Execution of Erection,Testing & Commissioning of Pumped Storage Plant(PSP Projects), Hydro Power and Solar Power
Kurnool
Summary
Versatile Assistant General Manager with 18+ years of experience overseeing Pumped Storage Plant,Hydro and Solar Plant Project execution. Decisive planner and analytical problem solver with skill in managing teams to meet stringent objectives. Personable and collaborative demeanor demonstrated through polished communication and willingness to apply team feedback to resolve challenges.
Looking for the opportunities to improve technical and professional acumen. Would like to handle challenging assignments and give them a better shape through innovative ideas.
Equipped with strong problem-solving abilities, willingness to learn, and excellent communication skills. Poised to contribute to team success and achieve positive results. Ready to tackle new challenges and advance organizational objectives with dedication and enthusiasm.
Overview
17
17
years of professional experience
4
4
Languages
2
2
Certificates
Work History
Assistant General Manager
Greenko AP01 Integrated Renewable Energy Pumped Storage Plant
01.2023 - Current
Experience in Execution of Erection, Testing, Commissioning, Project Management of following equipment’s
Assembly & testing of Stators & Rotors.
Commissioning of 18KV Generators in Pump and Turbine mode.
Erection, Testing & Commissioning of 400KV GIS.
Installation, testing & commissioning of 300MVA Generator Transformers.
Testing & Commissioning of Units in Turbine mode and Pump mode.
Testing & commissioning of all Protection system.
Testing & commissioning of all control system.
Erection, Testing & commissioning of HT/LT Switchgear, DC System.
Power and control cable laying, termination and signal checks as per cable schedules.
Embedded and Surface Earthing of Power house.
Installation of Cable trays.
Installation, Testing & Commissioning of Fire Fighting system.
Installation, Testing & Commissioning of HVAC System.
Studying the scope of work and erection schedule, Timelines of various Erection activities, co-ordination with OEM for Mobilization of Resources, Material delivery plan and site catch up plan for timely execution and completion of Installation, Testing & Commissioning.
Providing technical support to design & Engineering and quality departments and initiating the necessary corrective actions.
Study of Primary/Secondary drawings to ensure proper functioning of various equipment’s, checking of interlocking conditions and logics
Testing and commissioning of HV and EHV system along with high voltage testing at site as per IEC standards.
Testing and commissioning of Protection circuits and relays /Relay settings.
Contractor interaction and interpreting their needs and requirements.
Preparation of test protocols, as built schemes, daily and weekly Progress report.
Analyze and Review of Technical specifications, GA, Scheme drawings and Layouts.
Identify and resolve technical issues and problems that arise during the Installation, Testing & Commissioning.
Monitor compliance to applicable codes, practices, QA/QC policies, performance standards and specifications.
Cooperate and communicate effectively with HOD and other participants to provide
Monitor compliance to applicable codes, practices, QA/QC policies, performance standards and specifications.
Coordinate with Quality team and preparing punch points of installing equipment’s and same communicating to contractors for completion.
Coordinate with Quality team and preparing Field Observation Report of installing equipment’s and same communicating to contractors for rectification.
Coordinate with Quality team and preparing Site Engineering Request of equipment engineering improvements and send to HO team for approval.
Reviewing and closing of punch points and Field Observation Reports.
Certifying the bills at second level.
Participated in planning process to achieve corporate objectives.
Fostered and promoted cooperative and harmonious working climate conducive to maximum employee morale, productivity, and effectiveness.
Facilitated cross-functional collaboration to drive successful project completion within deadlines.
Collaborated with department heads to establish goals and work plans.
Informed VP of unusual matters of significance and launched corrective action plan.
Reviewed performance results to target and take corrective measures with authorization and escalation.
Established strong partnerships with stakeholders, fostering a collaborative work environment.
Coordinated efforts between departments for seamless execution of projects, increasing overall success rates.
Promoted a culture of continuous improvement by encouraging feedback from employees at all levels.
Fostered a high-performance environment through setting clear expectations and recognizing achievements.
Maintained qualified staff and communicated areas of accountability and expected performance.
Implemented new systems for better data management, leading to improved decision-making processes.
PROJECT: AP01 IREP PVT LTD is a Pumped Storage Hydro Power Plant with Installed capacity of 1680MW having 8Nos of Vertical Francis Pump Turbine of 240MW-6No’s and 120MW-2No.
Senior Manager
GHANI SOLAR PARK MEGA PROJECT
03.2017 - 12.2022
Install the mounting racks or frames to ensure the mounting systems are positioned at the correct orientation and angle to maximize solar exposure.
Connect the solar panels to the electrical system, ensuring proper wiring to the inverter and the grid.
Perform a comprehensive system check to ensure the entire solar power system is functioning properly.
Set up monitoring systems to track performance and energy output. Identify and resolve any issues that arise during the operation.
Improved the safety environment in the entire plant.
Established strong relationships with clients and stakeholders, ensuring long-term partnerships and repeat business.
Implemented and developed operational standards, policies and procedures.
Held monthly meetings to create business plans and workshops to drive successful business.
Provided strong leadership to enhance team productivity and morale.
Led cross-functional teams to achieve project milestones and deliver high-quality results.
