issuing encroachment permit, review of LAR (Land acquisition request), final inspection for site handover on behalf of client.
  • Maintenance of road pavement, kerbing, and paving.
  • Maintenance of Road Furniture.
  • Maintenance of traffic signals.
  • Maintenance of storm drainage structure.
  • Maintenance of Major and Minor structure.
  • City cleaning and manual picking.

My responsibilities include.

  • Processing the documents for an Encroachment Permit.
  • Review the drawings for road closure, as per Royal Commission Standards.
  • Site inspection for final handover.

1. Dueling on Nagran Sharurah Road.

Work included in the project.

  • Construction of Embankment.
  • Construction of Subgrade.
  • Construction of Aggregate Base Course.
  • Construction of Wearing Course.
  • Road furniture.

My responsibilities include.


  • Monitored daily progress on-site to maintain a clear understanding of challenges faced by the team members or any required adjustments in plans or schedules.
  • Efficient Utilization of Manpower and Machinery.
  • Overall management of office and site staff.
  • Reporting to the Project Manager.

Resident Engineer

Technogem Consultants Pvt Ltd. Mumbai India.
02.2010 - 03.2011

List of Projects Worked:

1. Engineering and Short-Term Improvement & Routine Maintenance of NH-4B from Km 5/000 to 26/987 (Section A1-E), Km 0/000 to 4/500 (Section D-G), and NH-4 from Km 106/000 to 109/500. In the state of Maharashtra.

2. Engineering and short-term improvement, and Routine Maintenance of Sh-54 from Km 6/400 to 14/550, and Amra Marg from Km 0/000 to 6/200. Including a six-lane major bridge across Panvel Creek. In the State of Maharashtra.

Work included in the project.

  • Construction of Rigid Pavement at various locations.
  • Widening and Improvement of Flexible Pavement at Junction Points, Improvement of Junctions.
  • Routine Maintenance of Road for safety and smooth operation of traffic.
  • Operation of towing van, Ambulance, and Highway Patrol Vehicle.

My responsibilities include.

  • Routine checking of incident management works, like patrol vehicle and ambulance. Improvement of road with respect to. Safety of road users, such as fixing delineators, cat eyes, and retro reflective stickers.
  • Execution of patch work of DBM and BC. Applying thermoplastic paint to the carriage for greater visibility during the night. Painting with enamel paint to the parapet wall of bridges and CD works. Painting to kerbs, providing, and repairing of various types of signboard. Providing and repair of metal beam crush barrier where embankment is more than 3 meters.
  • Maintenance of carriageway and median up to ROW by removing dust from carriageway by means of mechanical boomer.
  • Issuing indent to the contractor for work. Supervising the work while execution.
  • Taking levels and measurements at every stage of work and recording measurements in a measurement book.
  • Monitored construction progress, updating documents and information.
  • Wrote reports, kept thorough field notes and logged daily activities.

Assistant Resident Engineer

Consulting Engineering Services (I) Pvt Ltd.
02.2008 - 02.2010

List of Projects Worked:

1. Infrastructural Development Programme under JNNURM for Pune Municipal Corporation.

Work included in the project are:

  • Construction of Underpass on NH 4 at Baner Junction.
  • Construction / improvement of PQC and Bituminous Road from Poud Phata to Chandni Chowk. Length of road: 4.00 Km with DP Width: 36.00 m.
  • Construction/improvement of PQC and Bituminous Road from Sanchati Hospital to University junction. Length of road 3.00 km with DP width 36.00 m.
  • Construction of Bituminous Road from Baner Gouthan to Westerly Bypass, length 3.00 km with DP width 18.00 m.

My responsibilities include.

  • Successfully completed Project management and supervision as a structural Engineer for Baner subway across NH-4 at Baner Balewadi junction, four lanes with walls on. Outer side pears placed centrally with solid slab, skew of 29 degrees. It also includes construction of a four-pipe culvert and retaining wall, each with a length of 200 meters. For NH-4.
  • Successfully completed project management and supervision as a structural engineer at Poud Road, Pune, for two box culverts with a span of 11.00 meters, a skew of 45 degrees, and a length of 55.00 meters. Pipe culvert and retaining wall.
  • I was fully responsible for checking all drawings submitted by the contractor pertaining to the structures, execution of structural work, i.e., layout execution, reinforcement, shuttering, and concreting. Assist the Resident Engineer in contractual matters against the contractor's claim. Also responsible for checking of RA Bills submitted by contractor. I was also responsible for site supervision, material approvals, on-site quality control, attending progress meetings with client and contractor to ensure completion of project within stipulated time.

2. Design of infrastructure for mining bypass from Ugem to Capxem in Goa. Length 29.00 km.

My responsibilities include.

