Summary

I am looking for a good position in the field of Piping / Mechanical Engineer in a prestigious company where previous skills and capabilities can be put to efficient use. I possess effective organizational skills and the ability to supervise a team and develop the final output.

Overview

11
years of professional experience

Work History

GULF ASIA CONTRACTING
Qatar

Piping Engineer
10.2025 - Current

Job overview

  • Designed piping systems for oil and gas applications, ensuring compliance with industry standards.
  • Conducted stress analysis on piping layouts to enhance structural integrity and performance.
  • Collaborated with cross-functional teams to develop project specifications and timelines.
  • Led design reviews to identify potential issues and implement corrective measures in piping designs.

TURBINE ELECTROMECHANICAL WLL.

Mechanical Engineer
11.2024 - 03.2025

Job overview

  • Vessel manhole opening and shell & demister cleaning then inspection, after box up.
  • Provide detail and accurately planning job package for repair and improvements to the plant equipment.
  • Desmentaling column, reactor, vessel, compressor, FD fan, Heat exchanger
  • Overhauling, compressor, replace piston pin & ring, crank pin replacing damage parts.
  • Hydro jetting exchanger bundle Tubes, cleaning, flushing.
  • Column blinding, random packing, try changing work to be procedure.
  • Column inside hot work for mesentery and safety.
  • Reactor blinding and cleaning to be work for procedure.
  • Ensure that hydro test reinstatement is to be done as per procedure.
  • Monitoring the daily work activities of Sub Contractor and updating Sub Contractor Progress Report.
  • Provide technical answers to Engineering Queries raised up by the sub-contractor confirming design drawings and standard requirement.
  • Prepare daily and weekly reports.
  • Complies with the highest level of safety during all stages of projects execution to avoid any type of accident.
  • ADNOC

GAC (CTJV)

Piping Supervisor
10.2022 - 10.2024

Job overview

  • Preparation of cutting plan, marking, fit up & inspection of weld visual with General Arrangement drawings & Fabrication drawings & marking drawing.
  • FRP pipe line And Ce metEMAT Metallic pipeline curing, bonding, cutting layout, laminating and surface preparation.
  • Installation of valve, fittings and supports.
  • Monitoring work progress.
  • To Co-ordination with Client, Sub-contractor & Engineering Department regarding technical problem.
  • Co-ordination with QA/QC for NDT & Punch point.
  • Inspection of tool tackles & material to avoid delay in fabrication & erection.
  • Monitoring of all welders in process as per WPS.
  • Witnessing welder qualification, verification and documentation of Welder progress report.
  • Supervise and lead team of worker to perform on site work.
  • Estimate the materials requirements and workers to complete the jobs.
  • Monitor job progress and ensure work at targeted schedule.
  • Prepare report on job status and project completion.
  • Man power handling.
  • Handling daily progress report, meeting with Clint, daily planning.
  • Responsible for Fabrication and Erectin from ISO Drawing.
  • Safety -Responsible for personal safety, equipment safety, other worker's safety and safe working practices for the project.
  • Studying my scope of piping lines from the layout, P & ID, and isometric drawings.
  • Follow up the status of spools and field run pipes through reports from fabrication workshop and painting yard and coordinating for transportation these materials to site.
  • Supervising fit up and welding of spool to spool or spool to field run pipe together and welding supports also (as much as possible according to accessibility) to lift and place one time (saving time and effort).
  • Coordinating with QC department to cover any required NDT or Heat treatment (preferably before lifting to avoid difficult accessibility).
  • Qatar Gas NFE PROJECT

Aarvi Encon limited.

