Summary
Overview
Work History
Education
Skills
Interests
TRAINING AND APPRENTICESHIP
Disclaimer
AREA OF KNOLAGE
Timeline
Generic
JIGNESH JAYVADANBHAI PATEL

JIGNESH JAYVADANBHAI PATEL

SURAT

Summary

To work in a progressive organization that incorporates varied spectrums of work & diversity, this endows consistency, competency & expertise in professional as well as social spheres, enabling collective excellence and technical growth, personal fulfillment with welcome attitude for new ideas and concepts to enhance the overall growth of the organization.

Pro-active and result oriented an Electrical Engineer. Total Professional experience is 18.4 years in the Power Plant Operation and Maintenance. Presently working as Executive Turbine operation and maintenance in Power Plant with AMAL SPECIALITY CHEMICAL LIMITED at ankleshwar.

Overview

19
19
years of professional experience
1
1
Language

Work History

Executive Turbine Operation & Maintenance

Amal Speciality Chemical Ltd.
04.2022 - Current
  • Presently working as Executive Turbine operation and maintenance in Power Plant with AMAL SPECIALITY CHEMICAL LIMITED at ankleshwar.
  • Plant: Power Plant

Shift In charge

ONGC CPF PLANT Gandhar
06.2019 - 04.2022
  • Client: Prabha continues utilities service / Shailja Enterprise
  • Plant: Combine Cycle Power Plant

Shift Engineer

Gujarat FluoroChemical Limited
08.2010 - 04.2019
  • Client: Fuji technical services Pvt. Ltd.
  • Plant: Power Plant

Shift Engineer

The Colourtex industries Ltd.
09.2007 - 08.2010
  • Plant: Power Plant

Operator

Navin Fluorine Ltd.
08.2006 - 09.2007
  • Client: Green power international Pvt. Ltd
  • Plant: Power Plant

Education

S.S.C - SOCIAL/SCIENCE

G.S.E.B
01.2001

D.E.E - MACHINE-1/ E.C

T.E.B
01.2004

Skills

Strong leadership skills with an ability to motivate teams in achieving targets and goals

undefined

Interests

Hobby :- Carrom, Cricket and Reading

TRAINING AND APPRENTICESHIP

  • ORGANIZATION :- VIKRANT TRANFORMERS, MAROLI
  • DURATION :- 15 – Days (Full Time)
  • AREAS OF EXPOSURE :- Production & Maintenance of all types X’mer.
  • ORGANIZATION :- UTRAN POWER PLANT SURAT
  • DURATION :- 1 Year Full time

Disclaimer

I, hereby, declare that all the above furnished information is true to the best of my knowledge and belief. If given an opportunity I would prove myself worthy for the said post and ensure to serve the organization with utmost integrity sincerity. Thanks & Regards, JIGNESH JAYVADANBHAI PATEL PLACE :- SURAT DATE :-

AREA OF KNOLAGE

  • 1. Operation & maintenance of Steam Turbine (Triveni) and GAS TURBINE (SOLAR) Taurus T60, Taurus T70 and Titan130 units, for trouble free operation.
  • 2. Knowledge about HT/LT Synchronization of GT and STG with Grid and other units.
  • 3. Operation of Steam Turbine (Triveni & BHEL) and GAS TURBINE BHEL, Taurus T60, Taurus T70 and Titan130 (SOLAR) units, for trouble free operation.
  • 4. Continuously monitor the Panel & trends of critical parameters.
  • 5. Ordering spares follow up with purchase department keeping stringent inventory control for smooth & trouble free operation of plant.
  • 6. Knowledge about Gas Turbine dismantling and assembling.
  • 7. Knowledge about Gas Turbine and Steam turbine dismantling and assembling.
  • 8. Knowledge about Combine Cycle Power Plant and PRDS.
  • 9. Coordinate system shutdown and start up STG, GAS based power plant.
  • 10. To study & analyses Daily & Monthly reports of power plant regarding electric Power Generation, Steam generation, Fuel consumption, Energy consumption, Steam distribution, Plant Efficiency, Unit Cost, etc.
  • 11. Erection and commissioning of Electrical panels.
  • 12. Maintenance of 22KV, 11KV & LT, HT Switchgears.
  • 13. Maintenance of Motors, Transformers, Battery Charger, Battery, PCC, MCC & DG Sets.
  • 14. Testing of Generator, Relay, Power Transformer, Aux X’Mer, HT, LT Breaker & Panels.
  • 15. Operation & Maintenance of LT Motors, HT Motors & LT, HT Breakers.
  • 16. Star Delta Starter, DOL Starter Power wiring & control wiring, line diagrams, plant & House wiring.
  • 17. Looking for smooth & trouble free operation & preventive as well as break down maintenance of all power plant electrical equipments.
  • 18. Knowledge about Process Equipment such as a Temperature/Pressure Transmitter Thermocouple, RTD, AC Drives & PLC etc.
  • 19. Looking for smooth, trouble free operation & preventive as well as break down maintenance of Gas based Engine (Deutz) and electrical equipments.
  • 20. Gas Engine E-30, E-40, E-50, E-60, E-70 maintenance.
  • 21. Maintenance includes overhauling of plant equipment, oil change, tappet-Setting, checking auxiliaries like HT pump, LT pump, ventilation blowers, ventilation pump, Radiator fans etc.
  • 22. Look after distribution network and its trouble shutting.

Timeline

Executive Turbine Operation & Maintenance

Amal Speciality Chemical Ltd.
04.2022 - Current

Shift In charge

ONGC CPF PLANT Gandhar
06.2019 - 04.2022

Shift Engineer

Gujarat FluoroChemical Limited
08.2010 - 04.2019

Shift Engineer

The Colourtex industries Ltd.
09.2007 - 08.2010

Operator

Navin Fluorine Ltd.
08.2006 - 09.2007

S.S.C - SOCIAL/SCIENCE

G.S.E.B

D.E.E - MACHINE-1/ E.C

T.E.B
JIGNESH JAYVADANBHAI PATEL