KADAM SINGH PARIHAR

KADAM SINGH PARIHAR

Project Quality Manager-Transmission And Distribution.
Nowgong

Summary

To join an organization that provides enormous career growth opportunity. My aim is to excel in the position entrusted upon me and to be an asset to the organization I join.

14+ years of experience in Projects Like- ISO 9001 2015 Lead Auditor Course & Transmission line-765kv/400kv/220kv & 66kv Transmissions Line (Civil Foundation, Pile Foundation Tower Erection, Conductor Stringing Work) &Substation Electrical Power Industry with knowledge in Erection of 11 KV HT Line, Distribution Transformers, Underground Cabling of 11 KV XLPE cable, LT Line and Single-phase static energy meters. Experience in Project of PROJECT MANAGEMENT, RGGVY, DDUJGY, RQM, DPR, PMC, SOLAR,” etc. Working with KALPATARU PROJECTS INTERNATIONAL LTD. As Deputy Manager-Lead Quality-(QA/QC) Jaisalmer Rajasthan. Notice Period- 3 Month.

Thorough Quality Assurance Manager creates successful quality assurance strategies and processes. Accomplished at identifying deficiencies and initiating solutions to problems. Experienced performing both process and outbound inspections.

Organized and dependable candidate successful at managing multiple priorities with a positive attitude. Willingness to take on added responsibilities to meet team goals.

Overview

14
14
years of professional experience
1
1
Certification
1
1
Language

Work History

Quality Assurance Manager

KEC International
12.2025 - Current
  • Provided training to employees on best practices in quality management, fostering a culture of excellence within the organization.
  • Managed and archived quality documentation and participated in internal and external quality audits.
  • Updated quality control standards, methods, and procedures to meet compliance requirements.
  • Improved quality processes for increased efficiency and effectiveness.
  • Increased customer satisfaction through adherence to quality standards and customer requirements.
  • Evaluated quality problems and performed assessments to identify and resolve issues.
  • Managed root cause analysis investigations, determining underlying issues in product failures and implementing corrective actions as necessary.
  • Followed quality standards and procedures to minimize errors and maximize customer satisfaction.
  • Enhanced customer satisfaction by monitoring and addressing customer complaints promptly and efficiently.
  • Calibrated instruments and scales in production area and quality lab.
  • Coordinated and oversaw periodic audits to evaluate product quality and safety and address non-conformances.

DEPUTY MANAGER-LEAD (QA/QC)

KALPATARU PROJECTS INTERNATIONAL LTD
11.2024 - Current
  • The QA/QC will have overall responsibility for construction (Civil, Mechanical, and Electrical) activities of all transmission lines.
  • The QA/QC engineer will be responsible for checking and guiding the work of contractors in Transmission Line.
  • The timely completion of all project activities with the required quality.
  • Coordinate all technical activities at the sites to make sure that the construction/implementation of project is according to the engineering standards and Technical Specifications are as per the contract document.
  • PROJECT NAME: 1-765KV A&B: D/C RAMGARH to BHADLA 3- T/L.
  • CLIENT NAME- POWER GRID CORPORATION OF INDIA LIMITED

TEAM LEADER-SURVEYOR (QA/QC)

