Summary
Overview
Work History
Education
Skills
It Technical Skills
Languages
Timeline
Generic
JOBIN JAMES

JOBIN JAMES

Kottayam

Summary

Highly skilled professional with 12+ years of experience in Refinery and Petrochemical industries, specializing in shutdown projects. Proficient in application, erection, construction supervision, execution, planning, resource planning, quality control and assurance, and maintenance job work related to Refinery operations. Possesses a strong understanding of Progress Monitoring and Reporting for efficient project management. Demonstrates extensive knowledge in monitoring progress and taking necessary actions to improve project outcomes. Expert in inspecting work according to drawings with adherence to quality standards and certifying subcontractor bills. Adept at reconciling materials in daily fabrication and erection data for accurate project updates.

Overview

12
12
years of professional experience

Work History

SITE ENGINEER – Piping

Larsen & Toubro Ltd. (SAUDI ARAMCO PROJECT)
KSA,Saudi Aramco's Ju'aymah NGL Plant (Remote)
02.2022 - 10.2024
  • Attended project planning meetings to coordinate mechanical system designs with structural and architecture teams, mitigate design conflicts and coordinate delivery timelines.
  • Applied Aramco code requirements to production, It will increase production.
  • Used Aramco manufacturing principles to develop, evaluate and improve manufacturing methods.
  • Liaised between field supervisors and trade workers align construction projects with drawings and specifications.
  • Supervised assembly and installation of piping system
  • Analyzed job cost reports to verify within budget production.
  • Conducted critical pre-installation conferences with consultants and client's representatives.
  • Collaborated with construction administration consultants to schedule field observations.
  • Scheduled utility service providers according to project timelines.
  • Implemented systems to improve process efficiency and reduce project duration.

SITE ENGINEER – Piping

Larsen & Toubro Limited (HPCL VRMP PROJECT)
Visakhapatnam, India
03.2020 - 01.2022
  • Interpretation of drawing and guiding the contractor to execute the work
  • Checking fit up, arranging resource
  • Selection and issue of required material as per the drawings and codes
  • Ensure the work is carried out as per standers, drawings, maintaining quality and safety
  • Make necessary piping execution documents
  • Responsible for material follow-up for continues supply and smooth fabrication as well as erection
  • Preparation of inspection test pack and getting punch point clearance

SITE ENGINEER – Piping

Larsen & Toubro Limited (Farabi Petrochemical Pro)
Saudi Arabia, Yanbu
11.2018 - 02.2020
  • Fabrication and Erection of piping (CS, LTCS, SS & AS) and Piping supports
  • Preparing Loop files
  • Loop Mechanical clearance, Hydro testing, Pneumatic (AIR), box up and system clearance
  • Planning and monitoring the site construction activities including manpower planning, Resources planning and Material planning
  • Issue of MIN & ensure that the contractor gets the material issued from stores to generate continuous work front
  • Carrying out execution as per the set targets and monthly / weekly plan with the available manpower and resources
  • Maintained daily reports to Managers for the progress of projects
  • To control the execution drawing within in the project
  • Check if the latest constriction drawing is used
  • Establish effective communication with clients’ peers and Supervisor
  • Preparing field & design change notes
  • Satisfy or exceed minimum quality requirement

SITE ENGINEER – Piping

Larsen & Toubro Limited (GSFC Melamine Project)
Gujrat, India
07.2017 - 11.2018
  • Issue of MIN & ensure that the contractor gets the material issued from stores to generate continuous work front
  • Carrying out execution as per the set targets and monthly / weekly plan with the available manpower and resources
  • Maintained daily reports to Managers for the progress of projects
  • To control the execution drawing within in the project
  • Check if the latest constriction drawing is used
  • Establish effective communication with clients’ peers and Supervisor
  • Preparing field & design change notes
  • Satisfy or exceed minimum quality requirement

SITE ENGINEER – Piping

Larsen & Toubro Limited (HMEL Shutdown Project)
Punjab, India
12.2016 - 06.2017
  • Execution of Shutdown and Turnaround activities, monitoring and control within planning schedule
  • Preparation of manpower schedule, work schedule and expected completion date
  • Ensure Shutdown jobs execution as per schedule
  • Review contractor’s manpower, site mobilization, tools, and equipment’s etc
  • Preparation of daily reports and project close out report

