Summary
Overview
Work History
Education
Skills
Affiliations
Accomplishments
Certification
Languages
Timeline
Generic
Ishant  jagotra

Ishant jagotra

Kangra

Summary

Experienced Electrical Engineer and Maintenance Supervisor with a demonstrated history of overseeing electrical engineering operations and maintenance within a manufacturing plant. Skilled in project management, system installation, and compliance with electrical standards. Proficient in the design, planning, and execution of electrical projects using AutoCAD. Adept at collaborating with cross-functional teams to ensure seamless integration of electrical systems, and fostering a culture of continuous improvement and professional development. Recognized for exceptional project management skills, delivering projects within deadlines and budget constraints, and implementing innovative electrical solutions to enhance system reliability and efficiency. Currently responsible for the safe operation, startup, and shutdown of power supply systems, as well as the maintenance of power supply and machinery.

Overview

5
5
years of professional experience
1
1
Certification

Work History

Electrical Engineer

Beaso By Anagram systems
Kangra
04.2023 - Current
  • Comprehensive Electrical and Maintenance Operations:
    Spearheaded the comprehensive electrical engineering operations and maintenance within the manufacturing plant. This involved meticulous planning, implementation, and oversight to ensure all electrical systems were fully operational, reliable, and safe.
  • Advanced Project Management:
    Led and executed several critical installation projects, including the setup of a medium voltage substation for a connected load of 510.800 KW and a contract demand of 310 KVA. This required detailed project planning, resource allocation, and coordination with various stakeholders to meet project milestones and deadlines.
  • System Installation and Maintenance:
    Directed the installation and connection of essential electrical systems, including laying 800 meters of G.I strips and installing both pipe and plate earthing systems. Ensured all installations complied with industry standards and safety regulations.
  • High Tension (HT) & Low Tension (LT) Line Projects:
    Supervised the erection of HT and LT lines, ensuring strict adherence to safety protocols and quality maintenance procedures. Managed the laying of power cables and ensured all installations met the required technical specifications.
  • Proficient AutoCAD Utilization:
    Utilized AutoCAD software extensively for the design, planning, and execution of electrical projects. This enhanced the accuracy, efficiency, and overall quality of project deliverables.
  • Low Voltage (LV) Substation Installation:
    Undertook the installation of Low Voltage (LV) substations, including the installation of 400 KVA x 2 transformers for a connected load of 510.8 KW. Ensured compliance with electrical standards and enhanced the plant's operational efficiency.
  • LV/MCC Panels and APFC Panels:
    Managed the installation and maintenance of LV/MCC (Motor Control Center) panels and APFC (Automatic Power Factor Control) panels, ensuring optimal functionality and energy efficiency.
  • Cables Wiring and Electrical Installations:
    Directed all electrical installations, including cables wiring, to ensure safe and reliable operation of power supply systems.
  • Safe Operation of Power Supply:
    Responsible for the safe operation of power supply systems, including safe startup and shutdown procedures. Ensured continuous and reliable power supply to support plant operations.
  • Maintenance of Power Supply and Machinery:
    Managed the maintenance of power supply systems and machinery, ensuring minimal downtime and optimal performance.
  • Cross-functional Team Collaboration:
    Collaborated effectively with cross-functional teams, ensuring seamless integration of electrical systems within the overall plant operations. This involved regular communication and coordination with various departments to achieve project objectives and operational excellence.
  • Mentorship and Professional Development:
    Provided mentorship and training to junior engineers and maintenance staff. Encouraged a culture of continuous learning, professional growth, and adherence to best practices within the team.
  • Machinery Installation for Bamboo Ply and Flooring Plant:
    Coordinated the installation of machinery for the bamboo ply and flooring plant. Ensured all machines were installed correctly and functioned optimally, contributing to the plant's overall productivity and efficiency.
  • Inspection and Quality Control:
    Conducted pre-inspection tours and quality checks of equipment and electrical panels. Ensured all installations and equipment met industry standards and regulatory requirements. Represented the company during inspections by the Chief Electrical Inspector and Sr. Executive Engineer.
  • Ensured Adherence to Electrical Standards:
    Responsible for undertaking the installation of all electrical works in accordance with electrical standards. Ensured exceptional compliance with regulatory and industry standards, enhancing the safety and reliability of electrical installations.