BUREAU VERITAS (INDIA) PVT. LTD
12.2020 - 10.2024
  • The QA/QC will have overall responsibility for construction (Civil, Mechanical, Electrical) activities of all transmission lines.
  • The QA/QC engineer will be responsible for checking and guiding the work of contractors in Transmission Line.
  • The timely completion of all project activities with the required quality.
  • Coordinate all technical activities at the sites to make sure that the construction/implementation of project is according to the engineering standards and Technical Specifications are as per the contract document.
  • Ensure that all tests are performed at the site for the various items
  • Review material submitted by contractors for compliance with the BOQ and specifications and to check compliance of QC requirements as per approved QC plan of the project.
  • Ensure that the contractors comply with their work plans to complete work within the specified time frame.
  • Ensure that the contractor provides the laborers with the safety equipment and overseeing health and safety matters on site.
  • Check and review the works quantity reported by contractor for interim payments.
  • Prepare daily record of work progress at sites and update project manager about work progress on weekly or bi-weekly basis
  • Apply the QC plan for monitoring, reporting and supervision strategy that will help in better implementation of contract guidelines in sub-project activities
  • Be able to correctly organize and file technical project documents.
  • Preparing of close out documents as per the project close out procedures
  • ICT capacity - (3x500 MVA), 765/ 400 KV-ABB Hitachi Ltd.
  • Shunt Reactor- (3x110 MVAR) –for 765KV Bus - Siemens Ltd (1x125 MVAR)- for 400 KV Bus- Siemens Ltd.
  • Inspection of finished Foundation and checking the dimension of grouting bolts
  • Inspection of lattice structure erection and checking alignment, tightness of Bracing angles, Nut bolts, washers.
  • Observing installation of equipment’s, Physical checking of base tightness.
  • Witnessing Leveling, Centering, Marking of AIS module.
  • Installation of CT & Breaker module, Erection of Switch gear, Isolator & Earth switch, Bus Bar, Line Bay modules
  • Inspection of Store stacking Materials and Equipment’s and Documentation audit.
  • Verify Inspection Report, Field Quality Plan, Bill of Materials, packing list to ensure quality of material.
  • Preparation of conformity report and non-conformity report of different Electrical Equipment’s and Materials.
  • Inspection of ROD earthing installation & checking of earth resistivity as per standard Code of practice & approved drawing.
  • PROJECT NAME: 1-132KV DC RAMJILAN to MORWA/WAIDHAN T/L (LINE A).
  • 2- 132KV DC RAMJILAN to MORWA/WAIDHAN T/L (LINE B)
  • 3- 220KV DC SIDHI to HINDALCO T/L (LINE A)
  • 4- 220KV DC SIDHI to HINDALCO T/L (LINE B)
  • 5-220/132/33KV BARGAWAN SUB-STATION.
  • CLIENT NAME- MP POWER TRANSMISSION PKG-II LTD.
  • PROJECT NAME: 1-66KV MITAP-2 AIS SUB-STATION MUNDRA.
  • 2-66KV DC TL FROM C2C SS TO BHADRESHWER TRANSMISSION LINE PROJECTS MUNDRA.
  • 3-66KV LILO MITAP 62/O TO C2C SS MITAP 2.
  • 4-66KV DC FOR PORT RING NETWORK
  • CLIENT NAME- MPSEZ UTILITIES LIMITED(ADANI).
  • PROJECT NAME: 1-765 KV /400KV LILO TRANSMISSION LINE BHUJ, GUJARAT.
  • 2-220KV-700MW AEML WIND AND SOLAR PROJECTS BHUJ, GUJARAT.
  • 3-765/400 KV LAKADIA AIS SUB STATION, GUJARAT.
  • CLIENT NAME- WRSS XXI (A) TRANSCO LTD, ADANI / ADANI GREEN ENERGY LIMITED.

SENIOR ENGINEER

TATA PROJECTS LIMITED
07.2018 - 12.2020
  • The QA/QC will have overall responsibility for construction (Civil, Mechanical, Electrical) activities of all transmission lines.
  • The QA/QC engineer will be responsible for checking and guiding the work of contractors in Transmission Line.
  • The timely completion of all project activities with the required quality.
  • Coordinate all technical activities at the sites to make sure that the construction/implementation of project is according to the engineering standards and Technical Specifications are as per the contract document.
  • Ensure that all tests are performed at the site for the various items
  • Review material submitted by contractors for compliance with the BoQ and specifications and to check compliance of QC requirements as per approved QC plan of the project.
  • Ensure that the contractors comply with their work plans to complete work within specified time frame.
  • Ensure that the contractor provides the labors with the safety equipment and overseeing health and safety matters on site.
  • Check and review the works quantity reported by contractor for interim payments.
  • Prepare daily record of work progress at sites and update project manager about work progress on weekly or bi-weekly basis
  • Apply the QC plan for monitoring, reporting and supervision strategy that will help in better implementation of contract guidelines in sub-project activities
  • Be able to correctly organize and file technical project documents.
  • Preparing of close out documents as per the project close out procedures
  • PROJECT NAME: 400KV D/C BHADLA 2 -BHADLA (PG) LINE (TWIN HTLS).
  • CLIENT NAME- POWER GRID CORPORATION OF INDIA LIMITED
  • PROJECT COMPLETE: - RGGVY, 12TH PLANE RAYAGADA ODISHA, SAUBHAGYA PROJECTS CHITRAKOOT.