Piping commissioning Supervisor
01.2020 - 01.2022

Job overview

  • As a Commissioning Supervisor my role is to provide Supervise installation of deluge system piping works and underground fire fighting piping works.
  • Erection of pipe supports/vent drain, valves, control valve (NRV).
  • Monitoring for debris, check joviality, dent etc.
  • Commissioning of a pipeline, Bi-Di pigging method.
  • Check and monitor tools, equipment and welding consumables.
  • Study of Spool Drawings & MTO.
  • Monitoring for Fabrication, Erection & Testing.
  • Erection of Equipments, piping including pipe supports, spool pieces control.
  • Module shop fabrication work.
  • Study of Spool Drawings & MTO.
  • Inspection of pipe supports primary as well as secondary.
  • Inspection/document verification/document control/project monitoring for fabrication/erection & precommissioning.
  • Taking care of hydro testing, water filling and dewatering after hydro testing.
  • Ensure that workers involved in the hydro-testing works are properly guided.
  • Prepare technical report; list of outstanding items on a punch list submits it for construction to carry out the required test.
  • Monitors the hydro-testing and handle reports on the completion of tests and to supervise line cleaning after hydro test.
  • Interface with electrical inspectors, civil/structural inspectors and other field engineers before proceeding for hydro-test of systems.
  • Hydrotest activities for the piping and Flowlines cleaning, pigging, gauging, water filling, pressurization.
  • Coordinate and monitors the hydro and reports on the completion of hydro tests.
  • Supervision of piping insulation for cryogenic lines.
  • Checking of all nuts & bolts.
  • Depressurizing, de-watering & flushing, air drying as well as Nitrogen purging at site.
  • Check flange alignment.
  • Prepare daily and weekly reports.
  • Identifying what are the available materials in the general store (spool pipes, valves, check valves, flanges, PSV, gaskets, stud bolts, supports) and inform the leader men.
  • Complies with the highest level of safety during all stages of projects execution to avoid any type of accident.
  • Take responsible care of own health and safety and that of others in the workplace.
  • With Thermax

Tekfen Construction.

MECHANICAL SUPERVISOR (HYDROTEST)
01.2019 - 12.2019

Job overview

  • Inspection of pipe supports primary as well as secondary.
  • Taking care of hydro testing, water filling and dewatering after hydro testing.
  • Ensure that workers involved in the hydro-testing works are properly guided.
  • Prepare technical report; list of outstanding items on a punch list submits it for construction to carry out the required test.
  • Monitors the hydro-testing and handle reports on the completion of tests and to supervise line cleaning after hydro test.
  • Interface with electrical inspectors, civil/structural inspectors and other field engineers before proceeding for hydro-test of systems.
  • Coordinate and monitors the hydro and reports on the completion of hydro tests.
  • Supervision of piping insulation for cryogenic lines.
  • Checking of all nuts & bolts.
  • Check flange alignment.
  • Prepare daily and weekly reports.
  • Care of own health and safety and that of others in the workplace.
  • SAUDI ARAMCO

TECNIMONT SAP

Mechanical Supervisor
02.2018 - 08.2019

Job overview

  • Hydro Testing for Power Plant Piping Commissioning And Nitrogen Leak Test various pumps in pump, Compressor, Filter, Scrubber(1 Stage & 2 Stage), Fin Fan And VRC With The Help of P & id Drawing.
  • Pre-commissioning activities Piping & Pipelines, Leak Test, Flushing, Cleaning, Drying, System Box-up.
  • We commissioned drag reducing agent (DRA) to reduce viscosity between pipe line and adjacent layer of pipe inner diameter.
  • Solo run test, alignment and load test run of various pumps (25%, 50%, 75% and 100% load).
  • Pre-commissioning, Commissioning and startup of Emergency Diesel Generator.
  • Inspection of pipe supports primary as well as secondary.
  • Inspection/document verification/document control/project monitoring for fabrication/erection & precommissioning.
  • Taking care of hydro testing.
  • Ensure that workers involved in the hydro-testing works are properly guided.
  • Prepare technical report; list of outstanding items on a punch list submits it for construction to carry out the required test.
  • Interface with electrical inspectors, civil/structural inspectors and other field engineers before proceeding for Commissioning of systems.
  • Check alignment of various rotating equipment before no load test run.
  • Interacting day to day activities with co-Engineers.
  • Allocation of day to day jobs to technician.
  • Estimate material, tools and equipment and arrange same.
  • Continue test run for 72 hours after introducing hydrocarbon.
  • Prepare daily and weekly reports.
  • Complies with the highest level of safety during all stages of projects execution to avoid any type of accident.
  • Take responsible care of own health and safety and that of others in the workplace.
  • ADNOC Abu Dhabi

PETRON ENGINEER PVT LTD.