Reduced costs, optimized resource allocation, and improved efficiency in managing projects.
Mentored junior staff members for skill development and career progression within the organization.
Managed budgets effectively, achieving financial objectives while maintaining strict control over expenditures.
Managed large-scale projects and introduced new systems, tools, and processes to achieve challenging objectives.
Achieved operational excellence by streamlining processes and implementing best practices.
Implemented innovative solutions to overcome challenges, leading to enhanced productivity levels.
Implemented risk management framework, mitigating potential threats to project success and company operations.
Evaluated employee performance and conveyed constructive feedback to improve skills.
Established team priorities, maintained schedules and monitored performance.
Established performance goals for employees and provided feedback on methods for reaching those milestones.
Manager
AMR HYDRO POWER PVT LTD
03.2009 - 02.2017
Experience in Erection, Commissioning, Project Management, Operation and Maintenance of following equipments
Embedded and Surface Earthing, Synchronous Generator.
11KV/110KV Switchyard, HT/LT Switchgear, DG Set, Control & Protection Panels.
EOT Crane, 110VDC battery Charger, 455AH Battery bank, Motors, Cable tray, Power& Control Cable.
Numerical Relays, Electromechanical Relays, Static Relays, Energy Meters.
Lighting, Air Compressors.
Expert working experience in trouble shooting, operation and maintenance of process PLC machines (Allen-Bradley).
Maintaining the case history and electrical component consumption of each Equipment.
Expertly performed Trouble shooting and Maintenance of Instrumentations are RTD,BTD, Limit Switches, Pressure Transmitters, Ultrasonic Water Level Transmitters, Hydro Static Water Level Transmitters, Radar Sensor, Proximity Sensors, Flow Switches, DC & PCValves, Annunciators, Encoders, Timers and temperature controllers.
Responsible for planning, strategic decision making, organizing and leading and controlling total operations of the Plan.
Handling end to end plant operations in conjunctions with guidelines and SOP"s.
Periodically inspecting the logbooks, checklists and PPM schedules for a better management of plant operation.
Preparing the daily energy reports on daily basis, through this planning the some energy conservative activities for increasing the power efficiency.
Preventive maintenance and conditional monitoring (daily maintenance) to be carried out for equipments as per SOPs (standard operating procedures).
Responsible for planning a critical spares list for all process and utility equipment as per equipment manufacturer’s recommendations and inventory.
Break down reports, MTBR (mean time between repairs) and Machine running efficiency reports preparation.
Handling AMC (annual maintenance contract) works.
Experience on internal auditing.
Allocating of job orders to sub ordinates.
Improved the safety environment in the entire plant.
PROJECT: AMR HYDRO POWER PVT LTD is a Hydel Power Plant with Installed capacity of 60MW having 12Nos of Horizontal Kaplan S-Type Water Turbine of 5MW each.
Assistant Engineer Trainee
SAGAR POWER PVT LTD
06.2008 - 02.2009
Roles and Responsibilities:
Learning on Safe and efficient operation of plant equipment’s
Involving on DGR ,Weekly ,monthly ,CDM & Outages report preparation
Assisting to in charges regarding Maintenance of documents
Coordinate with all other departments all activities that are related to plant operations during the shift.
Assisting to Shift In charges on Monitoring and Controlling of water levels
Following of shift relieving procedure as per policy
Coordinate with mechanical shift engineers during Start & Stop the machines
To take control of all kind Tools and spares issued from stores
Knowledge on plant equipment’s ,Standard Operation Procedure& SMP
Know the Dos and Don’ts on Plant equipment’s
Executing Job related other works assigned by superiors
Involving maintenance activities along with seniors guidance
PROJECT: SAGAR POWER PVT LTD is a Hydel Power Plant with Installed capacity of 4.3MW having 2Nos of Horizontal Kaplan S-Type Water Turbine of 2.15MW each.
Education
Bachelors of Engineering - Electrical Engineering
Prakasam Engineering College
Kandukur, India
04.2001 -
Skills
Project Management
Timeline
Assistant General Manager
Greenko AP01 Integrated Renewable Energy Pumped Storage Plant
01.2023 - Current
Senior Manager
GHANI SOLAR PARK MEGA PROJECT
03.2017 - 12.2022
Manager
AMR HYDRO POWER PVT LTD
03.2009 - 02.2017
Assistant Engineer Trainee
SAGAR POWER PVT LTD
06.2008 - 02.2009
Bachelors of Engineering - Electrical Engineering
Prakasam Engineering College
04.2001 -
Work Availability
monday
tuesday
wednesday
thursday
friday
saturday
sunday
morning
afternoon
evening
swipe to browse
Quote
There is a powerful driving force inside every human being that, once unleashed, can make any vision, dream, or desire a reality.
Assistant Manager & Land Head at Greenko AP01 IRESP Private Lmitted -5160 MWAssistant Manager & Land Head at Greenko AP01 IRESP Private Lmitted -5160 MW
Deputy Manager at Integrated Personnel Services Ltd. ( off role of Sterling and wilson renewable energy limited)Deputy Manager at Integrated Personnel Services Ltd. ( off role of Sterling and wilson renewable energy limited)