SITE INCHARGE

PHILIPS LIGHTING INDIA LTD
08.2017 - 04.2018
  • The scope of work covers supply, installation and testing of solar based LED Street light at different drilling camps of CMPDI. It covers
  • Supply of solar based minimum 7 LED Street light with 4.5-meter (above ground) pole, PV module, battery and all other necessary accessories required for the successful commissioning of the system.
  • All the civil work with materials required for installation of street light including excavation, RCC work for making pedestal.
  • All the mechanical work with materials required for installation and successful commissioning of street light.
  • All the electrical work with materials required for installation and successful commissioning of street light including wiring earthing etc.
  • Testing and measuring the lumen of street light after successful completion of work.
  • PROJECT NAME: -ATAL JYOTI YOJANA (AJAY) of Ministry of New Renewable Energy (MNRE), Government of India.

SITE ENGINEER

REC POWER DISTRIBUTION COMPANY LIMITED
12.2013 - 07.2017
  • Monitoring and inspection of villages covered under “RGGVY” 11th and 12th plan which includes quality and quantity inspection of HT Line (11KV), Distribution transformers, LT Line and single-phase energy meters provided to BPL consumers.
  • Preparation of reports based on the deficiencies and defects found.
  • Regular meeting with DISCOM regarding progress of work, quality and quantity inspection of various materials and rectification of deficiencies in the executed work.
  • Provide solution to the problems of the contractor and ensuring that work gets completed in efficient manner.
  • Full information sharing and progress report on daily basis.
  • Ensure that the work gets completed on time and at the agreed-upon cost.
  • Experience in Project of “RGGVY, DDUJGY, RQM, DPR,PMC” etc.
  • Project name: - Project Management Consultant (PMC).

LAB INCHARGE

M/S SANGHVI CABLE IND.PVT.LTD.
08.2013 - 12.2013
  • I was working on 1.5Square MM Cable Conductor Testing etc.

PRODUCTION ENGINEER (MECHANICAL)

SHREE SIDHDATA ISPAT PVT.LTD.
06.2012 - 07.2013
  • I was working on Rolling mill, cold Rolling, Hot Rolling etc.
  • Furnace, sheath Bhatti, pickling process etc.

Education

B.E - Electrical Engineering

Rajiv Gandhi Technical University
01.2012

Senior Secondary -

Higher Secondary School
Nowgong
01.2007

Matriculation - undefined

Higher Secondary School
Nowgong
01.2005

Skills

Transmission and distribution of electricity

Accomplishments

  • Collaborated with team of 7 Number in the development of Projects of 765Kv to 66kv Tl and 11kv Distribution projects and Solar Projects.

Certification

Licensed [Lean six sigma Green Belt] - [November 2025]

INDUSTRIAL TRAINING:

  • Madhya Pradesh Poorv Kshetra Vidyut Vita ran Company Ltd, Chhatarpur.
  • I have undergone four weeks training at the Transmission Division, Chhatarpur in June-July 2009.Here I took training in Electricity Transmission from high voltage level to low voltage levels. Here I also got to know about various electrical equipment used in a substation.

DECLARATION:

I hereby declare that the above-mentioned information is true to the best of my knowledge. 

Place: Jaisalmer, Rajasthan 

Date: (KADAM SINGH PARIHAR)

Work Availability

monday
tuesday
wednesday
thursday
friday
saturday
sunday
morning
afternoon
evening
swipe to browse

Languages

English
Upper intermediate (B2)
Hindi
Advanced (C1)

Timeline

Quality Assurance Manager

KEC International
12.2025 - Current

Licensed [Lean six sigma Green Belt] - [November 2025]

11-2025

DEPUTY MANAGER-LEAD (QA/QC)

KALPATARU PROJECTS INTERNATIONAL LTD
11.2024 - Current

TEAM LEADER-SURVEYOR (QA/QC)

BUREAU VERITAS (INDIA) PVT. LTD
12.2020 - 10.2024

SENIOR ENGINEER

TATA PROJECTS LIMITED
07.2018 - 12.2020

SITE INCHARGE

PHILIPS LIGHTING INDIA LTD
08.2017 - 04.2018

SITE ENGINEER

REC POWER DISTRIBUTION COMPANY LIMITED
12.2013 - 07.2017

LAB INCHARGE

M/S SANGHVI CABLE IND.PVT.LTD.
08.2013 - 12.2013

PRODUCTION ENGINEER (MECHANICAL)

SHREE SIDHDATA ISPAT PVT.LTD.
06.2012 - 07.2013

Matriculation - undefined

Higher Secondary School

B.E - Electrical Engineering

Rajiv Gandhi Technical University

Senior Secondary -

Higher Secondary School