Pioneer in Exhaust systems for Passenger Cars , Supplying both catalytic converters and
Mufflers for Major OEMs like Hyundai , KIA , FORD , Nissan , PSA
Yanmar
Role : Industrial program leader , Capacity manager for India , GBD Process Expert, INDUSTRIAL DEVELOPMENT
Responsible for the work packages execution for the Industrial Development of the Program at the Plant: industrial footprint, CAPEX definition, Plant equipment selection (new / reuse / share), Plant layout, internal flows, industrial trials
Capacity Management for all India FCM and identifying CAPEX requirements for upcoming business
Responsible for the launch planning and budget from definition till execution
Participate in the development of Make or Buy strategy in accordance with Purchasing, Program and Plant(s)
Be responsible for HSE and ergonomic convergence in the Plant
PROCESS DEVELOPMENT
On behalf of the plant, approval of all upstream Process Development activities (M-BOM, Production Line Definition, Equipment List, Tooling & Equipment Definition & Sourcing from supplier kick off until final acceptance, HSE & Ergonomics)
Process and Machine Capabilities, line capacity, Direct Labor, PPM, Scrap-rework rate, change over time and on-time delivery
Designing Process with high robustness to optimize line balance , reducing Skill level and 3Ms
Optimize the CAPEX through the footprint, capacity analysis and the equipment selection
Optimize layout and Process flow as per the guidelines of Lean Industrial design
PRODUCTION LAUNCH
Management of launch activities (Run at Rate) at the Plant and staffing of the extended support team until the full validation
Support the production during the ramp-up after the handover to the Plant
Support Engineering Change Management as necessary
Report all Industrial Development risk analyses and associated action plans
Report on Plant launch activities to the Plant
KEY ACHIEVEMENTS
Successfully launched three New Programs (Kappa Improvement – KIA motors , Bi3 – Hyundai Motors , Gamma 2 – KIA.Motors) and awarded as Key contributor for the Green Launch
Achieved Scrap value < 0.22% against sales
Introduced karakuri between work stations to ease the material handling and to reduce work space
Launched the program by meeting all key metrices such as cycle time , rework , UPH as per the program assumptions
Expertise in GBD Canning process and Well excuted in “IOT” Industry 4.0 and implemented traceability system with retention period of 15 years
Played lead role in VAVE project and resulted with annual savings of 150 lakhs INR / annum through the Yield improvements and localisation projects
Awarded 1st place in Poka yoke competition across Southern region conduced by ACMA.
Asst. Manager, Engineering Graduate Trainee
M/S WHEELS INDIA LIMITED, TVS
CHENNAI
07.2010 - 07.2018
Products :Air Suspension Components for Luxury buses,ICVs, Trucks & Trailors , Lift axles and also Wheels for Various ranges of Vehicles from Light Passengers to Earth Mover
Budget preparation, Capex Proposal creation for Cost Reduction & Business Process Excellence projects
Responsible for introducing automations , Layout optimisation and improving process capability
Meeting On time delivery of New products to customer through project planning
Developing Team members & supervisors to build strong team in New product development for process standardisation & to sustain manufacturing system
Preparing APQP documents for Prototype models
Coordinating Lean improvement projects to Control material wastage & meet the expected manufacturing yields
Part of CFT to close Customer complaint & Internal rejections through proper CAPA
KEY ACHIEVEMENTS
Improve customer service & collaboration-First pass yield by 15% & OTD by 30% in air suspension division using Value stream Mapping & Lean
Compliance on quality – Reduced rework retention time in the system by 50%
Improve manufacturing capability -OEE 74% achieved from the level of 56% using SMED & Fundamentals of Factory physics
Implemented Lean culture in manufacturing floor -Visual factory , 5S, through a technique called Self Directed work teams.
Education
B.E - Mechanical Engineering
PSNA Engineering College
08.2006 - 05.2010
Skills
12 years of Rich experience in Process designing, New product development, Project Management, Lean Manufacturing, Manufacturing Strategy, P & L Management , Business plan, VAVE , Industrializationundefined
Additional Information
EXTRA CURRICULUM
, Won Excellence Award in National Level Quality Circle Competition Conducted by QCFI
Won Par Excellent Award In Poka-Yoke Competition Conducted By QCFI
Won Bronze award ACT SUMMIT-2015 conducted by ACMA.
Selected as Unsung Hero by ACT ACMA -2015.
Won Third place in Southern Zone level SMED competition conducted by ACMA 2016
Won several competition like Kaizen, SMED, Quality Circle & Case study presentation conducted by QCFI, ACMA.
Shortlisted for ACMA 4th Case Study Competition Finals and participated with 4 case studies.
Won Platinum Award in Poka Yoke Competition conducted by QCFI.
Awarded as best Improvement Idea contributor of the month
SHIFT INCHRAGE (PRODUCTION SUPERVISOR) at FAURECIA EMISSION CONTROL TECHNOLOGYSHIFT INCHRAGE (PRODUCTION SUPERVISOR) at FAURECIA EMISSION CONTROL TECHNOLOGY