A professionally qualified B.E Aeronautical Engineer with below experience in the domains of Wide Body Aircraft, Narrow Body Aircraft, Charter Aircraft, Helicopters & ELV Systems. I hold a keen interest in joining an organization that utilizes my subject matter expertise in these domains.
Overview
12
12
years of professional experience
4
4
Languages
Work History
Planning Engineer
Airbus Group India Private Limited
06.2022 - Current
Forecast maintenance requirements
Responsible for generation and scheduling all maintenance tasks as required by the Operators Aircraft Maintenance Program (AMP) for accomplishment in a timely manner and ensure optimization
Prepare detailed guidance and necessary information with maintenance instructions for generating work orders and work packages
Responsible for release of work package for checks
Responsible for tracking all maintenance checks
Coordinate with Line Maintenance or outsourced MRO to ensure compliance of scheduled maintenance
Organize Daily Production Planning meeting
Determines the priority of maintenance tasks for operator's scheduled in-service aircraft
Monitor the compliance of Routine Maintenance packages as per AMP/Company procedure, as applicable and take appropriate action for any deferred tasks
Resolve operational queries from other departments, Operator and MROs
Plan and coordinate with associated departments for all jobs to be carried out an Operator's fleet to ensure availability of manpower, material, tools and equipment, downtime and necessary paperwork
Control and adjust plans based on day-to-day status report on maintenance check highlighting any significant deviation from plan
Schedule, monitor and compliance of service bulletins, Airworthiness Directives and Engineering Orders
Planning Officer
AAR Indamer Technics Pvt Ltd
03.2021 - 05.2022
Responsible to provide all the necessary work orders and physical copies of task cards to certifying staff, which are part of the work package for the execution
Ensuring technical publications upload all the relevant technical literature for the base maintenance aircraft is current on the server
Follow up with technical services for getting the list of critical maintenance tasks
Getting work package declaration signed & aircraft delivery certificate from the customer
Preparing arrival file for the aircraft maintenance check
Preparation of status for the day-wise cards issued to maintenance versus the cards completed and received back to dock
Ensuring the copies of CRS, WPAR, Post EGR report (If any) and any other departure documents are scanned and mailed to the customer and internal team members
Responsible for the handover of the completed work pack to the customer post completion of maintenance of the aircraft
Printing all task cards along with the MH and Material Recording sheet and carrying out the stamping as necessary
Tracking and positioning the materials required for the check package within the required date and coordinating with the customer, material planner, and maintenance team
Creating work package in ERP (STAAR) and upload task-wise preload in ERP (STAAR) for the scope of work and circulate to all concerned
Issuing the day-wise task cards to maintenance and tracking of same for the completion
Scrutinize the completed task cards in accordance with MOE, regulations, and customer briefing on paperwork
Preparing a list of discrepancies if any in task cards and getting the same corrected by the maintenance team
Updating daily progress reports and IRC listings to the customer and internal team
Carrying out any other task as directed by the superior
Junior Technical Officer
Indamer Aviation Pvt Ltd
06.2019 - 02.2021
Preparation/amendment of AMP as per latest Issue and Rev of Maintenance data and its distribution to all concerned personnel
Preparation of Test Flight Schedule & getting approval from local regulatory (DGCA)
Preparation of Pre-flight, Post-flight task card, and dent & buckle chart
Maintaining a technical Library
Monitoring & tracking technical publications for the latest Issue and Rev
In MPD, AMM & EMM
Preparation/ amendment of Schedules as per latest Issue and Rev of Maintenance data & approved AMP and its distribution to all concerned personnel
Preparation of documents and organizing for AMP review meetings
Issue of 'NIL revision' letter/ certificate
Updating of AMP tracking sheet
Forwarding and following up with technical services/AME for getting the list of critical maintenance tasks
Technical Assistant
Air India Ltd
05.2018 - 05.2019
Delay investigation for Delay/Defect Analysis Committee Meeting (DDACM)
Assisted in the action of Service Bulletin (SB), Service Letter (SL), Airworthiness Directive (AD) and Callout preparation related to the technical service department
Documentation related to delay meeting such as a collection of delay reports, snag sheets, sector reports, and CRF forms using RAMCO Aviation Software
Preparation of DDACM Minutes, Incident Report & SQUAWKS
Preparation of online application for renewal of radio wireless license
Assisted in preparation of documentation for MOD meeting
Familiarized with AHM, AMM, FIM, FTD, and Maintenance tips
Updating of the LSAP (Loadable Software Airplane parts) for B787-8
Project Engineer
AV Pro LLC
05.2014 - 06.2016
Company Overview: Clients - Apple Inc, Dior, Chanel, Sephora, Lacoste, Louis Vuitton, Christian Louboutin, Le Meridien, Hilton & Emaar group
Discussing proposals with clients
BOQ generation and Estimation of the project
Preparing Quotations, Layouts, Drawings, and Preliminary Sketches
Shop drawing generation and follow up for approval
Material ordering and confirmation of delivery to the site
Testing and commissioning of Controllers as per approved SOP
Inspection and System Handover to client
Clients - Apple Inc, Dior, Chanel, Sephora, Lacoste, Louis Vuitton, Christian Louboutin, Le Meridien, Hilton & Emaar group
Site Engineer
Usha Engineering Works
05.2013 - 02.2014
Company Overview: Client - Furnace Fabrica India Ltd
Fabrication, Erection, and Dismantling of Ducts, Structures, and Columns
Planning and Executing of the Manpower and Work Schedule
Effective utilization of resources like man, machine & material for assembly
Supervising and ensuring that it was in accordance with the company's standards
Monitoring assembly, testing & dispatching within the planned date
Client - Furnace Fabrica India Ltd
Education
B.E - Aeronautical Engineering
Bachelor of Engineering - Aeronautical Engineering
Anna University
Chennai
04.2001 -
Skills
Boeing Fleet web portal
Profile - Career Objective
A professionally qualified B.E Aeronautical Engineer with experience in Wide Body Aircraft, Narrow Body Aircraft, Charter Aircraft, Helicopters & ELV Systems. Keen interest in joining an organization that utilizes my subject matter expertise in these domains.
Personal Information
Passport Number: W56482990
Father's Name: Mohan G (Late)
Mother's Name: Jayalekha N
Date of Birth: 12/12/89
Gender: Male
Nationality: Indian
Marital Status: Married
Training
Airbus 320 FAM Level 1 Training
Human Factors, & MOE Training
CAR M Training
Safety Management System (SMS) Training
Security Awareness Training
Disclaimer
I hereby declare that the information contained herein is true and correct to the best of my knowledge and belief.
Timeline
Planning Engineer
Airbus Group India Private Limited
06.2022 - Current
Planning Officer
AAR Indamer Technics Pvt Ltd
03.2021 - 05.2022
Junior Technical Officer
Indamer Aviation Pvt Ltd
06.2019 - 02.2021
Technical Assistant
Air India Ltd
05.2018 - 05.2019
Project Engineer
AV Pro LLC
05.2014 - 06.2016
Site Engineer
Usha Engineering Works
05.2013 - 02.2014
Bachelor of Engineering - Aeronautical Engineering
Procurement Specialist - Corporate Service at Airbus Group India Private LimitedProcurement Specialist - Corporate Service at Airbus Group India Private Limited