Summary
Overview
Work History
Skills
Education And Qualification
Professional Highlights
Personal Information
Strengths And Achievements
Languages
Hobbies and Interests
Disclaimer
Timeline
Generic

JAGATHEESAN R

Bangalore

Summary

A result driven professional with 12 Years of rich experience in Project Management, Monitoring, Project- Planning, Cost Controlling, Site Engineering & Quality control. Presently posted as Modernization Executive in Otis Elevator Company (I) Ltd. (Bangalore). Have acquired Trainings, New skills & Expertise in each Job Successfully. Possess excellent communication with exceptional interpersonal, problem solving, leadership, team-building & skills. Sound analytical ability to access a given situation with patience and perseverance.

Overview

12
12
years of professional experience

Work History

Modernization Executive

Otis Elevator Company (I) Ltd.
Bangalore
09.2016 - Current

HANDLING

  • Survey to check feasibility for modernization,
  • Loading for manufacture,
  • Site preparation,
  • Logistics,
  • Manpower Identification,
  • Installation,
  • quality Control ,
  • Safety,
  • Commissioning,
  • Internal and External Inspections,
  • Statutory Compliances and
  • successful handing over of the product.

PROJECTS HANDLING:

  • Handling Leela Palace-Bangalore, The Five star hotel, dismantling the existing below machine room elevators and installing a New Gen2 Elevators compraising 18 units.
  • Handling SAP India Pvt Ltd-Bangalore, Comprising 11 units with destination controll system.
  • Handling Infosys Limited-Bangalore, Corporate office comprising 12 units -Retaining Car,Cwt rail in position and installing glass door and cabin with new controller to achieve customer asthetic and performance requirements.
  • Handling Park west by Shapoorji Pallonji - Bangalore, A high rise residential apartment comprising 3 units retaining entrance in position and modernising from 13P to 17P capacity with 1.75MPS to 2MPS apeed.
  • Handling L&T-Module x-Mysore, Having 5 units doing floor extension works.
  • Handled a project Krishna Nagar Apartment compraising 5 units ,Retained Car,Cwt rail in position with car and counter frame,modernised to belt technology from conventional rope system with Gen2 motor and controller.
  • Handled a project National Games Village-Bangalore, Modernised 2 speed elevator with VVVF drive to acheive smooth stoping, Leveling accuracy and smooth door operation with minimal power consumption.
  • Handled Hindalco Industries Limited-Belgaum, dismantled the lift installed in 1968,retained Counter rails in position modernised 1000Kg capacity into 1224Kg with Dust proof Equipments.
  • Handled Ultra Tech Cement – Thadipatri, Modernised the 112 meter high rise goods elevator provided dust proof equipments with VVVF drive to attain the smooth stoping and leveling accuracy.
  • Handled Baba Automic Research Centre ( BARC ) – Mysore, Modernised the front and rear door 2.5 ton goods elevator provided new car and landing gates with VVF drive controller.
  • Handled Prestige Ferroz-Bangalore, Modernised high rise elevator to Increasing the speed from 1.5MPS to 1.75MPS by providing new car and governor with Gen2 Motor adding 2 floors.
  • Handled the Project Wipro Limited-Bangalore Head Corporate Office, provided Destination Controll system with Regen Drive and motor , which had reduced the traffic by 30%, comprised 6 units.
  • Handled Hindustan Unilever Limited-Mysore, Hindustan Unilever Limted-Hosur,Nestle India Limited-Mysore,where Installed and handed over the Dustproof equipments with vertical Byparting door in Indusrial Goods elevators.
  • Handled many single units modernised to Manual to Auto door retained the existing motor with rope and Car and Cwt rails in position.
  • Handled 25 plus units of floor extension jobs, adding landings to top or bottom to the existing lift .

Project Engineer - Installation

Fujitec India Private Limited
Bangalore
06.2014 - 08.2016
  • PROJECTS HANDLED:

Vaswani Reserve, Purva Sky Dale, Prestige Silver Crest, Prestige Jade Pavilion, Prestige Tech Platina, Prestige Trinity Centre, Sattva Eminence, Prestige Silver Sun.

Installation Engineer

SINAR Engineering pvt limited
12.2011 - 05.2014
  • PROJECTS HANDLED:

As a installationEengineer installed multibrand elevators namely OTIS, Hitachi,Thyssen Krup and Johnson at the following sires-Mantri-Pinnacle, Hira Nandhini Group-Hirco palace Gardens, Home elevators in Tamil Nadu, Chennai Metro Rail Corporation Ltd, Olympia Technology park, Sathya Sai Hospital.

Skills

  • Windows
  • Excel
  • MS Office & Internet Applications
  • Strong vision and willingness to work hard to take the Organisation into a level of desired fame by exhibiting high standards and performance, benchmarked against the best in the sector
  • Monitoring and controlling the Operations management
  • Ability to work independently with minimal supervision and attain group goals
  • Strong organizational and interpersonal skills, including the ability to prioritize workload
  • Possesses the ability to deal effectively with a variety of personnel and executive leadership

Education And Qualification

  • Bachelor of Engineering, Electronics & Communication Engineering, Anna University, 2007 - 2011, Chennai, India
  • H.S.C, 2007, State Board of Tamil Nadu, India
  • S.S.L.C, 2005, State Board of Tamil Nadu, India

Professional Highlights

Having a combination of General administration and management with strength in high-tech corporate system. During the assignment in Organisation has been involved from the inception to establishment of many task and responsibities, wherein has implemented many functions rigidly and successfully too. With this varied experience of 12 Years has worked in many responsible positions driving the functions of the organization.

Personal Information

  • Father's Name: Mr. Rajendran
  • Date of Birth: 12/04/89
  • Gender: Male
  • Nationality: Indian

Strengths And Achievements

  • Technical and product knowledge
  • Confidence
  • Communicative ability
  • Event management.
  • Awarded highest modernization jobs completions in all India level (Otis elevator-2017)
  • Safe Workman award (Otis elevator-2018)

Languages

  • Tamil
  • Kannada
  • Hindi
  • English

Hobbies and Interests

  • Listening music
  • Reading newspaper

Disclaimer

I assure that the above details are correct and complete to the best of my knowledge. I am also confident of my work in team.

Timeline

Modernization Executive

Otis Elevator Company (I) Ltd.
09.2016 - Current

Project Engineer - Installation

Fujitec India Private Limited
06.2014 - 08.2016

Installation Engineer

SINAR Engineering pvt limited
12.2011 - 05.2014
JAGATHEESAN R