SITE ENGINEER – Piping

Larsen & Toubro Limited (Ethane Tank Project RIL)
Gujrat, India
04.2016 - 12.2016
  • Job planning and execution of Piping in cryogenic ethane storage tank inlet & discharge unit
  • Review of Job specification and P&ID of both Vendor and Client
  • Preparation of manpower schedule, work schedule and expected completion date
  • Check for Repairs, Damages, Internal Cleanliness of Package Spools, Equipment’s, Inline Equipment’s, Valves, fittings and rectification if required so
  • Checking flange parallelism and alignment of spools with compressor nozzles, intercooler nozzle, Steam Turbine Nozzle, Expander nozzle

SITE ENGINEER – Piping

BILFINGER NEO STRUCTO Pvt Ltd(PTA-6 Expansion RIL)
Mangalore, India
06.2012 - 03.2016
  • Job planning and execution of Piping in cooling tower
  • Review of Job, Specification, Drawings and Scope of work involved
  • Carrying out execution as per the set targets and monthly / weekly plan with the available manpower and resources
  • Follow up with contractors to mobilize the required manpower and resources to achieve the set targets
  • Issue of MIN & ensure that the contractor gets the material issued from stores to generate continuous work front
  • Compliance of ISO Clearance & Loop Box up – Check & verify the loop status
  • Highlighting the requirements, precautions and shortcomings in weekly contractors meeting

SITE ENGINEER – Piping

Bilfinger Industrial SeMRPL ONGC PROJECT)
Mangalore, India
10.2013 - 01.2014
  • Ensured implementation of piping drawings and plans on site
  • Supervised proper working on site of complex projects
  • Scheduling of jobs to the workers on regular basis
  • Responsible for implementing and renewing drawings and layouts
  • Maintained daily reports to Managers for the progress of projects

DIPLOMA TRAINEE

Bilfinger Industrial Services (POY Project RIL)
Gujrat, India
06.2012 - 10.2013
  • Check and consult spool delivery in site
  • Check work front and coordinate with other discipline
  • To control the execution drawing within in the project
  • Check if the latest constriction drawing is used
  • Piping internal inspection witness for large, big bore piping
  • Ensure the permits (confined space, welding, grinding, erection, height work)
  • Check flange alignment
  • Follow up of punch work

Education

DIPLOMA IN MECHANICAL ENGINEERING - Mechanical Engineering

UDAYA INSTITUTE OF TECHNOLOGY.
TAMIL NADU
01.2012

12th Board -

GOV.HSS, PUTHUVELLY
01.2009

10th Board -

ST. AUGUSTIAN’S HS
01.2007

Skills

  • Piping execution process
  • Spooling
  • Pipe fabrication
  • Erection
  • Welding processes
  • HT procedures
  • Piping codes
  • ASME 313
  • Pipe fitting requirements
  • P&ID
  • Codes & Standards
  • Piping drawings
  • Teaming
  • Effective Execution
  • Health and Safety

It Technical Skills

  • Plant design and management system (PDMS)
  • AUTO CAD
  • Software packages like MS Word, MS Excel

Languages

English
Hindi
Malayalam
Tamil

Timeline

SITE ENGINEER – Piping

Larsen & Toubro Ltd. (SAUDI ARAMCO PROJECT)
02.2022 - 10.2024

SITE ENGINEER – Piping

Larsen & Toubro Limited (HPCL VRMP PROJECT)
03.2020 - 01.2022

SITE ENGINEER – Piping

Larsen & Toubro Limited (Farabi Petrochemical Pro)
11.2018 - 02.2020

SITE ENGINEER – Piping

Larsen & Toubro Limited (GSFC Melamine Project)
07.2017 - 11.2018

SITE ENGINEER – Piping

Larsen & Toubro Limited (HMEL Shutdown Project)
12.2016 - 06.2017

SITE ENGINEER – Piping

Larsen & Toubro Limited (Ethane Tank Project RIL)
04.2016 - 12.2016

SITE ENGINEER – Piping

Bilfinger Industrial SeMRPL ONGC PROJECT)
10.2013 - 01.2014

SITE ENGINEER – Piping

BILFINGER NEO STRUCTO Pvt Ltd(PTA-6 Expansion RIL)
06.2012 - 03.2016

DIPLOMA TRAINEE

Bilfinger Industrial Services (POY Project RIL)
06.2012 - 10.2013

12th Board -

GOV.HSS, PUTHUVELLY

10th Board -

ST. AUGUSTIAN’S HS

DIPLOMA IN MECHANICAL ENGINEERING - Mechanical Engineering

UDAYA INSTITUTE OF TECHNOLOGY.
JOBIN JAMES