To leverage my experience in New Product Introduction (NPI Design) within the Aerospace Industry.Talented in transforming detailed technical specifications into efficient, effective and quality designs. Seeking new job opportunities to develop my capabilities that can be utilised for the overall development of an organization.
Currently working as an Engineering analyst for the NPI design team ( Specific to Compressor). The main part is to implement the design change by using the UG Nx tool along with the analysis and using the PLM Teamcenter and PDM Prod for documentation purposes like document uploading, new part number creation and replacement and updating the Design plan on the Design Space tool for the project planning based on a process like DTA/APQP process. Preparation of technical documents to support the design change like Component requirement document (CRD), Design definition report (DDR), and Interface design document(IDD) along with DFMEA creation to analyse its failure effects and causes and finally closing of the project in DESIGN SPACE by following one of the project planning processes like DTA process or APQP process
Design and Implementation of Solar Panel on E- Rickshaw :
Published on: May 2022
This paper includes a Review of the implementation of solar panels on E-Rickshaw about the capacity of Solar panels according to the number of passengers and the limited speed of E-Rickshaw with consideration of the resistant forces. Due to the continuous charging of the battery from the solar panel, the range of the vehicle increased to nearly triple the times.