Summary
Overview
Work History
Education
Skills
Personal Information
Disclaimer
Timeline
Generic
J Shreenath

J Shreenath

Casting yard - Manager
SALEM

Summary

With over 16 years and 10 months of professional experience, skills in the construction of civil infrastructure projects have been finely honed. Successfully completed various projects, including underground and elevated metro rail, precast element casting, flyover, smart city works, expressways (roads and bridges), and specialty buildings. Throughout the career, consistently demonstrated a strong understanding of industry best practices and a commitment to delivering high-quality results. Dedicated to utilizing extensive knowledge and experience to contribute to the success of future projects in the construction industry.

Overview

17
17
years of professional experience
2037
2037
years of post-secondary education

Work History

Casting Yard In Charge

ITD Cementation India Ltd
02.2023 - Current
  • Project Overview: CMRL, Underground metro rail project, C4-UG2, Chennai
  • Project Value - 1856Cr
  • Working as a Casting yard in charge for 4.900Km Underground Tunnel Segments casting works.
  • Construction of 5.800m Tunnel ring segment production work.
  • Segment Mould FAT, SAT performed along with Client.
  • Preparation and getting approval of Method statement of various activities related with casting yard and segment casting.
  • Casting yard entire preparation and establishment for total factory setup includes all shed and stacking and gantry works and Batching plant
  • Various Segment tests performed as per the COC, like SPT (Segment performance test), Trial Ring Assembly for every 1000 rings, Mould Calibration for every 200rings, Segment Grout socket pullout test for every 500rings, Segment Gasket and Glue pull out test performed
  • Preparing monthly, quarterly and yearly program
  • Preparing and submitting 3 months requirement along with the program
  • Attending meeting with Client and Consultant
  • Maximized performance by monitoring daily activities and mentoring team members.

Manager - Section In charge

KEC International Limited
08.2022 - 01.2023
  • Project Overview: Elevated metro rail project Chennai metro rail project.
  • Project cost: 1309Cr.
  • Working as a Section In Charge for 5.1km Viaduct and 3 elevated station (Echangadu, Kovilambakkam, Vellakal) including station building, and ancillary buildings.
  • Utility identification, diversion, and traffic diversion plans preparation.
  • Construction of Pile, Pile cap
  • Casting and Erecting of Pier, Cast in situ pier cap, precast pier cap
  • ADB, Pedestal casting over pier caps
  • U Girder Erection activity and Stressing
  • Station sump works (excavation, Shoring).
  • Pier protection and Crash barrier works and road reinstate
  • Preparing monthly, quarterly and yearly program
  • Preparing and submitting 3 months requirement along with the program
  • Attending meeting with Client and Consultant
  • Transverse stressing (post tensioning) & grouting works of U Girders

Senior Engineer - Execution

Afcons Infrastructure Limited
05.2019 - 07.2022
  • Project Overview: Srinivasa Setu Project, Tirupati: Design, Development, Operation & Maintenance of Elevated Smart Corridor & Smart Streets in Tirupati
  • Project Cost: 730Cr.
  • Working as a Casting yard In-Charge
  • Pre-Casting of Box girder segments for main carriage way and Approach ramps 16.600m, 8.500m, 7.500m, 7.250m
  • Pre-Casting of I-Girders
  • Casting of Friction slab, Fascia panels and RE wall panels
  • Transverse stressing (post tensioning) & grouting works for box girders
  • Additionally looking deck finishing works like Stitch joints, median, Crash barrier and fascia panel erection works
  • Utility identification, diversion, and traffic diversion plans
  • Piers and pier caps, and Abutment works
  • Anti-dislodgement blocks and Pedestal Casting and dirt wall works
  • BBS Preparation and Sub-contractor Billing
  • Attending internal and Client Meetings
  • Liaising with clients, contractors, and designers
  • Mobilization & Casting yard establishment setup works like casting bed, stacking bed, rebar fabrication shed, batching plant, gantry foundations, labour colony and other civil works

Senior Engineer - Execution

Afcons Infrastructure Limited
04.2017 - 05.2019
  • Project Overview: CMRL - UAA-01, Design and Construction of Underground station, Entry exits, and associated tunnels from Washermanpet, Mannadi, Highcourt, Chennai central, Egmore and Mayday Park maintenance shaft
  • Project Cost: 1567Cr.
  • Worked as a Section In-Charge/Station Manager in Underground Metro station and Entry Exit structure by Top down and Bottom-up construction method
  • Also, Overall Reinforcement In-charge for entire Pkg-1, Pkg-5 & Pkg-8
  • Construction of Guide wall, Diaphragm wall, plunged in column
  • Erection of walers and struts and Excavation
  • Construction of Base slab, Concourse slab, Roof Slab inclusive of all related works like water proofing, reinforcement fixing and concrete pouring
  • Construction of all internal elements like machine foundations, MEP Shaft walls, Lifts, Staircases, Escalators, Service rooms, counters, and Toilet bathrooms
  • Completion of all architectural finishing works like Solid block works, Plastering, Tile, Granite fixing, flooring, painting, false ceiling work and gladding works, ACP works
  • Liaising with clients, contractors, and designers
  • Material Reconciliation
  • BBS Preparation and Sub-contractor Billing
  • Attending Client Meeting and internal progress meeting

