Summary
Overview
Work History
Education
Skills
Certification
Languages
Timeline
Generic

Joel. Mohanraj

Assistant Manager-Engineering Projects
Tirunelveli, Tamilnadu

Summary

Professional Summary

Young, enthusiastic, goal oriented Assistant manager Engineering of 17 yrs experience in Engineering Projects, Maintenance and analytical problem-solver with talents for team building, leading and motivating, as well as excellent customer relations aptitude and relationship-building skills. Proficient in using independent decision-making skills and Dedicated to applying training, monitoring and morale-building abilities to enhance employee engagement and boost performance.

Overview

18
18
years of professional experience
3
3
Certifications
8
8
Languages

Work History

Assistant Manager

Portech Engineering Pvt Ltd
Maharashtra
09.2019 - Current

HEG Site (Maintenance) :- Madhya Pradesh, Mandideep

( Nov 2022 - Present)

Assistant Manager- Engineering


Responsibility and Duties:


  • Prepare for work permit for daily work . And day to day toolbox talk meeting.
  • Daily prepare for Maintenance Work Plan .
  • Shift roaster making for Monthly basis.
  • Allocate the Manpower for shift basis.
  • Attend the HEG meeting for solution of any obstacles.
  • Every day plan and completed the daily routine maintenance work for 5T Mukand crane, 10T Mukand crane, NKM graphite cranes and furnaces.
  • Weekly Maintenance plan and completed that work on Cranes, Furnaces and Utilities.
  • Preventive maintenance and Completed the work schedule parameters for All cranes and utilities.
  • Resistant the Breakdown and do precautions of work for all cranes and furnaces.
  • Power Consumption Monitoring from Substation -14,
  • Temperature Controller circuit monitoring from MCC room.
  • Monthly parameters reading taken from motor vibration.
  • Quarterly datas collection from motors Meggering winding insulation condition checking from running plant.
  • Attending the Breakdown call of Electrical and Mechanical for Cranes.
  • Attending the Breakdown of Temperature fluctuations from RTD on Furnaces.
  • Troubleshooting of thermocouple fluctuations
  • Troubleshooting for crane Breakdown.
  • Monthly get Shutdown for DSL Maintenance and Crane Eroom wiring tightness.
  • All wiring tightness checked , sensors I/O configuration checked and cleaning.
  • Lubricants and Cleaning , Inspection for Weekly Maintenance, Preventive Maintenance, Predictive Maintenance.
  • Attending the Management group meeting for discussion daily work plan and completed job , support from Management.
  • Co-operation with Staffs of HEG operation for smoothly running work.
  • Co-ordinate to workers and guide working procedure and do work.
  • Attending the fault and solutions of the Siemens Simatic Drive G150 and Yaskawa drive.

APM Terminals - Maharashtra , Uran ( April 2022- Oct 2022)

SIEMENS ( RTG Hybrid System )(Project)

2 nos of 40ft spreaders RTGs operation through Battery System.


Responsibility and Duties:-


  • Arrange the Manpower & Work Permit for the daily work. And give tool box talk meeting on Every day Morning and Give instructions for Use PPE.
  • Arrange gate pass for workers & Material Entry.
  • Checking the Siemens BOM as per Drawing requirements for smoothly work.
  • Give the work instructions to worker and involve to do work and all.
  • Attend the meeting of obstacles points to get solution. And get planning for shutdown to do project work.
  • Removed the 650KVA DG and installation 125 KVA DG for Battery Charging purpose.
  • Extra Siemens CPU , AI module installation on Existing panel. And New DCP 3 panels mounting and wiring and Connection
  • Removed the panel from Eroom inside and mounting Brake contactors , Resistor, safety Relays installation and wiring Connection
  • Installation of 16 nos of Super Novas Battery and connection for Hoisting and long travel Container operation.
  • PLC Panels inside Micro Box PC 230V/ 24 Vdc , Scalance , Filters, Analog, Digital modules installation, Electrical Equipment mounting and wiring testing of I/O .
  • Testing of I/O Power cables ,Controls and Signals through PLC.
  • Ethernet Cable Installation and testing through Scalance Hub.
  • Co-ordinate to Siemens Team for Testing and Commissioning.
  • Taking trial of 24 hrs cycles Hoisting, LT for how much diesel taken for operation.
  • Supervised day-to-day operations to meet performance, quality and service expectations.
  • Mentored team members to enhance professional development and accountability in workplace.
  • Helped with planning schedules and delegating assignments to meet coverage and service demands.
  • Defined clear targets and objectives and communicated to other team members.
  • Improved staffing during busy periods by creating employee schedules and monitoring call-outs.

