Summary
Overview
Work History
Education
Skills
Timeline
Generic

JAYESHKUMAR CHAUHAN

Ahmedabad

Summary

Dynamic professional with extensive experience at Adani Total Gas Limited, excelling in technical surveys and emergency response. Proven track record in managing inventory and coordinating procurement to ensure operational readiness. Adept at collaborating with teams to enhance safety and efficiency, demonstrating strong leadership in high-pressure situations.

Overview

3
3
years of professional experience

Work History

ADANI TOTAL GAS LIMITED

Adani Total Gas Limited
Ahmedabad
08.2022 - Current
  • Preventive Maintenance: Planned and executed routine maintenance for 30 DRS units and 300 km of MS pipelines, ensuring regulatory and safety compliance.
  • Cathodic Protection (CP) System Maintenance: Maintained and monitored cathodic protection equipment, such as TR Units, TLPs, and Insulating Joints (IJ). Performed technical surveys, like CIPL, DCVG, CAT, and AC/DC interference surveys, to evaluate pipeline corrosion protection and implement corrective actions.
  • Emergency Handling: Led on-ground response for gas escape in steel pipeline incidents and DRS breakdowns, ensuring rapid isolation, containment, and restoration of service with minimal downtime.
    Coordinated with internal teams and emergency services during major incidents to safeguard public and asset safety.
  • Inventory & Material Management: Managed inventory of essential spares, CP equipment, pipeline materials, DRS spare parts, and safety gear to ensure operational readiness.
    Worked closely with procurement and stores to maintain just-in-time stock levels for both planned and unplanned activities.
  • Team Coordination & Reporting: Supervised field technicians and contractors, ensuring safety and operational standards were consistently met.
    Maintained thorough documentation of all maintenance activities, CP survey results, and performance reports.

CARRER ACHIEVEMENTS:

Led the MS O&M department in Ahmedabad, GA, as an in-charge from January 2023.

Successfully completed major online shutdown on steel pipeline, i.e., hot tapping, stopple operations, and critical steel pipeline hook-up.

Completed 20 hookups on the online steel pipeline network.

Commissioned 35 km (228 IK) of steel pipeline, 3 district regulating skids, and 12 online CNG stations.

Education

B.Tech - Mechanical Engineering

SVNIT
SURAT

12th Science

St.Ann's School
Ahmedabad

10th

Jawahar Navodaya Vidyalaya
Banaskantha

Skills

  • Technical surveys
  • Emergency response
  • Inventory management
  • Procurement coordination
  • Team collaboration
  • Software: SAP MM, SAP PM, SAP Ariba

Timeline

ADANI TOTAL GAS LIMITED

Adani Total Gas Limited
08.2022 - Current

B.Tech - Mechanical Engineering

SVNIT

12th Science

St.Ann's School

10th

Jawahar Navodaya Vidyalaya
JAYESHKUMAR CHAUHAN