Assistant Professor

KC GROUP OF INSTITUTIONS
UNA
09.2022 - 03.2023
  • Supervised dissertational research work to assist research publication process.
  • Engaged students in lectures by encouraging sharing of opinions and group interactions.
  • Structured assignments with clear goals and criteria for assessment.
  • Collaborated with fellow staff members to promote positive and welcoming learning environment.
  • Planned class material to engage students in both online and in-person class environments.
  • Developed curriculum, lesson plans, and lab exercises for semester classes.
  • Researched supplemental materials, including books and slides for use in classroom discussions.
  • Advised students in personal matters, driving academics, attendance and behaviors.

Teaching Assistant

Thapar University Patiala
Patiala
07.2020 - 07.2020
  • Assisted in planning and implementing lesson plans in accordance with state curriculum standards.
  • Utilized technology resources such as computers, tablets, projectors and interactive whiteboards.
  • Provided one-on-one support to students requiring additional assistance.
  • Maintained accurate records of student attendance, grades, and behavior reports.

Education

Bachelor of Technology - Electrical Engineering

Maharaja Ranjit Singh Punjab Technical University
Bathinda
08-2022

Master of Engineering - POWER SYSTEMS

THAPAR UNIVERSITY PATIALA
PATIALA
08-2020

Diploma - Electrical Engineering

Govt. Polytechnic Kangra
Kangra
07-2017

High School Diploma -

S.V.N High School Batwar
DADA SIBA
03-2014

Skills

  • LEED accreditation
  • Research and analysis
  • Electrical load analysis
  • Power systems
  • System-level electrical design and integration
  • Object component-oriented software
  • PV-Syst 715
  • MS Office
  • MATLAB Basics
  • SCADA Basics
  • C Language Basics
  • Visio Software
  • Hardware testing
  • Electrical design
  • Product testing
  • Cost estimation
  • Power systems analysis
  • Wiring schematics
  • Fault diagnosis
  • System solutions
  • Staff management
  • Smart grid technologies
  • Power distribution
  • Renewable energy systems
  • High voltage engineering
  • Electrical engineering standards
  • Quality management
  • Electrical safety standards
  • Electrical diagram production
  • Problem-solving
  • Project management

Affiliations

  • Project Management: Successfully managed the installation of a medium voltage substation and HT line and transformer installation at Beaso by Anagram Systems.
  • Mentorship: Provided mentorship and guidance to junior engineers, fostering professional growth and development.
  • Technical Expertise: Conducted technical oversight and quality maintenance for various electrical engineering projects, ensuring adherence to industry standards.
  • Volunteer Work: Participated in community service projects related to electrical infrastructure improvement and maintenance.

Accomplishments

  • Medium Voltage Substation Installation: Successfully managed the installation of a medium voltage substation at Beaso by Anagram Systems.
  • HT Line and Transformer Installation: Spearheaded the installation of HT lines and transformers, enhancing electrical infrastructure.
  • Mentorship: Provided guidance to junior engineers, fostering professional growth.
  • Quality Maintenance: Ensured adherence to industry standards for various electrical engineering projects.

Academic Accomplishments:

  • M.Tech in Power Systems
  • B.Tech in Electrical Engineering
  • Diploma in Electrical Engineering

Awards and Honors:

  • Employee of the Month: Recognized for outstanding performance and dedication.

Certification

  • Electrical Supervisor Authorized by Himachal Pradesh licensing board Shimla
  • Ishant Jagotra Neeraj Jagotra, and Rumanshi Choudhary. "PASSIVE DRIVER CIRCUIT FOR LED 50W. DOI: https://www.doi.org/10.56726/IRJMETS33499.
  • NEW FRAMEWORK OF DESIGN AND ANALYSIS OF COMMERCIAL BUILDING BY USING STAAD PRO “DOI: https://www.doi.org/10.56726/IRJMETS33738”.
  • Pawan Kumar#1, Ishant Jagotra1, Surjit Singh2, Srete Nikolovski3 “New Framework of energy efficiency in buildings with DSM in the presence of PV Generations” 2024. To be published.

Languages

Hindi
First Language
Hindi
Upper Intermediate (B2)
B2
English
Upper Intermediate (B2)
B2

Timeline

Electrical Engineer

Beaso By Anagram systems
04.2023 - Current

Assistant Professor

KC GROUP OF INSTITUTIONS
09.2022 - 03.2023

Teaching Assistant

Thapar University Patiala
07.2020 - 07.2020

Bachelor of Technology - Electrical Engineering

Maharaja Ranjit Singh Punjab Technical University

Master of Engineering - POWER SYSTEMS

THAPAR UNIVERSITY PATIALA

Diploma - Electrical Engineering

Govt. Polytechnic Kangra

High School Diploma -

S.V.N High School Batwar
Ishant jagotra