Summary
Overview
Work History
Education
Skills
Accomplishments
Languages
Certification
Timeline
Interpersonal Skill
Areas Of Interest
Interest Hobbies
Languages
Extracurricular Activities
Training
Projects
Interpersonal Skill
Personal Details
Hi, I’m

KALAISELVAM A

Madurai
KALAISELVAM A

Summary

Project Lead - With Over 9 Years of Professional Experience in the Construction Industry

To work in a challenging atmosphere by exhibiting my skills with upmost sincerity and dedicated smart work by being innovative, inspirational and work for growth of your esteemed organization. Forward-thinking project management specialist confident in leading team members, managing schedules and coordinating resources. Keeps projects on-track with decisive supervision and quick problem-solving. Persuasive in communicating and negotiating with internal team members, vendors and other stakeholders.

Overview

9
years of professional experience
1
Certificate

Work History

JONES LANG LASALLE PROPOERTY CONSULTANTS INDIA PVT LTD - JLL
Chennai

Project Lead
01.2019 - Current

Job overview

  • Developed and maintained project schedules using MS Project software.
  • Maintained records of all documents related to projects including cost estimates, work orders.
  • Ensured compliance with applicable laws, regulations, codes and standards related to planning engineering activities.
  • Evaluated existing processes and identified areas for improvement in order to increase efficiency and reduce costs.
  • Analyzed data from multiple sources to identify opportunities for improvement in processes or procedures.
  • Worked effectively on teams of 25 site managers, sub-contractors and other engineers to complete projects before expected due dates.
  • Developed risk management plans based on potential risks associated with projects being undertaken by the organization.
  • Prepared detailed reports on cost estimates, labor requirements, material costs and other variables relevant to projects.
  • Monitored project performance to ensure adherence to budget, schedule, quality standards and safety regulations.
  • Coordinated with suppliers and subcontractors to ensure timely delivery of materials needed for projects.
  • Organized and coordinated project meetings to review progress, discuss changes and provide updates.
  • Provided guidance on resource allocation strategies across various departments involved in a particular project.
  • Provided technical support throughout the life cycle of a project by troubleshooting problems that arise during its execution.
  • Created presentations outlining key aspects of each project such as objectives, timelines.
  • Participated in change control process by assessing impact of proposed changes on overall timeline or budget of a project.

HYUNDAI ENGINEERING CO. LTD (HEC INDIA LLP)
Anantapur

QS & Planning Engineer
09.2017 - 12.2018

KNK CONSTRUCTION PVT LTD
Bangalore

QS & Planning Engineer
05.2015 - 08.2017

Education

RVS Technical Campus
Coimbatore, Tamilnadu

Bachelor of Engineering from Civil Engineering
05-2015

University Overview

University/Board: Anna University, Chennai

Tamilnadu Polytechnic College
Madurai, India

Diploma from Civil Engineering
04-2012

University Overview

University/Board: Department of Technical Education, Chennai

Koodakovil Nadars Higher Secondary School
Koodakovil, India

SSLC
05-2009

University Overview

University/Board: State Board of School Examinations, Tamilnadu

Skills

  • Skills in Primavera (P6) - R8 & PPM
  • Skills in MS-Project
  • Skills in Auto CAD, 3ds Max, Pro-steel
  • Skills in Staddpro, Revit Architecture
  • Microsoft Office Word, Microsoft Office Excel, Microsoft Office Power Point
  • Photoshop
  • Client communications
  • Requirements Gathering
  • Project Management
  • Resource Allocation
  • Requirements Analysis
  • Client Relations
  • Project development
  • Project Coordination
  • Stakeholder Management
  • Project Documentation
  • Risk Analysis
  • Project Scheduling
  • Scope Management
  • Project Planning
  • Risk Management
  • Quality Control
  • Root Cause Analysis
  • Leadership skills
  • Cost Control
  • Cost Management
  • Specification Writing

Accomplishments

  • Multiple times Got PDS Super Star & Star in JLL
  • Got first place in Design Competition conducted by CEBACA
  • Won 1st prize in “Master Builder”, held at NSS College of Engineering, Palakkad.
  • Won 1st prize in “Clay Modeling”, held at Karunya University, Coimbatore.
  • Won 1st prize in “Evolve Sky Scraper”, held at Amirta University, Coimbatore.
  • Won 1st prize in “Technical Quiz”, held at Karunya University, Coimbatore.
  • Won 1st prize in “Clay Modelling”, Amirta University, Coimbatore.
  • Won 2nd prize in “Model making”, held at PSG College of Technology, Coimbatore.