JSW SMS1 Dolvi Site. - Raigad District Maharashtra. (Sep 2020 - March 2022)

SIEMENS ( Crane Control Monitoring System)

250T Laddle Crane 3 nos, 300 T Laddle crane 3 nos

Responsibility and Duties:-


  • Arrange the Manpower & Work Permit for the daily work. And give tool box talk meeting on Every day Morning and Give instructions for Use PPE.
  • Arrange gate pass for workers & Material Entry.
  • Those who are they coming from out of state put quarantined as per Govt instructions for corona pandemic reason.
  • Checking the Siemens BOM as per Drawing requirements for smoothly work.
  • Give the work instructions to worker and involve to do work and all.
  • Attend the meeting of obstacles points to get solution. And get planning for shutdown to do project work.
  • Installation of Panels GI Pipings for signal cable of MH Motors and Brakes, MCT Motors Signal Cable routings .
  • Vibration Sensors, Pads Mounting on All Motors DE, NDE, Brakes Linear Open / Close , Vibration sensor cables laying and Testing on Analog Input Modules.
  • Temperature Sensors Installation aof Motors body frame DE, NDE Side. Cable laying and Signal testing on Panel.
  • Proximity Sensors, Cable Installation of Linear brakes Open / Close and testing from Panel
  • Antennas and Receiver installation and Ethernet cable Installation and connection and testing I/O.
  • PLC Panels inside Micro Box PC 230V/ 24 Vdc , Scalance , Filters, Analog, Digital modules installation, Electrical Equipment mounting and wiring testing of I/O .
  • Testing of I/O Power cables ,Controls and Signals through PLC.
  • FO Cables laying and splicing , Ethernet Cable Installation and testing through Scalance Hub.
  • Co-ordinate to Siemens Team for Testing and Commissioning.
  • Supervised day-to-day operations to meet performance, quality and service expectations.
  • Mentored team members to enhance professional development and accountability in workplace.
  • Helped with planning schedules and delegating assignments to meet coverage and service demands.
  • Defined clear targets and objectives and communicated to other team members.
  • Used industry expertise, customer service skills and analytical nature to resolve customer concerns and promote loyalty.
  • Recruited, interviewed and hired workers and implemented mentoring program to promote positive feedback and engagement.
  • Improved staffing during busy periods by creating employee schedules and monitoring call-outs.

JSW Dolvi Site. - Raigad District Maharashtra. (Sep 2019 - Sep 2020)

2 nos of 38 mtrs L Bucket wheel Reclaimer(L&T), 1 nos of 41 mtrs L Bucket wheel Reclaimer (L&T), 2 nos of 27 mtrs L Luffing Stackers (L &T) .


Responsibility and Duties:-


  • Arrange the Manpower & Work Permit for the daily work.
  • Those who are they coming from out of state put quarantined as per Govt instructions for corona pandemic reason.
  • Checking the BOM as per site requirements for smoothly work.
  • Give the work instructions to worker and involve to do work and all.
  • Installation of Cable tray routing, Earth routing, Cable routings , Motor Terminal side Connection, Limit Switches , Pull Chords connection for Safety E-Stop and Testing..
  • CRD Erection, 6.6KVA / 415 V Dry type Transformer Erection, Machinery House Erection all Electrical Equipment Erection and Cable connection.
  • Testing of I/O Power cables , Controls and Signals through PLC.
  • Cable installation and give guide in Slew section Energy Chain inside Power, Control Signal proper laying and Connection.
  • Instrumentation of SOV signal testing and support to Commissioning
  • Supervised day-to-day operations to meet performance, quality and service expectations.
  • Mentored team members to enhance professional development and accountability in workplace.
  • Helped with planning schedules and delegating assignments to meet coverage and service demands.
  • Defined clear targets and objectives and communicated to other team members.
  • Used industry expertise, customer service skills and analytical nature to resolve customer concerns and promote loyalty.
  • Recruited, interviewed and hired workers and implemented mentoring program to promote positive feedback and engagement.
  • Improved staffing during busy periods by creating employee schedules and monitoring call-outs.
  • Developed detailed plans based on broad guidance and direction.

