Project Name: Plasser India S/41909 to 2021 Version Upgrade.
- Prepared Technical Proposal for Version upgrade, also involved in Proposal & Sizing discussion with Customers.
- Performed Project Management for S/4 HANA 1909 to 2021 . Involved in End to End Technical upgrade, prepared project,Gather system Requirements.
- To consume new capabilities of S/4 upgrade. Generated SAP Innovation and Optimization Pathfinder report. which provided ready-made recommendations on areas of relevant SAP innovations, business process improvements and IT optimization potentials for SAP S/4HANA system to customer.
- Build SAP HANA Cloud Connector as link between SAP Analytics Cloud and existing on-premise systems.
Project Name: Polyhose S/41709 to 2021 Version Upgrade.
- Performed Project coordination along with Technical execution of S/41709 to 2021 for entire landscape. Also provided Go-Live and Hypercare support.
- Performed migration of FIORI HUB system from SAP FIORI FOR SAP S/4HANA 1709 to SAP FIORI FES for S/4 HANA 2021.
- As part of Polyhose upgrade project also upgraded Solution Manager ABAP + JAVA SPS level.
Project Name: MSRDC GreenField Implementation S/4 2020.
- Performed on PREMISE Implementation of S/4 HANA 2020 along with post configuration, TCI implementation, Best Practices Content Activation.
- .Performed Implementation of SAP BW4/HANA 2.0.Also Implemented SAP FIORI FES for S/4 HANA 2020 on Sybase 16.0 SP2 DB along with post steps configuration along with Rapid Activation for Fiori.
- Configured HA between SAP Application ASCS & ERS with cluster services.
- Build DR servers and configured Replication between Primary site, Secondary Site & Tertiary site.
- Worked on Enterprise Portal NetWeaver 7.5. Created Single Sing on SSO between EP to ECC ,S/4 and Third Party systems.
- For Analytics purpose, Installed Lumira Server 2.4, SAP Data Service on top of SAP BO 4.3 underlying database as SYBASE DB.
- For B2B and B2C business worked on SAP Mobile Platform 3.1,
- Worked on Installation of Identity Management (IDM).
- Also worked on Solution Manager 7.2 ABAP+JAVA system build along with Post steps.
- For load balancing purpose worked on Web dispatcher which act as entry point HTTPS request.
- Worked on Installation of Open text BCC/ICC and integration of S4 /HANA 1709 system.
- Worked on SYBASE DB for cockpit installation / Sybase backup / Sybase DB patch upgrade.
- Also performed HANA COCKPIT installation, and monitored HANA SYSTEM via HANA COCKPIT
and performed basis tasks on HANA DB via HANA COCKPIT.
Project Name: MCGM SAP Conversion ECC6 EHP7 to S/4HANA 2020 & SOH.
- Worked on AWS cloud VM creation. Performed different Cloud management activities such as Launching VM, adding Volumes, Terminating Instance, Stopping and Starting of VM. Also knowledge on Azure Cloud.
- Provided T-shirt sizing for SAP ECC6 conversion, SRM/CRM/EP for both CI+Additional Application also for New build systems like GRC,PO,Opentext,IDM,BO.
- Performed lift and shift activity from on premises to AWS cloud.
- Also part of SAP ECC6 conversion to S/4 HANA 2020.
- Performed DMO (Database Migration Option ) for SRM / CRM system. Also performed CI Migration on new server.