Mechanical Supervisor
01.2015 - 12.2017

Job overview

  • Undertaking the work of A.G. and U.G. piping fabrication and Erection as given below as per ASME B31.1 & B31.3 and ASME SECTION IX.
  • Familiar with GAD, ISOMETRIC, and P & ID Drawings.
  • Follow the procedure for fabrication, erection, welding, NDT, PWHT & Hydro Testing for Power Plant Piping (Material Group: ASME A335, A106 B, A312, and A333).
  • To maintain record, Document & work status of relevant activity as per ISO.
  • Follow the piping supports standard and support sketch.
  • Preparation of cutting plan, marking, fit up & inspection of weld visual with General Arrangement drawings & Fabrication drawings & marking drawing.
  • To Co-ordination with Client, Sub-contractor & Engineering Department regarding technical problem.
  • Co-ordination with QA/QC for NDT & Punch point.
  • Inspection of tool tackles & material to avoid delay in fabrication & erection.
  • Monitoring of all welders in process as per WPS.
  • Witnessing welder qualification, verification and documentation of Welder progress report.
  • Supervise and lead team of worker to perform on site work.
  • Estimate the materials requirements and workers to complete the jobs.
  • Monitor job progress and ensure work at targeted schedule.
  • Prepare report on job status and project completion.
  • Man power handling.
  • Handling daily progress report, meeting with Clint, daily planning.
  • Responsible for Fabrication and Erectin from ISO Drawing.
  • Safety -Responsible for personal safety, equipment safety, other worker's safety and safe working practices for the project.
  • Studying my scope of piping lines from the layout, P & ID, and isometric drawings.

Education

SVSU

B.TECH from Mechanical Engineering

University Overview

GPA: 1st

L.N. COLLEGE BHAGWANPUR

12th

University Overview

GPA: 1st

ADARSH HIGH SCHOOL

10th

University Overview

GPA: 2nd

Skills

  • AutoCAD
  • MS-Office
  • C
  • Windows XP
  • Windows VISTA
  • Windows 7
  • Windows 8
  • Knowledge of Machines
  • Engineering Drawings
  • Complex Problem Solving

Languages

English
Hindi
Marathi

Interests

  • Playing Chess
  • Carom
  • Video games
  • Listening music
  • Playing cricket

Personal Information

  • Passport Number: AB844355
  • Father's Name: Rameshwar Rai
  • Title: Piping Supervisor
  • Date of Birth: 20/10/1993
  • Gender: Male
  • Nationality: Indian
  • Marital Status: Single
  • ID Type: Passport
  • ID Number: N3165577

Skype Id

jyotikumar21@live.com

Disclaimer

I hereby assure that all the above details are true to my knowledge and I will work with full dedication and sincerity to bring prosperity for your Concern.

Timeline

Piping Engineer

GULF ASIA CONTRACTING
10.2025 - Current

Mechanical Engineer

TURBINE ELECTROMECHANICAL WLL.
11.2024 - 03.2025

Piping Supervisor

GAC (CTJV)
10.2022 - 10.2024

Piping commissioning Supervisor

Aarvi Encon limited.
01.2020 - 01.2022

MECHANICAL SUPERVISOR (HYDROTEST)

Tekfen Construction.
01.2019 - 12.2019

Mechanical Supervisor

TECNIMONT SAP
02.2018 - 08.2019

Mechanical Supervisor

PETRON ENGINEER PVT LTD.
01.2015 - 12.2017

SVSU

B.TECH from Mechanical Engineering

L.N. COLLEGE BHAGWANPUR

12th

ADARSH HIGH SCHOOL

10th