Site Manager

AEC Electro Mech Projects Pvt Ltd
Mundra
12.2018 - 05.2019

Adani Chemical Plant - Kutch

Responsibility and Duties:

  • Planning and Erection of all Electrical Equipments, Power and Control cables laid as per Schemetic diagram, Cables Schedule. After Erection checked input output cable testing.
  • Oversaw employee attendance record, handled payroll, and ordered new materials for sites.
  • Resolved issues between employees and customers using company policies.
  • Created weekly and monthly reports and presentations for management team.
  • Inspected cleanliness of common areas and offices.
  • Maintained records and logs of work performed and materials and equipment used.
  • Interviewed, hired, and trained new workers.
  • Monitored, coached, and supervised team of Number employees in year.
  • Coordinated site investigations, documented issues, and escalated to executive teams.
  • Developed detailed plans based on broad guidance and direction.
  • Defined clear targets and objectives and communicated to other team members.
  • Evaluated employee performance and conveyed constructive feedback to improve skills.

Assistant Manager

Portech Engineering India Pvt Ltd
12.2016 - 11.2017
  • Siemens Automation Work ( RCOS Project at JNPT Port) (DP World 4 no’s of Quay Cranes

Responsibility and Duties:-

  • Checked the Bill of Material and Arrangements
  • Give guidelines to Staffs, worker how to do work
  • Checked the Siemens Automation Equipments and installed as per Drawing
  • Power SITOP 230v / +24 v Dc sitop installation for requirement side
  • Scalance, Microsens installation, Fiber optical cables laying and connecting Single mode Multimode installation
  • Laser Scanner installation, Power , Control connection, Doom Cameras Installation and connection with RJ 45 connector.
  • Coordination with Worker, Staffs, all Management staffs
  • Attend the Management meeting for Progress of the work
  • Daily report Send to DP World shift in-charge, Siemens Project Management, Portech ServicesWeekly report Sent to Portech Services MD, Siemens project Management
  • Coordination with Siemens automation commissioning member.
  • Supervised day-to-day operations to meet performance, quality and service expectations.
  • Maintained positive customer relations by addressing problems head-on and implementing successful corrective actions.
  • Established team priorities, maintained schedules and monitored performance.
  • Defined clear targets and objectives and communicated to other team members.

Maintenance Engineer

SVEC Engineering Constructions
Chennai Atthipattu Pudhunagar
05.2016 - 12.2016


  • Every day Maintenance work planning as per schedule.
  • Attend the Breakdown Call and Making the shift roaster every month.
  • Visually inspected and tested machinery and equipment, performing routine preventive maintenance.
  • Documented maintenance activities and confirmed compliance with relevant regulations.
  • Diagnosed and resolved machine operation variations and equipment problems.
  • Performed troubleshooting and repair for complex electrical and Electronic equipment.
  • Developed preventive maintenance schedules to minimize downtime and optimize performance.
  • Completed partial or full dismantling of equipment to quickly repair or replace defective components and restore functionality.
  • Cleaned and lubricated parts to keep equipment operating at peak performance.
  • Dismantled defective machines and equipment and installed new or repaired parts.
  • Trained and supervised staff on equipment maintenance and safety procedures.
  • Reviewed technical documentation to complete equipment maintenance and repair.
  • Worked frequently with mechanical and Electrical systems to complete knowledgeable inspections and skilled repairs.
  • Organized and directed maintenance shutdowns and startups.
  • Conducted regular inspections of equipment to promptly identify issues that could cause machinery malfunctions.
  • Inspected, tested and adjusted mechanical and electrical systems to facilitate proper functioning.
  • Replaced worn or broken parts on machines and equipment.
  • Utilized variety of tools and test equipment to troubleshoot and diagnose equipment malfunctions.
  • Repaired and replaced pumps, valves and motors.
  • Followed instructions from supervisor regarding daily job tasks and duties.
  • Detected and repaired machinery faults using electrical and manual testing methods.
  • Wrote and revised maintenance procedures.
  • Rewired and replaced faulty electrical components in equipment.
  • Safely and effectively handled wide range of cleaning products and solutions.
  • Removed trash and recyclables at end of each shift and disposed of items in proper receptacles.

Production Engineer

ANUPAM – MITSUBISHI HEAVY INDUSTRIES LTD
Gujarat
07.2011 - 10.2015

Anupam Industries Limited ( Gujarat, Anand,)