  • Design of new alignment from Ugem to Capxem and Panchwadi to Xelvona in the state of Goa.
  • Coordinating with the client and different offices for finalizing and approval of new alignment, including Major Bridge on Zuari River, and ROB across the South Eastern Railway line.
  • Conducted hydrographic survey for major bridge on Zuari River. Conducted survey for high flood level, high tide, and low tide level.
  • Conducted survey for ROB across Madgaon, Hubli (South Eastern Railway).
  • Leading the survey team for reconnaissance and detail survey.

Senior Highway Engineer

Ajwani Infrastructure Pvt LTD Mumbai
02.2007 - 02.2008

List of projects on which I worked:

1. Construction of the old Mumbai-Pune Highway from Nasik Phata to Pimpri Grade Separator. Length 2.00 km, dp width 50.00 m.

The project includes two subways, one box culvert, and pipe culverts.

  • The Vallabh Nagar subway across the Old Mumbai-Pune Highway is a box-type structure with a span of 12.00 meters. Approach road and retaining walls of length 1.00 km.
  • H.A. Subway across the Old Mumbai-Pune Highway. The subway is a box type with a span of 7.00 meters, with an approach road, and retaining walls.
  • Minor Bridge at Kalasagar on Nalla with a span of 3 x 7.00 m with P.C.C. Abutments and Piers, Return wall, and R.C.C. Solid slab.

My responsibilities include.

  • I was solely responsible for setting out and execution of two number subways, Box Culvert, and pipe culvert. Including preparation of bar bending schedule, checking steel as per approved design, checking formwork, and concreting. I was also responsible for execution of PQC and bituminous roads, on-site quality control, and preparation of monthly RA. Bills.

Project Engineer

Syed Kadhem AL-Durazi Group of Companies BSC ©
12.2004 - 02.2007

List of projects on which I worked:

1. Name of Project: Alba Line-5 Expansion Project.

  • Project Details: Supervision on Asphalted pavement, Kerbing, Paving, Concrete drain, retaining wall, Head wall, Precast culvert, Guardrails, Guide posts, wire fencing, Stone pitching, Street light cabling, etc.

2. Name of Project: Alba Garden Development.

  • Project Details: To prepare the site for the visit of President of Bahrain, HH Shaikh Khalifa Bin Al Khalifa, to inaugurate line five at Alba (Aluminium Bahrain).

3. Name of Project: Site preparation for Shakura Housing Development Project at Shakura Village, Kingdom of Bahrain.

  • Project Details: To prepare the base for the Housing Development project for the Ministry of Housing, which includes setting out the project, cutting the ground up to formation level, and filling it with select fill and compaction up to the required level.

4. Name of Project: Reclamation work at Tubli, kingdom of Bahrain.

5. Name of Project: Alba car park.

My responsibilities include.

  • As a Project Engineer, I was responsible for onsite quality control, attending progress meetings with the client and consultant to ensure completion of the project within the stipulated time.
  • Trained and mentored junior engineers, providing guidance and direction.
  • Verified construction documentation to meet client requirements and vision.

Civil Engineer

Ms Gharkul Architectural and Structural Consultant
06.2000 - 12.2004

My Responsibilities Include.

  • Estimated quantities and material costs during project planning to support budgeting and costing.
  • Supervised construction progress on-site, addressing any discrepancies or issues promptly while maintaining safety protocols.
  • Monitored execution of contract work for compliance with design plans and specifications.
  • Managed subcontractors effectively, promoting collaboration and ensuring adherence to project specifications.

Education

BE Civil - Civil Engineering

Government College of Engineering
Aurangabad, Maharashtra, India
04.2001 -

Skills

Motivational Skills

Software

MS office

MS Project

Primavera 683

Auto Cad

Languages

English
Advanced (C1)
Arabic
Elementary (A2)
Hindi
Advanced (C1)
Marathi
Advanced (C1)
Urdu
Advanced (C1)

Timeline

Assistant Project Coordinator

DCS -PV RAO JV
02.2022 - Current

Construction Manager

Navayuga Engineering Company
12.2016 - 02.2022

Construction Manager

Abdullah AM Al Khodari Sons Co.
03.2011 - 07.2016

Resident Engineer

Technogem Consultants Pvt Ltd. Mumbai India.
02.2010 - 03.2011

Assistant Resident Engineer

Consulting Engineering Services (I) Pvt Ltd.
02.2008 - 02.2010

Senior Highway Engineer

Ajwani Infrastructure Pvt LTD Mumbai
02.2007 - 02.2008

Project Engineer

Syed Kadhem AL-Durazi Group of Companies BSC ©
12.2004 - 02.2007

BE Civil - Civil Engineering

Government College of Engineering
04.2001 -

Civil Engineer

Ms Gharkul Architectural and Structural Consultant
06.2000 - 12.2004
Iftequar HussainConstruction Manager (Civil)