Languages

Tamil
First Language
English
Advanced (C1)
C1
Hindi
Upper Intermediate (B2)
B2
Kannada
Intermediate (B1)
B1
Malayalam
Intermediate (B1)
B1
Telugu
Beginner (A1)
A1

Certification

  • Master Diploma in Building Design in CADD Centre
  • Project Planning and Management in Synergy
  • Associate Member (AMIE) in The Institution of Engineers

Timeline

Project Lead

JONES LANG LASALLE PROPOERTY CONSULTANTS INDIA PVT LTD - JLL
01.2019 - Current

QS & Planning Engineer

HYUNDAI ENGINEERING CO. LTD (HEC INDIA LLP)
09.2017 - 12.2018

QS & Planning Engineer

KNK CONSTRUCTION PVT LTD
05.2015 - 08.2017

RVS Technical Campus

Bachelor of Engineering from Civil Engineering

Tamilnadu Polytechnic College

Diploma from Civil Engineering

Koodakovil Nadars Higher Secondary School

SSLC

Interpersonal Skill

  • Ability to rapidly build relationship and set up trust.
  • Confident and Determined
  • Ability to cope up with different situations.
  • Ability to do the work at required time.

Areas Of Interest

  • Project Scheduling & Monitoring
  • Quantity Surveying
  • Structural Engineering
  • Bar Bending Schedule
  • Estimation
  • Analysis
  • Earth quake Structures
  • Structural Design

Interest Hobbies

Cricket, Hearing music, Reading books.

Languages

English, Hindi, Tamil, Kannada, Malayalam, Telugu

Extracurricular Activities

Won 1st prize in “Master Builder”, held at NSS College of Engineering, Palakkad. Won 1st prize in “Clay Modeling”, held at Karunya University, Coimbatore. Won 1st prize in “Evolve Sky Scraper”, held at Amirta University, Coimbatore. Won 1st prize in “Technical Quiz”, held at Karunya University, Coimbatore. Won 1st prize in “Clay Modelling”, Amirta University, Coimbatore. Won 2nd prize in “Model making”, held at PSG College of Technology, Coimbatore.

Training

  • I have completed the course of Project Planning and Management in Synergy. NIKETA CONSTRUCTIONS PVT LTD, Coimbatore (December 2013)
  • Participated in the “PRE-EMPLOYMENT TRAINING PROGRAM” (11/02/2015 to 14/02/2015) conducted by CEBACA at Coimbatore.
  • Got first place in Design Competition conducted by CEBACA.
  • I have completed Course of “MASTER DIPLOMA IN BUILDING DESIGN” in CADD Centre, Coimbatore.

Projects

CURRENT - PROJECT: 

OLA CELL GIGA FACTORY – POCHAMPALLI, KRISHNAGIRI

(FROM FEBRUARY’23 TO PRESENT)

  • This project is consist of Land development Works, RCC, Steel (Pre-Engineered Building), Roofing works, Masonry Wall works, SFRC Flooring works, RCC Road Works, Hume Pipe Works, External Infra Works, Dry Room, Non-Dry Room, 110 KV Switch Yard Works, FPS, HVAC, Electrical, Plumbing & Other utility Service works.
  • Total Land Area – 44 Acres and Built-up Area - 5.3 Lacs Sft.
  • This project is inclusive of following area i.e. Capacity - 5GWh Giga Block (Anode + Cathode), Utility Block, Canteen, ETP, STP, WTP, Security Office, Metering / Control Room, Electrolyte Warehouse, Cooling Tower, Roads & Drain, Reservoir, Fire Water Tank, Fire Brigade, Parking Areas, MRS Room, 110 Kv Substation & etc.

PAST - PROJECTS: 

TVS SRICHAKRA LIMITED – VELLARIPATTI, MADURAI

(2 YEARS 1 MONTH)

  • This project is consist of RCC, Steel (Pre-Engineered Building), Roofing works, Masonry Wall works, VDF Flooring works, RCC Road Works, Hume Pipe Works, External Infra Works.
  • Built Up Area - 3.5 Lacs Sft
  • This project is Inclusive of following packages i.e. OHT - Main Plant, Press Pit, Machine Foundation, Service Block, Preparatory for OHT, R&D Centre, Power House, OHT FG, Road, Drain & etc.