  • Electrical Erection Installation and Commissioning for Bulk Material Heavy Equipment) ( Electrical Overhead Travelling Cranes 10 ton to 50 ton, Hoists Crane 5 ton to 15 ton, Semi Gantry Cranes , Shifting Trolley)
  • Responsibility during Erection & Commissioning
  • Arrange the B.O.M ( Bill of material)
  • Checked and arrange the (power & Control) cables
  • Checked the Schematic Drawing and SLD then start Cable Wiring.
  • Checked the Panel Wirings, Drive Wirings.
  • Installation of all Equipment and connecting the wiring in the field Motors ( Hoist, LT , CT)
  • Installation Limit switch connecting the wiring and take trial and set Limit Switch Settings(CT, LT, Hoist)
  • Installation pendant and get trial operation in Push Buttons
  • Checked and adjustment for all Break Settings ( Hoist, CT, LT)
  • Maintenance work and Experience:
  • Attend the breakdown calls of cranes
  • Problem find out and give solution immediately
  • Hoist Motor and Hoist rope Change, Hoist up & down Limit Switch Settings, adjustment of Dc brake settings, Brake Release monitoring, Micro Switch Settings
  • Over Load limit switch settings
  • Attend the problems in control panel and motor drive units
  • Cross Travel motor unit find out the problem and find out immediately
  • Motor Change and check CT Limit switch settings, CT Brake Settings , Pendant Assembling
  • Long Travel motor unit find out the problem and clear immediately
  • LT motor Replace and check Break Settings, LT for/rev Limit switch Settings can be checked
  • Electrical Problem and Trouble Shooting
  • Resistor Bank Replaced
  • Electrical Control Panel Wiring & Current Collector Settings
  • All Motors be used Three phase, Dual Speed (Main /Micro)
  • ANUPAM MITSUBISHI HEAVY INDUSTRIES LTD, GUJARAT ( PIPAVAV PORT)
  • Electrical Erection and Commissioning ) 9no’s of STS container Port cranes
  • STS Container crane 13 rows S.w.L = 70 Ton = 3no's STS Container crane 22 rows S.w.L =70 Ton = 4 no's STS Container Crane 24 rows S.w.L = 70 Ton = 2no’s For Turkey project
  • Responsibilities of Duties :
  • Materials & Equipment arrangements as per GA drawings
  • Power, control, Signal cables were checked as per cable Schedule
  • Arranged the manpower for daily basis
  • Multidrives installation, Cable laying & Terminations checked as per drawings
  • All drives busbar coupling installation checked as per drawing
  • Every day follow up the work & finished the target with safety and quality is my motto
  • After installation of all Power, control, signal cable start line check
  • After the line check completed the start I/O check as per Schematic drawing
  • Alimak Elevator Electrical installation and commissioning.
  • Tray work & GI & flexible conduit pipe installation, cable installation, terminations, & Line check & Input / output checking and coordination to PLC Commissioning Engineers
  • ( Electrical Erection and Commissioning ) 3 no’s STS Gantry Crane for Mumbai Jawaharlal Nehru Port Trust
  • Supervision for all piping support work and piping work & Supervision for Erection of Power &Control Cables as per Schedule
  • Supervision for Erection for All panels & Drives
  • Inspection for Busbar connection for MCC Panel & LT Bus duct
  • Checking for all connection of Motors as per SLD Drawings
  • Materials & Equipment arrangements as per GA drawings
  • Power, control, Signal cables were checked as per cable Schedule
  • Arranged the manpower for daily basis
  • Multidrives installation, Cable laying & Terminations checked as per drawings.
  • Responsibility during Erection & Commissioning
  • Planning for the work schedule.
  • 1) Checked the BOM as per project requirement.
  • 2) All materials kept in Storage as per schedule
  • 3) Supervision for Erection Power & Control, Signal Cables as per Schedule
  • 4) Supervision for Erection for All panels & Drives, busbars Connection.
  • 5 ) Identified specific cables, fuses and circuit breakers required for assigned installations.
  • 6) Provided on-site engineering and technical services during installation and fielding processes
  • 7) Installation & commissioning for all Power & Control cables Terminations in Field line & Drive lines
  • 8) Testing for All Control circuit for R I/O panels internal & External line circuits as per Drawings
  • 9) Every day attend schedule target meeting.