Engineer - Execution

Afcons Infrastructure Limited
07.2011 - 04.2017
  • Project Overview: CMRL - UAA-01 & UAA-05, Design and Construction of Underground station, Entry exits, and associated tunnels from Washermanpet, Mannadi, Highcourt, Chennai central, Egmore and Mayday park maintenance shaft and UAA-05 Shenoy nagar, Annanagar east, Anna nagar Tower, Thirumangalam and ramp
  • Project Cost: 1561Cr & 1031Cr.
  • Worked as a Shift in charge at Casting yard - Tunnel segments
  • Completed Overall 14900 nos of segments as per stipulated time
  • Planning and monitoring of Pre-Casting of Tunnel Lining segments as per the drawings and methodology
  • Mould checking and assembly
  • Reinforcement cage fabrication and shifting
  • Shuttering, Concreting and demoulding, and finishing
  • Stacking of segments and Transportation to site
  • Casting yard establishment like bed preparation, mould erection, shed preparation, Gantry track preparation, and Segment stacking bed preparation
  • Liaising with clients, contractors, and designers
  • BBS Preparation and Sub-contractor Billing

Structural Engineer

Totem Infra Limited
02.2010 - 07.2011
  • Project Overview: NH - 8, Constructing, strengthening and widening of 4 lane to 6 lane of Gurgaon- Kotputli - Jaipur Expressway BOT Project, Haryana
  • Construction of Flyovers, Major bridges, and Minor bridges
  • Construction of Pile, Pile caps, Piers, Pier caps for Fly overs and ROB
  • Construction of Open foundation, shoring, Piers, Abutments, pier caps for Major and minor bridges
  • Construction and extension of Underpass, PUP, CUP, Box culverts, Pipe culverts
  • Erection of PSC I- Girders in Bridges and deck slab completion, crash barrier and approach slab work & Casting and erection of precast drains, REwalls.

Engineer - Execution

Maytas Infra Limited
05.2008 - 01.2010
  • Company Overview: Strengthening and Extension of 2 Lane to 4 Lane for NH-58 Meerut to Muzaffarnagar, BOT Road Project, Uttarakhand
  • Construction of Pile foundation and Pile caps and Piers
  • Tests conducted for Pile and Piers (Lateral, static, and Dynamic load tests, Sonic logging, Integrity test, UV, Core cutting and Rebound hammer test for Piers)
  • Construction of Pipe and Box culverts
  • Construction, casting and erection of Precast arch culvert over running canal
  • Casting of RE Panels

Education

MBA - Finance & Accounts

Indira Gandhi National Open University
New Delhi, India
05-2026

Post Graduate Diploma - Operational Management

Indira Gandhi National Open University
New Delhi, India
01.2012 - 12.2012

Diploma in Management (DIM) - Human Resources Management

Indira Gandhi National Open University
New Delhi, India
01.2011 - 12.2011

B.E - Civil Engineering

Anna University
Chennai, Tamilnadu
01.2004 - 12.2008

HSC - undefined

St. Paul's Higher Secondary School
Salem, Tamilnadu
01.2002 - 12.2004

SSLC - undefined

St. Paul's Higher Secondary School
01.2001 - 12.2002

Skills

Friendly, positive attitude

Teamwork and collaboration

Risk Mitigation Strategies

Deadline-Oriented Time Management

Auto Cad

Microsoft office

Personal Information

  • Passport Number: NWJK0097J
  • Father's Name: M. Jeganathan
  • Mother's Name: J. Periyanayaki
  • Date of Birth: 28/07/1987
  • Marital Status: Married

Disclaimer

I hereby declare that the above information is true to the best of my knowledge.

Timeline

Casting Yard In Charge

ITD Cementation India Ltd
02.2023 - Current

Manager - Section In charge

KEC International Limited
08.2022 - 01.2023

Senior Engineer - Execution

Afcons Infrastructure Limited
05.2019 - 07.2022

Senior Engineer - Execution

Afcons Infrastructure Limited
04.2017 - 05.2019

Post Graduate Diploma - Operational Management

Indira Gandhi National Open University
01.2012 - 12.2012

Engineer - Execution

Afcons Infrastructure Limited
07.2011 - 04.2017

Diploma in Management (DIM) - Human Resources Management

Indira Gandhi National Open University
01.2011 - 12.2011

Structural Engineer

Totem Infra Limited
02.2010 - 07.2011

Engineer - Execution

Maytas Infra Limited
05.2008 - 01.2010

B.E - Civil Engineering

Anna University
01.2004 - 12.2008

HSC - undefined

St. Paul's Higher Secondary School
01.2002 - 12.2004

SSLC - undefined

St. Paul's Higher Secondary School
01.2001 - 12.2002

MBA - Finance & Accounts

Indira Gandhi National Open University
J ShreenathCasting yard - Manager