Summary
Overview
Work History
Education
Skills
Certification
Disclaimer
Timeline
Generic

Jaswanth Kumar B

Visakhapatnam

Summary

Results-driven CETP Operations Engineer with a proven track record at Adhistan.Pvt. Ltd., optimizing chemical dosing and enhancing operational efficiency. Skilled in Power BI for process monitoring and team leadership, achieving a 20% increase in sludge dryer capacity while ensuring 100% compliance with PCB marine discharge standards.

Overview

6
6
years of professional experience
1
1
Certification

Work History

CETP Operations Engineer

Adhistan.Pvt. Ltd.
Visakhapatnam
12.2020 - Current
  • Managed end-to-end CETP operations (5 MLD) including biological, tertiary and sludge handling systems.
  • Optimized chemical dosing using jar test results and reduced chemical consumption by ~12%.
  • Led team of 10+ operators and ensured 100% PCB marine discharge compliance for 24+ months.
  • Developed SOPs and operational procedures in line with ISO 14001 standards.
  • Reduced monthly OPEX by 10–15% using Power BI dashboards for process monitoring.
  • Supervised operation and maintenance of solar sludge dryers using HMI-based controls.
  • Tracked and documented sludge generation, dryer feed quantity and drying efficiency.
  • Conducted SV30, MLSS/MLVSS analysis to improve activated sludge performance.
  • Coordinated with maintenance, logistics, and procurement departments for seamless plant functioning.
  • Coordinated maintenance schedules for machinery to minimize downtime and ensure reliability.
  • Collaborated with cross-functional teams to address operational challenges effectively.
  • Monitored system performance metrics and identified potential bottlenecks to ensure optimal operations.
  • Maintained detailed documentation of all changes made to the systems environment including backup and restore processes.

Key Achievements:

  • Commissioned new sludge dryer section with 20% increase in capacity.
  • Received recognition for process optimization reducing downtime by 18%.

Water Treatment Plant In-Charge (UF-RO)

Voltas Ltd.
Angul
01.2020 - 12.2020
  • Independently handled UF & RO systems, including chemical cleaning and troubleshooting.
  • Initiated new CAPEX proposals with detailed ROI analysis to improve filtration capacity.
  • Carried out preventive maintenance programs for pumps, valves, membranes.
  • Maintained safe operations under EHS norms with regular safety audits and toolbox talks.
  • Implemented KAIZEN techniques leading to 8% process efficiency gain.
  • Conducted daily coordination meetings and submitted reports to management.
  • Contributed innovative ideas and solutions to enhance team performance and outcomes.
  • Worked with cross-functional teams to achieve goals.
  • Collaborated closely with team members to achieve project objectives and meet deadlines.

Key Achievements:

  • Reduced RO membrane fouling frequency by improving pre-treatment efficiency.
  • Reduced water rejection ratio by fine-tuning cleaning and recovery settings.

Education

Bachelor of Technology - Mechanical Engineering

GMR Institute of Technology
Rajam, AP
01.2015

Diploma in Mechanical Engineering -

Govt. Polytechnic
Srikakulam
01.2012

SSC - 10th Grade

Board of Secondary Education
AP
01.2009

Skills

  • ETP/CETP Operations (Biological Tertiary Treatment)
  • UF,RO,MBR
  • Solar Sludge Dryer Operations
  • Chemical Dosing & Jar Test Analysis
  • HMI/SCADA Operations & Troubleshooting
  • Maintenance Planning & Execution
  • Power BI Dashboard Creation (Monthly Reports)
  • AutoCAD (Basic Layouts)
  • MS Excel (Pivot Tables, Trends, Reports)
  • Team Management & Shift Supervision
  • ISO 14001:2015 Internal Auditor
  • Permit to Work (PTW)
  • CAPEX & OPEX Monitoring
  • Chemical dosing optimization
  • Process monitoring
  • Equipment maintenance
  • SOP development
  • Sludge handling
  • EHS compliance
  • Data analysis
  • Project management
  • Team leadership
  • Regulatory compliance
  • Operational efficiency
  • Safety maintenance
  • ISO standards
  • KPI tracking
  • Cost reduction

Certification

  • Safety Education & Training, 1 Year, SBTET, 11/01/25, Fire Prevention, HIRA, MSDS, OSHA, BIS Standards.
  • ISO 14001:2015 Internal Auditor Certification

Disclaimer

I hereby declare that the information given above is true and correct to the best of my knowledge and belief., Visakhapatnam, ___________, B Jaswanth Kumar

Timeline

CETP Operations Engineer

Adhistan.Pvt. Ltd.
12.2020 - Current

Water Treatment Plant In-Charge (UF-RO)

Voltas Ltd.
01.2020 - 12.2020

Bachelor of Technology - Mechanical Engineering

GMR Institute of Technology

Diploma in Mechanical Engineering -

Govt. Polytechnic

SSC - 10th Grade

Board of Secondary Education
Jaswanth Kumar B