Electrical Site Supervisor

TRF LIMITED, A TATA GROUP
Mangalore
01.2009 - 07.2011
  • Installation & Commissioning) for 1no Twin Boom Stacker , Bucket wheel Reclaimer, Wagon Unloader at Bellary at Karnataka
  • Responsibility during Erection & Commissioning
  • 1) Checked the BOM as per project requirement.
  • 2) All materials kept in Storage as per schedule
  • 3) Supervision for Erection Power & Control, Signal Cables as per Schedule
  • 4) Supervision for Erection for All panels & Drives, busbars Connection.
  • 5 ) Identified specific cables, fuses and circuit breakers required for assigned installations.
  • 6) Provided on-site engineering and technical services during installation and fielding processes
  • 7) Installation & commissioning for all Power & Control cables Terminations in Field line & Drive lines
  • 8) Testing for All Control circuit for R I/O panels internal & External line circuits as per Drawings
  • NMPT (New Mangalore Port Trust & (PADUBIDIRI) UPCL LANCO TRF SITE) ), (installation & Commissioning )for 2no’s of 38ton, 1650TPH, TRF GRAB SHIP UN-LOADERS.& 2no’s of 1500 TPH TRF Stacker Cum Reclaimers in UPCL at KARNATAKA lanco Site.
  • Responsibility during Erection & Commissioning
  • 1) Checked the BOM as per project requirement.
  • 2) All materials kept in Storage as per schedule
  • 3) Supervision for Erection Power & Control, Signal Cables as per Schedule
  • 4) Supervision for Erection for All panels & Drives, busbars Connection.
  • 5 ) Identified specific cables, fuses and circuit breakers required for assigned installations.
  • 6) Provided on-site engineering and technical services during installation and fielding processes
  • 7) Installation & commissioning for all Power & Control cables Terminations in Field line & Drive lines
  • 8) Testing for All Control circuit for R I/O panels internal & External line circuits as per Drawings.
  • 9) Co-ordinate with Electrical Contractors for smoothly complete project.

Electrical Technician

VINCENT ELECTRO CONTROLS
Andhra Pradesh, Vishakapatnam
06.2008 - 01.2009
  • Responsibilities during Maintenance:
  • i) Preparing Preventive Maintenance schedule
  • ii) Management of manpower allocation
  • iii) Supervising the Maintenance Work and Inspecting the Machine during running iv) Preparing Spares requirement
  • v) Submitting reports as per ISO 9001 standards 1 month worked round the clock Electrical & Electronics Maintenance experience under experienced Engineers in Electrical Level Luffing TRF 15 Ton / 10 Ton Cranes at Visakhapatnam Port Trust
  • Maintenance includes executing preventive maintenance, Weekly / Daily Inspection and submission of reports as per ISO norms, Attending Breakdown round the clock on emergency calls, Troubleshooting and normalizing as per operational requirement in short time independently.
  • Installed electrical conduit and wiring for power, controls, and lighting.
  • Replaced faulty wiring, switches and circuit breakers to reduce fire risks, boost service capacity and increase versatility.
  • Obtained measurements and readings using volt and ohm meters, meggers, IC testers and dial indicators.

Service Engineer

TVS-E SUPERB SYSTEMS & SERVICES,
Tirunelveli
07.2005 - 07.2007
  • I) Hardware Trouble Shooting.(PC & Dot Matrix Printers & Inkjet Printers) ii) Trouble Shooting in Chip level
  • Iii) Printer Sales and Service
  • Analyzed, troubleshoot and diagnosed problems and provided prompt repair and solutions.
  • Installed, configured and tested equipment on specialized platforms.
  • Completed full dismantling of equipment to quickly repair or replace defective components and restore functionalities

Education

12th - undefined

Cathedral Hr. Sec.School Palayamkottai

Diploma - Electrical Electronics Engineering

Indian Institute of Management Research and technology

Diploma - Information Technology

Kamaraj Polytechnic College, Board of Technical Education, Repair on Cathedral Hr. Sec.School

Skills

SOFTWARE SKILLS:undefined

Certification

Diploma in Japanese

Languages

Tamil
Bilingual or Proficient (C2)
English
Upper intermediate (B2)
Malayalam
Upper intermediate (B2)
Telugu
Intermediate (B1)
Hindi
Bilingual or Proficient (C2)
Gujarati
Elementary (A2)
Bengali
Elementary (A2)
Japanese
Elementary (A2)

Timeline

Assistant Manager

Portech Engineering Pvt Ltd
09.2019 - Current

Site Manager

AEC Electro Mech Projects Pvt Ltd
12.2018 - 05.2019

Assistant Manager

Portech Engineering India Pvt Ltd
12.2016 - 11.2017

Maintenance Engineer

SVEC Engineering Constructions
05.2016 - 12.2016

Production Engineer

ANUPAM – MITSUBISHI HEAVY INDUSTRIES LTD
07.2011 - 10.2015

Electrical Site Supervisor

TRF LIMITED, A TATA GROUP
01.2009 - 07.2011

Electrical Technician

VINCENT ELECTRO CONTROLS
06.2008 - 01.2009

Service Engineer

TVS-E SUPERB SYSTEMS & SERVICES,
07.2005 - 07.2007

12th - undefined

Cathedral Hr. Sec.School Palayamkottai

Diploma - Electrical Electronics Engineering

Indian Institute of Management Research and technology

Diploma - Information Technology

Kamaraj Polytechnic College, Board of Technical Education, Repair on Cathedral Hr. Sec.School
Joel. Mohanraj Assistant Manager-Engineering Projects