TPI BLADE MANUFACUTING FACILITY – VALLAM, CHENNAI

(1 YEAR 5 MONTH)

  • This project is consist of Piling, RCC Structures, Steel (Pre-Engineered Building), Roofing works, Precast Process Trench Works, Precast Wall works, Wall Paneling, FM3 & FM2 Flooring works, Fire Fighting Works, HVAC Works and Electrical Works, STP Works, Plumbing works, Waterproofing Works, Hume Pipe Works, Interior Works, RCC Works.
  • Built Up Area - 7.41 Lacs Sft
  • This project is consist of following packages i.e. Shop Building, Utility Block, Maneuvering Area, Paint Booth, Hazardous Store, Trim Booth, Spine Road, Drain Works, STP Works, Plumbing Works, Fire Protection System, AHU, Chiller, 110 KV, 11 KV& etc.

MRF TCR MIXING PLANT EXPANSION – TRICHY

(8 MONTHS)

  • This project is consist of RCC Structures, Steel (Pre-Engineered Building) & Steel Structure works, Roofing works, Machine foundation works, Wall Sheeting, RCC Laser Screed Flooring works, Deck Slab Concrete Works.
  • Built Up Area - 6 Lacs Sft
  • This project is consist of following packages i.e. Banbury, Carbon Godown, Office Area, IT, Toilet Tiling & Plumbing works & etc.

INDIA KIA MOTORS 300,000 UNITS PRODUCTION PLANT – PENUKONDA, ANDHRAPRADESH

(1 YEAR 3 MONTHS)

  • This project is consist of RCC Structures, Steel (Pre-Engineered Building), Roofing works (TPO), Wall Paneling, Steel Fiber Reinforced Concrete Flooring, Epoxy Flooring, Plumbing works, Waterproofing Works, Canal & Hume Pipe Works, Interior Works.
  • Land Area – 536 Acres
  • This project is inclusive of 5 production Plants i.e. PRESS, BODY, ENGINE, ASSEMBLY & PAINT SHOP and other subsidiary buildings i.e. WWTP, UTILITY, FIRE STATIONS, TOWNSHIP, TEST TRACK & etc.

CONSTRUCTION OF STUDENT HOUSING BH 09 - BITS PILANI GOA

(1 YEAR 4 MONTHS)

  • This project is consist of RCC Structures, Steel, Plumbing works, Waterproofing Works, Tiling Works, Decorative Tiling and False ceiling works. This project is located on the Sloped Area with more undulation. The Base of the project is rest on the Hard Rock Morum.
  • This project is G+2 (2 Flat floors and Last Floor is Sloped Roof)

CONSTRUCTION OF WIPRO CORPORATE OFFICE K2 - KORAMANGALA, BANGALORE:

(3 MONTHS)

  • This project is consist of Geo-Technical, shotcreting, RCC Structures, Steel, Plumbing works, Waterproofing Works.This project is located in the very congested area. The Base of the project is Clay soil.
  • This project is inclusive of 3 Basements (12m from the NGL) and G+6 floors.

CONSTRUCTION OF 4200 SQM PRODUCTION PLANT – TOYOTA BANGALORE :

(8 MONTHS)

  • This project is consist of both Concrete and Steel Structure works. This project base is constructed 13m above the Natural Ground Level with using of Filled Soil.The foundation of the project is done with Cast in situ Piling and above that Pile caps.And Grade Beams, Pedestals, Columns, Brackets, Roof Slabs. In the Steel Structures consist of Wind Columns, Steel Beams, Trusses, Lattice Girders, Crane Girders, Fall Arresters, Bracings, Sag Rods, Cladding Runners, Louvers, Cat Walk, Canopy and Louvers.

Interpersonal Skill

  • Ability to rapidly build relationship and set up trust.
  • Confident and Determined
  • Ability to cope up with different situations.
  • Ability to do the work at required time.

Personal Details

  • Date of Birth : 23-Jan-1994
  • Age : 30 Years
  • Passport No : L9831736
  • Passport Expiry Date : 10-Jun-2024
KALAISELVAM A